- What a unit project is and what it is for
- Full project or technical report: which one applies
- What a unit renovation project usually includes
- Who signs it and what responsibility it carries
- How the project, the builder and the quote relate
- What to be clear about before commissioning the project
- Particulars of a unit in Alicante
- Common mistakes
- When to call a professional
- Visado, declaración de competencia and other terms
- What to ask your technician for in writing
- How to spot a weak project
- How much time to allow
- Next step
What a unit project is and what it is for
The project is the technical document that describes what will be done in the unit, how it complies with regulations and with what installations. It serves three purposes at once: to apply for the permit from the town hall, to let builders price exactly the same job, and for someone with responsibility to certify at the end that what was planned was done.
For a business, it is also the tool that prevents paying twice. With a good project the works quote resembles what is eventually spent; without one, the quote is built on assumptions, and each assumption is a possible extra.
Full project or technical report: which one applies
The difference depends on the scope of the works, the activity and what your town hall requires, not on anyone's preference. The table gives a general idea and does not replace what your technician tells you.
| Situation | Usual document | Notes |
|---|---|---|
| Painting, floors and minor changes without touching installations | Sometimes none, or a description of the works | What the town hall's minor works procedure asks for is enough |
| Interior refurbishment with a new layout and installations | Technical report or basic and execution project | Common in shops, offices and clinics |
| Unit that changes its activity | Activity and works project or report | Usually adds justification of noise, ventilation and accessibility |
| Works touching structure, facade or roof | Full project | Normally with a major works licence |
| Hospitality with kitchen and extraction | Activity and installations project | More documentation and sometimes reports from other authorities |
If in doubt, the right question to the technician is: "What document does my town hall ask for with this activity and these works?" For the general framework, see declaración responsable for building works.
What a unit renovation project usually includes
A well-made project answers what is there today, what there will be tomorrow and how it is checked. The typical blocks are these:
- Descriptive report: use of the unit, floor area, planned activity, current state and proposed works.
- Drawings: current and renovated state, with layout, dimensions, toilets and evacuation routes.
- Regulatory justification: compliance with the relevant technical building code, accessibility, fire safety and the conditions of the activity.
- Installations: electrics, lighting, air conditioning and ventilation, plumbing and drainage, and extraction if there is a kitchen.
- Measurements and budget: items with quantities, which allow offers to be compared.
- Specification: minimum qualities and method of execution.
- Health and safety study or equivalent plan, when the works require it.
Not every project contains everything; what matters is that the contents answer what the works demand.
Who signs it and what responsibility it carries
A competent technician signs, and signing means answering for what is signed. Which qualification is valid depends on the works and installations: where there is a change to the structure or use, an architect is usually involved; for specific installations, an engineer; for minor interior refurbishments, a technical architect or engineer may be enough. Do not rely on a general rule: ask the town hall or the technician to confirm it for your case.
Two more roles are worth knowing:
- Site supervision (dirección facultativa): the technician who oversees the works and issues the completion certificate. It may be the same person who wrote the project.
- Health and safety coordination: required depending on the type of works; the builder must apply its own measures in any case.
A project without site supervision loses much of its value, because nobody checks that what was built matches what was drawn.
How the project, the builder and the quote relate
The project comes first, the fixed quote next and the works last. When the order is reversed, surprises appear.
- Your technician writes the project based on your business idea.
- Two or three builders price against the same document.
- You choose, and a contract is signed with scope, timeline and payment terms.
- During the works, changes go through the technician and are noted.
- At the end it is closed with a certificate and documentation.
This is how we work at Costa Renova: we carry out the works to your technician's project, give a fixed quote by item with a single point of responsibility, and handle the works declaración responsable. Most of the cost of a unit renovation is works and installations, not project: €300 to €800 per m² for a commercial unit and €600 to €1,200 per m² for hospitality with installations, IVA not included.
If you are not sure how to compare offers, see how to read and compare a Spanish renovation quote and what a renovation contract should include.
What to be clear about before commissioning the project
The better you define the business, the fewer times the project is redone. Take these answers to the technician:
- The exact activity and, if possible, the expected capacity.
- The number of workstations and toilets you think you will need.
- Whether there will be a kitchen, a workshop, a stock room or high-power machinery.
- Hours and noise: music, extraction, cold rooms.
- Maximum budget and target opening date.
- The lease or deeds of the unit, and the statutes if there is a community.
With that information the technician can tell you early whether the unit is viable. If it is not, better to know before paying for works. For that earlier stage, our guide on business licence and opening a shop or bar in Alicante explains the full order of steps.
Particulars of a unit in Alicante
A unit's problems are usually set by the building. On the ground floors of blocks from the 1960s to the 1980s it is common to find old installations, low clear height and slabs that limit partitions or loads. In coastal areas, salt air calls for resistant materials in joinery and outdoor elements. If the unit sits below homes, the statutes and the community weigh on smoke, signs and noise; our guide on community of owners permission helps with this part.
It is also worth having the technician visit the unit with the installations exposed before drawing anything. A project done only from a plan fails exactly where you cannot see: drainage stacks, the consumer unit, party walls.
Common mistakes
- Commissioning works without a project and expecting a fixed price. Without definition, the quote is an estimate.
- Choosing the technician on price alone. A weak project is paid for later on site, in extras.
- Asking each builder to price something different. If they do not start from the same document, they cannot be compared.
- Changing things on the fly without telling the technician. It can block the completion certificate.
- Not asking for site supervision. If nobody checks, the project stays on paper.
- Leaving the documentation until the end. Ask from the start for certificates, reports and final drawings.
- Forgetting the technical furniture. Counters, display cases and machinery affect sockets, drains and loads.
When to call a professional
For the project, always. It is not a form that an owner can sign alone if the works require a technician. What you can do: gather the unit's paperwork, define your activity and decide what you want each zone to do. And for the works, call a builder once you have a project or at least a defined layout, because that is what makes a comparable price possible.
Visado, declaración de competencia and other terms
These terms appear in technicians' quotes, and it helps to know what they mean. Not all procedures require the same, and your technician will explain which one applies.
- Basic project (proyecto básico): the first phase, with the general idea and enough to apply for permission.
- Execution project (proyecto de ejecución): develops the detail needed to build and price accurately.
- Professional endorsement (visado colegial): a check by the professional body, required in some cases and not in others.
- Declaration of competence or responsibility: the technician declares they are competent and accept responsibility for what they sign.
- Activity technical report (memoria técnica de actividad): a document specific to the activity that describes installations and compliance with its conditions.
Always ask which document your town hall requires and whether the procedure allows a declaración responsable or requires a licence, so you do not pay for a bigger or smaller project than necessary.
What to ask your technician for in writing
A clear brief avoids arguments over scope. Before accepting, get it in writing:
- Which documents are included and which are left out, for example measurements or site supervision.
- Whether it includes filing the application at the town hall and responding to any corrections.
- How many design revisions are included at no cost.
- Who coordinates with the builder and the installers.
- Delivery times for the project and the completion certificate.
With that brief, the builder knows what to work to and you know whom to ask in each phase of the works, without reproach or later misunderstandings.
How to spot a weak project
A weak project shows in that it leaves important questions unanswered. Before approving, check these points with your technician:
- The drawings show the current and renovated state, with legible measurements.
- The measurements break down items with quantities, not just lump sums.
- The installations are drawn and justified, not just mentioned.
- Toilets, exits and evacuation routes are marked.
- The minimum qualities are written down, so two builders do not price different materials.
- The document states clearly which procedure is used to file with the town hall.
If any is missing, ask for it before hiring the builder. Correcting a piece of paper costs far less than correcting a wall already built.
How much time to allow
The project is the part of the calendar that is most underestimated. You need to add the visit to the unit, the draft, your corrections, the final drafting and the filing. We do not give timescales for technicians outside our company, but count on weeks rather than days, and tell your technician your target opening date from day one so they prioritise whatever controls the rest.
Next step
If you already have a project or report, send it to us and we will give you a fixed quote by item after a visit within 48 to 72 hours. If you do not have one yet, we will advise what to ask your technician for. See commercial renovation in Alicante, the page on shop renovation, the Spanish pages on reformas de oficinas and proyectos y licencias de obra, and book your visit through the contact page.
Frequently asked questions
Who signs the renovation project for a commercial unit in Spain?
A technician with the competence to do so: an architect, technical architect or engineer, depending on the type of works and installations. Which qualification is valid in each case depends on the scope and on what the town hall asks for. The technician answers for what they sign, which is why a builder does not sign it on its own account.
Do I always need a project to renovate a commercial unit?
Not always. A simple interior refurbishment can be handled with a technical report or a description of the works, while works that touch the structure or facade or change the use usually need a full project. The town hall and the type of activity set the minimum; your technician confirms it before you start.
How much does the project for a commercial unit cost?
The fees depend on the floor area, the activity and the scope, and each technician sets them independently, so we do not give a firm figure. Ask two or three technicians for a written quote stating what is included. We can price the works: €300 to €800 per m², IVA not included.
Can the builder take care of the project?
A builder can help you coordinate it, but the signature belongs to a competent technician whom you hire. At Costa Renova we carry out the works to your technician's project and handle the works declaración responsable. That way the project and the works have different people responsible, who check each other.
What happens if I change something during the works?
Small changes are noted; those affecting layout, installations or safety must go through the technician, who decides whether the project needs modifying. Changing without telling them can block the completion certificate and so the opening. Changes also almost always alter the price and the timeline.
Can I get a works quote without a project?
Yes, for a first estimate, but a fixed quote needs a project or at least a clear definition of the layout and installations. Without that, two quotes cannot be fairly compared.
What documents do I receive at the end?
Normally the technician's completion certificate, the certificates and reports for the installations, the final drawings and the equipment guarantees. With them the opening or the activity is filed. Ask for them in writing from the start.
I am abroad. Can I manage the project and works remotely?
Yes. Your technician and the builder can work from your brief, and we send photo and video updates during the works. It still helps to appoint someone you trust locally to hold keys and sign for deliveries.