On this page
- What you actually look at when choosing a renovation company
- Table: red flags and what to check
- The quote: the first test
- Insurance, registration and paperwork: what you do not see on site
- References, finished jobs and the technical visit test
- Payments: by milestones and no large deposits
- Common mistakes
- When to call a professional
What you actually look at when choosing a renovation company
A reliable renovation company is recognised by five things: a fixed, detailed, itemised quote; public liability insurance and business registration you can check; references to real jobs; payment by milestones with no large deposit; and a named person who will be accountable throughout the work. Everything else (a nice website, a low price, sales patter) is noise.
We say this knowing that we are a renovation company and that you may read this guide with scepticism. That is why we do not talk about "why choose us", but about what to check in any company, ours included. If one of the red flags in this guide sounds like something we have done to you, you can hold us to it.
Context matters: in Alicante and on the Costa Blanca there is enormous demand for renovation (1960s to 1980s flats to bring up to date, coastal apartments bought by foreign residents, villas on urbanisations), and that attracts serious companies and people who are not. The owner who lives abroad and renovates at a distance, very common in Playa de San Juan, Torrevieja or Benidorm, is the favourite target of the second group, partly because of the language barrier and partly because they are not there to see the site.
Table: red flags and what to check
Every red flag has a simple check; if you cannot make the check, the flag is confirmed. This table summarises the ten most common.
| Red flag | What to check | What should happen |
|---|---|---|
| Global quote with no line items | Ask for an itemised breakdown with measurements | It arrives within days, with units and prices |
| Price far below the others | Compare line by line | Something is missing: services, waste, licences, material grades |
| Large deposit before starting | Ask for a payment schedule by milestones | Proportionate first payment, rest by stages, last on handover |
| Cannot prove liability insurance | Ask for proof it is in force | Provided without fuss |
| No NIF or company name given | Ask for tax details and an invoice | Provided, and invoiced with VAT |
| "It is cheaper without VAT" | Always get an invoice | No invoice means no guarantee and no claim |
| Does not visit the property before quoting | Ask for a technical visit | Measures, asks, photographs, checks the services |
| Cannot show finished jobs or references | Ask for two or three you can verify | Gives you contacts or visits |
| Pressure to sign today | Ask for time to compare | A serious quote is valid for weeks |
| Nobody is accountable for the job | Ask who the site manager is | One person, with a name, from start to finish |
If a company fails on one, ask. If it fails on two or more, look elsewhere.
The quote: the first test
A fixed, detailed, itemised quote is the best proof of seriousness, because it forces the company to measure, to define grades and to commit to a price; a one-line global quote commits to nothing. It is the easiest check and the most revealing.
What it should contain:
- Itemised lines with unit of measure (m², linear metre, unit), quantity and unit price: demolition, masonry, plumbing, electrics, tiling, joinery, painting, cleaning.
- Defined grades: not "porcelain floor" but format, price band or an indicative reference; not "taps" but type and range.
- What is included and what is not: waste management and skip, licence or declaración responsable, protection of common areas, final clean, finishing materials chosen by the client.
- Timescale and conditions (for example, "from confirmation of materials").
- Payment by milestones, validity of the quote and guarantee.
When you compare several, compare line items. The guide on how to read and compare a Spanish renovation quote gives you the method. As an order of magnitude, a full flat renovation costs €450 to €900 per m², VAT not included, and a complete bathroom €5,500 to €12,000, VAT not included; a figure far below that range deserves one question: what is missing?
A note on VAT (IVA in Spain): renovation of a private home can be charged at the reduced 10% rate if conditions are met (the home is more than two years old and materials are less than 40% of the taxable base). It is a legal advantage and comes with an invoice. Anyone offering you "without VAT" is not doing you a favour: they are leaving you with no invoice, no guarantee and no claim. We explain it in the guide on the reduced 10% VAT rate on renovations in Spain.
Insurance, registration and paperwork: what you do not see on site
Before signing, ask the company for three documents: proof of public liability insurance in force, tax details (company name and NIF) and confirmation that the workers are registered; if the job involves an architect's project, also the health and safety documentation. Nobody serious objects to showing them.
Public liability insurance
This is what pays if the work damages your home, a neighbour (the leak into the flat below is the classic case) or a third party (a tool falling into the courtyard). Without it, you pay for the damage or you pay in court. Ask for the certificate or the receipt in force and check that the insured activity is renovation and the cover is reasonable for the size of the job.
Business registration and invoicing
A real company has a registered name, a NIF, a business activity registration (IAE) and invoices with VAT. Ask for them before signing and check that the quote, the contract and the invoice carry the same details. It is a two-minute check that rules out anyone working without a structure. If you are not confident reading Spanish paperwork, your gestor or solicitor can confirm a NIF in minutes.
Registered workers and safety
Operatives must be registered with the social security system, whether employees or subcontractors. On projects with an architect (major works) there are also documented health and safety obligations. It is not just legality: an accident to an uninsured worker in your home can lead to liability for you as the owner.
Licences and paperwork
Ask expressly who files the declaración responsable or the minor works licence with the town hall. A serious company includes it and gives you a copy of the filing receipt; one that tells you "you do not need that" for a bathroom renovation with new services is exposing you to a stop notice. The detail is in the guide on minor works licence in Alicante.
References, finished jobs and the technical visit test
The best reference is a finished job you can see or a client who will take a call; the second best is how the company behaves on the technical visit, because as it quotes, so it builds. Both tests cost little and rule out a lot.
On references:
- Ask for two or three recent jobs in your area (Alicante, Elche, San Vicente, Benidorm) of a similar type to yours: a bathroom if you are renovating a bathroom, a full renovation if that is what you are doing.
- Be wary of generic reviews ("very professional, everything perfect") with no detail of which job or when. Real reviews mention problems and how they were resolved.
- Ask your administrador de fincas. They know which companies have worked in buildings like yours and which caused problems with the community.
- If you live abroad and are renovating at a distance, ask to speak to another owner who has renovated at a distance with them: it is a case with its own demands (progress photos, payments, keys), and an English-speaking fellow owner will tell you exactly how it went.
On the technical visit: a serious company visits the property, measures, photographs, asks what you want and why, looks at the consumer unit, the stopcocks, the condition of the soil stacks and windows, and asks about the community and access. One that quotes a 1970s flat in Carolinas by phone or from photographs without setting foot in it does not know what it will find behind the tiles; and what it does not know, it will charge for later as an extra.
We offer a technical visit within 48 to 72 hours in Alicante and the surrounding area (45 km) and a fixed itemised quote, free and without obligation. We do not say this as a sales pitch but as a benchmark: ask the same of any company you compare.
Payments: by milestones and no large deposits
The right way to pay is by milestones of completed work: a proportionate first payment on signing to buy materials, interim payments on completing stages and the last on handover; a large deposit before starting is the clearest red flag of all. The money should follow the work, not run ahead of it.
A reasonable scheme for a full renovation: an initial payment on signing the contract, payments on completion of services, of tiling and flooring, of joinery, and a final payment on handover with a joint inspection. For a bathroom, two or three milestones. What matters is not the exact percentage, but that each payment corresponds to work done that you can see, in person or in photographs.
Red flags in payments:
- Asking for most of the sum before starting, "for the materials".
- Asking for cash payments without an invoice.
- Changing the payment schedule during the job or asking for "an advance" to carry on.
- A final payment that is small or non-existent: the final payment on handover is your guarantee that the details get finished.
All of this should be in the contract. The guide on what a renovation contract in Spain should include has the detail. A practical note for owners paying from a UK or Irish bank: a milestone schedule also gives you the dates to arrange transfers, so a late payment is never the reason the job stops.
Common mistakes
- Choosing on total price. The cheapest quote is usually cheapest because something is missing. Compare line items and ask what is not included.
- Not asking for the liability insurance "so as not to be a nuisance". It is the document that protects you. Asking for it is normal.
- Accepting "without VAT" as a saving. No invoice means no guarantee, no claim, no reduced 10% VAT, and no way to prove the work to the community or your insurer.
- Signing without a contract "because there is already a quote". A signed quote works as a contract if it has timescales, payments and a guarantee; if it does not, it does not.
- Paying a large deposit to "reserve a date". It is the classic mechanism of jobs that never start or are abandoned halfway.
- Not asking who the site manager is. If the answer is "the boss drops by now and then", the job will be run by whoever is there that day.
- Being rushed by urgency. "I can only start if you sign this week" is a sales argument, not a technical one. A serious quote is valid for weeks.
- Renovating at a distance without an agreed follow-up system. Progress photos, payment milestones tied to those photos and a single point of contact are essential if you are not in Alicante.
When to call a professional
Every check in this guide you can do yourself in one or two weeks: ask for documents, compare quotes, call references and talk to your administrador. What you must not do is skip them out of haste or personal trust. A neighbour who "knows someone" is no substitute for insurance and a contract, and this applies doubly to recommendations from the bar or the expat forum.
There are two situations where outside help is worth having:
- Jobs with an architect's project (major works, structural changes, change of use from commercial to residential): besides the company, there is an architect or technical architect who directs the work and certifies it. It is an added layer of control and the técnico can help you assess quotes.
- Renovation at a distance of a coastal apartment: look for a company that already works that way, sending photos and video, with payment milestones tied to progress and management of keys and the community.
At Costa Renova we work with commitments you can check: a fixed, detailed, itemised quote, free and without obligation; a technical visit within 48 to 72 hours in Alicante and the surrounding area (45 km); a single site manager from start to finish; a written guarantee on the work; and management of licences and the declaración responsable with the town hall. You can see our prices on the renovation prices page and ask for the technical visit for your full home renovation in Alicante through contact. And if, having read this guide, you decide to compare us with other companies, that is fine by us: it is exactly what we recommend.
Frequently asked questions
How do I know if a renovation company in Spain is reliable?
Ask for a fixed itemised quote, proof of public liability insurance, the company's NIF (tax number) and details so you can check it exists and is registered, and references for jobs you can see or verify. Also watch how it behaves at the quoting stage: if it is slow, does not measure, asks no questions and gives a single global figure, that is how the job will go.
What should a serious renovation quote in Spain include?
Itemised lines with measurements and unit prices, materials with defined grades, labour, waste management, licences and paperwork, timescale, payment by milestones, guarantee and what is excluded. A one-line quote with a global price cannot be compared and gives you nothing to claim against.
Is it normal for a Spanish builder to ask for money up front?
A first payment on signing to buy materials is usual, but it should be proportionate and tied to milestones. A large deposit before starting, with no contract and no invoice, is the clearest red flag of all. What is reasonable is a payment schedule by completed stages, with the last payment on handover.
What insurance should a renovation company in Spain have?
Public liability insurance (seguro de responsabilidad civil) that covers damage the work may cause to your home, to neighbours or to third parties. Ask for proof it is in force. Workers must also be registered with the Spanish social security system; on projects with an architect, health and safety documentation is required too.
Can I ask a Spanish builder for references?
Yes, and you should. Recent jobs you can visit or clients who will take a call are the best proof. Be wary of generic reviews with no detail and of anyone who cannot show a single finished job in your area. You can also ask your administrador de fincas (the block's managing agent), who knows which companies work well in buildings like yours.
What happens if I hire a company with no registration or insurance?
If something goes wrong (a leak into the flat below, an accident to a worker, a job abandoned halfway) you have nobody to claim against, your home insurance may not cover you, and if there is a workplace accident the liability can fall on you as the owner. The apparent saving of a price without VAT becomes a risk with no safety net.
How many renovation quotes should I get in Spain?
Three is a good number: enough to compare and not so many that you lose track. Compare line items, not totals: a big difference is usually in what is missing, not in what is extra. If one is far cheaper than the other two, ask what it does not include before celebrating.
What guarantee does a renovation company in Spain give?
Whatever appears in writing in the quote or contract, in addition to the legal responsibilities that apply. At Costa Renova a written guarantee on the work is one of our commitments. Be wary of verbal guarantees or very long periods with no document behind them.
Updated: