The cost to build a house in Spain depends on the land, the size, the specification, the plot and the town hall, so no single price per m² is reliable, and we do not quote new builds. What we can give you is the full list of costs to budget and a hard comparison: renovating an existing house or villa on the Costa Blanca costs €600 to €1,200 per m², VAT not included, and takes 3 to 6 months.

  • Fixed, itemised quote, free and with no obligation
  • Site visit within 48–72 h in Alicante and 45 km around
  • One project manager from start to finish
Illustrative image: renovated villa with a terrace
Illustrative image: renovated villa with a terrace.
On this page
  1. The honest answer: it depends, and here is what to budget
  2. Step 1: the land and whether it is buildable
  3. Step 2: project, architect and licence
  4. Step 3: construction cost and what moves it
  5. Taxes, fees and VAT in general terms
  6. The stages of a new build, and where money goes
  7. Specification levels: what changes the price
  8. Self-build, turnkey or a managed project
  9. Guarantees and insurance on new buildings
  10. Buy and renovate versus build
  11. Timeline: why building takes longer than you expect
  12. Building from abroad
  13. Common mistakes when building a house in Spain
  14. When to call a professional
  15. Next step

The honest answer: it depends, and here is what to budget

There is no reliable single price per m² to build a house in Spain, because the plot, the design and the specification move the total more than the construction rate does. A flat site next to services is a different project from a sloping plot with a retaining wall and a long drive. A basic standard is different from a villa with a pool, bespoke joinery and a landscaped garden. Any website that gives you one figure without those details is selling an average that may not apply to you.

We are a renovation company and we do not quote new builds, so we will not invent a build price. What we can do is give you a reliable picture of what to budget for, and a comparison with something we do price: renovating an existing house or villa on the Costa Blanca costs €600 to €1,200 per m², VAT not included, and takes 3 to 6 months. For many buyers, that is the better route.

Budget item What it covers How to get the real figure
Land Plot price, notary, registry and taxes Agent and solicitor
Project and fees Architect, technical architect, surveys, geotechnical report Architect quotes
Licence and taxes Licencia de obra mayor, municipal construction tax, fees Town hall and architect
Construction Structure, envelope, installations, finishes Two or three itemised builder quotes
Connections Water, electricity, sewage or septic tank, access Utilities and builder
Outdoor works Retaining walls, pool, landscaping, boundary walls Builder quotes
Furnishing and extras Kitchen, bathrooms, wardrobes, air conditioning Suppliers or your builder
Contingency Ground conditions, changes, delays Your own reserve

Step 1: the land and whether it is buildable

The first and biggest risk in building a house in Spain is the plot. Not every plot can be built on, and a plot being for sale does not mean it has a building licence. Before you pay anything beyond a small reservation, ask your solicitor to check:

  • The classification of the land in the local plan, and whether it is buildable and what the maximum built area is.
  • Access and services: road, water, electricity, drainage and telecom.
  • Any restrictions: coastal protection, protected areas, easements and neighbours' rights.
  • Whether a house already exists and whether it is legally registered, including any extension.
  • Ground conditions: slope, rock or fill, which affect foundations.

On the Costa Blanca, many plots on slopes have good views and extra costs in retaining walls and foundations. This is where budgets move.

Step 2: project, architect and licence

A new house needs a technical project drawn up by an architect, and a licencia de obra mayor from the town hall before work begins. The project fixes the design, the structure and the specification, and it is the document builders price from. Fees for the architect and for technical supervision come on top of the construction cost. The licence process takes time and varies from town to town, so start it early and ask your architect for a realistic estimate for your town hall.

Our guide to the major works licence explains when a project and licence are needed, and our guide to declaración responsable explains the lighter route that applies to smaller works and renovation.

Step 3: construction cost and what moves it

The construction cost is what a builder charges to build to the project. It moves with:

  • Built area and the shape of the house: simple shapes cost less than complex ones.
  • Specification: windows, flooring, kitchen, bathrooms, joinery, air conditioning or aerothermal.
  • Structure and ground: foundations, retaining walls and slopes.
  • Energy and installations: insulation, heating and cooling, solar, water heating.
  • Exterior: pool, terraces, garage, boundary walls and landscaping.
  • The builder and the market: availability of labour and materials.

To compare, ask two or three builders to price the same project from the same documents, itemised by chapter. A quote that cannot be compared line by line is not a quote; see our guide on how to read and compare a renovation quote, most of which applies to new build.

Taxes, fees and VAT in general terms

When you build, you pay taxes and fees beyond the build price. In general terms:

  • VAT on the construction of a new home is charged at a reduced rate for housing. Check the rate and conditions at the time of your project.
  • Municipal construction tax and the licence fee are paid to the town hall, and the amounts vary by town.
  • Land purchase taxes, notary and registry fees apply to the plot.
  • Professional fees for the architect, technical architect and any surveys.

We do not give rates here, because they change and depend on your case. Confirm them with your solicitor or gestor before you decide.

The stages of a new build, and where money goes

Knowing the order of work helps you see when each cost arrives. A typical new house goes through foundations and structure, walls and roof, windows and external doors, internal partitions, plumbing and electrical installations, plastering and waterproofing, tiling and flooring, kitchen and bathrooms, painting and then the exterior works. The structure and envelope are usually the largest share of the cost, and the finishes are where the budget is most flexible, so decisions about windows, flooring, kitchens and bathrooms are where you can make a house cheaper or dearer without touching the structure. Payments are normally tied to completed stages; ask your builder for a schedule that matches the stages rather than a large advance.

Specification levels: what changes the price

The same footprint can cost very different amounts depending on the specification. When you compare quotes, ask each builder to state the specification line by line, so that you can see differences in:

  • Windows and glazing: PVC or aluminium, standard or low-e double glazing. See our windows page for the comparison.
  • Insulation and energy performance: thicker insulation and better glazing cost more to build and less to run, and they feed into the energy certificate. See our energy certificate page.
  • Heating, cooling and hot water: a split system, ducted air conditioning or aerothermal. An aerothermal system in our renovations costs €6,000 to €12,000, VAT not included.
  • Kitchen and bathrooms: a kitchen renovation costs €7,000 to €18,000 and a bathroom €5,500 to €12,000 in our market, which gives a guide to what fitting out costs.
  • Flooring and joinery: porcelain, wood-effect or natural stone, and standard or bespoke doors and wardrobes.
  • Exterior: pool, terraces, garage, boundary walls and landscaping. A pool renovation of 30 to 40 m² costs €4,000 to €15,000, which gives a sense of the scale of a pool project, although a new pool is a different job and we do not build them.

Self-build, turnkey or a managed project

There are three common ways to organise a build. In a turnkey contract, one builder delivers the finished house for an agreed price from the project, which gives you cost certainty and one responsible party. In a managed project, an architect or project manager coordinates separate trades, which gives you more control and more of your own time and risk. In a self-build, you coordinate everything yourself, which is the cheapest on paper and the most demanding in practice, especially from abroad. Whichever you choose, put the scope, price, schedule and guarantee in a written contract; see our guide on what a renovation contract should include, because the principles are the same.

Guarantees and insurance on new buildings

New residential construction in Spain comes with legal guarantees for defects, and your architect and solicitor should explain which insurance or guarantee applies to your project and who provides it. Do not assume a builder's verbal promise replaces this. Ask for the guarantees in writing, and ask what is covered, for how long and whom to claim against. Our guide to renovation guarantees in Spain explains the same questions for renovation work.

Buy and renovate versus build

For many buyers on the Costa Blanca, buying an existing property and reforming it is simpler, quicker and cheaper than building, though not always. The comparison:

Build a new house Buy and renovate a house or villa
Starting point A plot An existing structure
Design freedom Full Limited by the structure and planning rules
Permits Project and licencia de obra mayor Often a declaración responsable or lighter licence, major works if you touch the structure
Time Land search, project, licence and construction 3 to 6 months of works for a villa renovation
Cost certainty Lower at the start; many unknowns Higher after inspection, with a fixed quote
Risk Land, ground and permits Hidden defects in the existing building

Our price for renovating a house or villa is €600 to €1,200 per m², VAT not included, depending on the state and the finishes. A visit before you buy shows whether the structure is sound and what the work will cost; see our villa renovation and full home renovation pages. The reduced 10% VAT rate may apply to renovation of a private home more than two years old, which can make renovation attractive; see our guide to reduced VAT on renovations.

Timeline: why building takes longer than you expect

A new build has more stages before the first brick: finding and checking the plot, commissioning the project, obtaining the licence, tendering the works and only then construction. Each stage depends on someone else, such as the architect, the town hall and the utilities, so total time is rarely short. A renovation has fewer stages and a shorter critical path: a house or villa renovation takes 3 to 6 months on site, after the visit, the quote and the paperwork. If you need to be in the property by a certain date, that matters.

Building from abroad

If you are in the UK or elsewhere, building adds a lot of decisions that you have to make remotely. Make sure you have an independent professional watching the project, written contracts and payments tied to stages, regular site reports with photos and a local representative you trust. A power of attorney can be useful, but take advice on its scope. Do not pay large sums before a licence and a contract are in place. Our guide on choosing a builder in Spain lists the red flags.

Common mistakes when building a house in Spain

  • Buying a plot without checking it is buildable. This is the most expensive mistake.
  • Budgeting from one figure per m². The plot and the specification decide the cost.
  • Forgetting outdoor works and connections. Pools, walls, access roads and utilities add up.
  • Skipping the contingency. Ground conditions and changes are normal.
  • Starting before the licence. Unlicensed work can be stopped and penalised.
  • Comparing builders on the total only. The scope and the specification must match.
  • Paying too much up front. Tie payments to stages.

When to call a professional

You need a solicitor to check the land and the contracts, an architect to design and obtain the licence, and a builder who will price the project. A handy owner cannot do any of these safely. If you want a second option, call us before you commit to a plot: we can visit existing houses and villas, tell you honestly what they need and give a fixed quote for the renovation to compare with a new build.

Next step

If you are weighing a new build against buying a house or villa to renovate on the Costa Blanca, we will visit a property within 48 to 72 hours and give you a fixed, itemised quote. See our builders on the Costa Blanca page, our guide to planning and budgeting a renovation and contact us.

Frequently asked questions

How much does it cost to build a house in Spain?

It varies widely with the specification, the plot, the architect and the town hall, so any single figure per m² would mislead you. Budget for the land, the project and fees, the licence and taxes, the construction itself, utilities connections, landscaping and a contingency. We do not quote new builds; ask an architect and two or three builders for itemised quotes.

Is it cheaper to build or to buy and renovate in Spain?

It depends on the plot, the existing house and the standard you want. On the Costa Blanca, renovating a villa costs €600 to €1,200 per m², VAT not included, and takes 3 to 6 months, and you avoid the land search and much of the permit timeline. Building gives you a new design and a new structure but takes longer and has more decisions and risks.

Do you build new houses?

No. We renovate existing homes, villas, flats and commercial premises. If you are weighing building against buying a house to reform, we can visit a property and give you a realistic renovation price to compare.

What licence do I need to build a house in Spain?

A new house needs a technical project by an architect and a licencia de obra mayor from the town hall. The process and timeline vary by town, and the plot must be buildable under the local plan. Check the plot's status before you buy it.

What taxes apply when building a house in Spain?

In general terms, there is VAT on the construction (new homes are generally subject to the reduced rate for housing), a municipal tax on construction works and fees for the licence, plus taxes related to the land purchase and the deed. Rates and conditions change, so confirm them with your solicitor or gestor.

What are the hidden costs of building in Spain?

The usual hidden costs are the plot's access and utilities connections, retaining walls and ground work on a slope, a pool and landscaping, furniture and fittings, the cost of the licence and surveyors' fees. A contingency for ground conditions and changes is wise.

Can you help me assess a property to renovate instead?

Yes. We visit the property, tell you honestly what it needs and give a fixed, itemised quote after inspection. For owners abroad, we can start with photos and a video call.

Updated:

Get your free quote

Tell us what you want to renovate. We reply within 24 working hours and arrange a free, no-obligation visit.

📞 960 292 180
or email us at info@reformascostarenova.com

📞 CallHome Free quote