Renovating your flat and the community of owners: the general rule
You can renovate the interior of your flat without asking the community of owners for permission as long as you do not touch common elements or the structure and do not harm other neighbours; but you must notify the works and comply with the community's rules. For any works affecting the facade, windows, terraces, drainage stacks, roof or structure you need an agreement of the owners' meeting. That is, in general terms, the logic of the Spanish horizontal property law (Ley de Propiedad Horizontal).
For owners from the UK or Ireland, the comunidad de propietarios is roughly the equivalent of a residents' management company or a leaseholders' association, but with more legal weight: every owner in the building is automatically a member, decisions are taken by vote at the annual or extraordinary meeting (junta), and a president and usually a paid administrator (administrador de fincas) run things day to day.
Most problems with neighbours do not come from the permission but from living alongside the works: noise outside hours, rubble in the lift, dust on the landing, a drainage stack leaking into the flat below. And most legal problems come from works on common elements done "because everyone does it": glazing in the terrace, putting the air conditioning unit on the facade, replacing the windows with a different colour.
This guide serves two purposes: to tell you whether your renovation needs a community agreement and to help you organise the works so that there are no disputes. We refer to buildings in Alicante, but the criteria are the same in Elche, Benidorm, Torrevieja or any municipality.
Which works need a community agreement: reference table
Works that stay inside your flat only need notification; those affecting common elements or the external appearance need an owners' meeting agreement, with a majority that depends on the type of works. The table is a guide: your community's statutes may demand more, and the administrator or a lawyer will confirm your specific case.
| Works | Notification or agreement | Comment |
|---|---|---|
| Bathroom or kitchen renovation without touching shared stacks | Notification | Interior works |
| New floors, painting, interior joinery | Notification | Interior works |
| Moving non-structural partitions | Notification | Check they are not load-bearing |
| Replacing windows to the community's approved design | Notification, better with authorisation | Affects the facade |
| Replacing windows with a different colour, material or design | Owners' meeting agreement | Alters the external appearance |
| Glazing in a terrace or balcony | Owners' meeting agreement and municipal licence | Facade and volume |
| Air conditioning with outdoor unit on the facade | Agreement, or follow the approved criterion | Common element |
| Opening a load-bearing wall | Agreement and technical project | Structure, common element |
| Moving or replacing a shared drainage stack | Owners' meeting agreement | Shared installation |
| Covering a patio, changing the roof | Owners' meeting agreement | Common elements |
| Rehabilitating the building facade | Agreement (community works) | Common element |
| Installing a lift or accessibility ramp | Agreement, with specific majorities | Common element |
| Changing the use of a commercial unit (e.g. to a flat) | Depends on statutes; often an agreement | Check statutes and licence |
If your works are in the first rows, the next step is the municipal procedure: the guide on the minor works licence in Alicante and the one on the declaración responsable explain how. If they are in the last rows, you will probably also need a major works licence.
What the horizontal property law says, in general terms
The Ley de Propiedad Horizontal sets out two ideas you should know: article 7 defines what each owner can and cannot do in their own flat, and article 17 establishes the majorities the owners' meeting needs to approve works affecting common elements. What follows is a general explanation, not legal advice; for your specific case, check the statutes and, if in doubt, a lawyer or the administrator.
Article 7: what you can do in your own flat
In general terms, an owner may modify the architectural elements, installations or services of their flat or commercial unit when this does not impair or alter the safety of the building, its general structure, its external configuration or appearance, or harm the rights of other owners. And they must give prior notice of the works to whoever represents the community. The same article prohibits annoying, unhealthy, harmful or dangerous activities, which in practice translates into respecting hours and noise rules.
Two practical consequences:
- "Notifying" is not "asking permission". For interior works, informing the president or the administrator is enough. They cannot forbid them, but you cannot ignore the community's rules on hours or use of common areas either.
- The boundary is the common element. Facade, structure, roof, patios, drainage stacks and general ducts, entrance hall, staircase and lift are common. Anything that affects them leaves article 7 and enters the agreements regime.
Article 17: the majorities at the meeting
Article 17 regulates how decisions are adopted. In general terms, some works require unanimity (those modifying the founding deed or the statutes), others qualified majorities (for example, three fifths in certain cases), and others can be approved by simple majority, or the community cannot even refuse when it comes to accessibility for people with disabilities or older residents, within certain cost limits. The specific majority depends on the type of works and the current wording of the law, which has changed several times.
For a flat renovation, what matters is:
- If the works alter the external appearance (glazing in a terrace, changing the look of the windows), you need an owners' meeting agreement and it should be recorded in the minutes (acta).
- If the works affect the structure (load-bearing wall), the meeting agreement is added to the technical project and the municipal licence.
- If the community has already adopted a general agreement (for example, an approved enclosure or window design), following it is usually enough, but ask for a copy of the minutes.
How to ask the community for permission, step by step
Asking for the community's agreement means describing the works in writing, providing the supporting documents, having the item added to the agenda of a meeting and obtaining an agreement recorded in the minutes. It is a simple process if prepared in good time; the problem is that ordinary meetings are usually held once a year, so an owner abroad needs to plan ahead or appoint a proxy.
- Check the statutes and previous agreements. Ask the administrator for a copy of the statutes and of the minutes where anything similar (windows, enclosures, air conditioning) was discussed. Often there is already a criterion.
- Describe the works in writing. What you will do, on which common element, with which materials and appearance. If it affects structure or facade, attach the technical documents.
- Notify the president or administrator and ask for the item to be added to the agenda of the next meeting. If there is no meeting soon, you can request an extraordinary one under the statutes.
- Attend the meeting and explain the works. Answer the neighbours' concerns: noise, timescale, final appearance, who is liable for damage. If you cannot attend, give a written proxy (delegación de voto) to someone who can present it.
- Obtain the agreement in the minutes and keep a copy. The town hall may ask for it with the licence, and it is your protection against future claims.
- Process the municipal permit. The community's agreement does not replace the licence or declaración responsable; they are two separate procedures.
If the works are clearly interior, the steps reduce to a written notification (an email or letter to the administrator) with dates, hours and the details of the person in charge of the site.
Hours, noise, rubble and the lift: living alongside the works
Disputes over works in communities are avoided with four things: respecting the noise hours, protecting and cleaning the common areas, agreeing how rubble is removed and giving the neighbours a responsible contact. They are common sense, but it pays to fix them before starting.
Working hours
The hours are set by the community's statutes or agreements and, above those, by the municipal noise ordinance. In practice, the reasonable approach is to work Monday to Friday in working hours, avoid weekends and public holidays, and concentrate the noisiest tasks (demolition, drilling, angle grinder) in mid-morning or early afternoon, never first thing or last thing. In coastal buildings with many retired residents or in high season, some communities restrict works in summer; in holiday apartments in Playa de San Juan or Benidorm it is normal to plan them between seasons.
Protecting common areas
Entrance hall, staircase, landing and lift must be protected: cardboard or blankets on the floor and in the cab, plastic sheeting on nearby walls, daily cleaning. When heavy material comes in (bags of cement, shower trays, screens), knocks to doors and walls must be avoided. Any damage is repaired by whoever does the works, and it should be set out in writing in the contract.
Rubble
There are three options: carrying it down the stairs, using the lift in sealed bags if the community allows it, or installing a rubble chute down to a skip. A skip on the street needs a public road occupation permit from the town hall, and construction waste must go to an authorised waste manager; many municipalities require proof. Rubble is never left in the entrance hall or next to the bins.
Shared services
Cutting the community's water or electricity for a connection requires prior notice to the affected neighbours. If you touch a shared drainage stack (very common when renovating bathrooms in 1960s to 1980s buildings, where the asbestos cement or cast iron stacks are in poor condition), you need an agreement and it is a good idea to coordinate with the neighbours above and below: sometimes the community takes the opportunity to replace the whole run.
The notice to neighbours
A sign in the entrance hall and a note in the letterboxes with start and end dates, hours, a brief description and the contact of the person in charge drastically reduce complaints. At Costa Renova we deliver it at the start of every renovation; having a single project manager means any incident is dealt with the same day, which matters when the owner is not in Spain.
Frequent cases in Alicante and the Costa Blanca
In Alicante, the most common disputes with the community revolve around terrace enclosures, air conditioning units on the facade, window replacement and shared drainage stacks in older buildings. They are works in high demand because of the climate and the age of the housing stock, which is precisely why they are worth doing properly.
- Terrace enclosures in Playa de San Juan, Albufereta, Cabo de las Huertas, El Campello or Gran Alacant. Many communities have an approved design; without agreement, the enclosure may have to be removed. It is also a job with a municipal licence, often major works.
- Air conditioning. The outdoor unit on the facade or on a visible terrace affects the external appearance. Many communities specify where to place it; in newer buildings there is usually pre-installation.
- Windows. Replacing old aluminium with PVC or thermally broken aluminium is one of the most worthwhile upgrades, but the colour and the frame layout must follow the community's criterion. Our guide on renovating an old flat in Spain covers windows as part of the wider plan.
- Drainage stacks and internal patios in flats in the Centro, Carolinas or Benalúa. When renovating a bathroom the shared stack appears in poor condition. That is the moment to talk to the community.
- Facades with salt damage near the sea: rehabilitation is community works, with an owners' meeting agreement, a project if the scope requires it and a scaffolding permit. Details on our facade renovation in Alicante page.
Common mistakes
- Thinking interior works do not need to be notified. The law requires prior notice to the community, and it also avoids misunderstandings.
- Glazing in the terrace "because the neighbour did". The fact that others did it without permission does not authorise you; the community may simply not have claimed yet, or you may be the first to receive the claim.
- Replacing windows without following the community's criterion. It is visible from the street and the easiest thing to spot. Ask before ordering.
- Placing the air conditioning unit wherever suits the installer without checking the community rules.
- Using the lift for rubble without agreement. It is the number one complaint in communities. Protect the cab or find another route.
- Working outside permitted hours or days to finish sooner. A noise complaint stops the works for longer than respecting the hours would.
- Not putting in writing who is liable for damage to common areas. Include cleaning and repairs in the contract with your company.
- Not keeping the agreement from the minutes. In a few years, when you sell, you will be asked to prove the enclosure or the works were authorised.
When to call a professional
For an interior renovation you can handle the notification to the community yourself: a written note to the administrator with dates and hours is enough. When the works affect common elements, it is worth having the renovation company, a technician and, in contentious cases, a lawyer specialising in horizontal property law on your side.
A company with experience of communities in Alicante helps you in three ways: preparing the technical description of the works for the meeting, organising the logistics (protection, rubble, hours) so that the neighbours do not complain, and coordinating the two procedures, community and municipal, in the right order. And when the works touch structure or facade, the partner technician provides the documents the meeting and the town hall will require.
At Costa Renova we include handling licences and declaraciones responsables with the town hall, we deliver the notice to the community at the start, and you have a single project manager from beginning to end, with a written guarantee of the works. If you are planning a full home renovation in Alicante or any works affecting windows, terrace or facade, book the free technical visit and we will tell you which permissions you need, from the community and from the town hall, together with a fixed itemised quote. You can request it from the contact page.
Frequently asked questions
Do I need permission from the community of owners to renovate my flat in Spain?
For works inside your flat that do not affect common elements or the structure, you do not need authorisation, but you must notify the president or the administrator and respect the community's rules. If the works touch the facade, windows, terrace, drainage stacks, roof or structure, you need an agreement of the owners' meeting (junta de propietarios).
Which works need a vote at the owners' meeting?
Those affecting common elements or altering the external appearance of the building: glazing in a terrace, replacing windows with a different design, fitting an air conditioning unit on the facade, opening load-bearing walls, moving a shared drainage stack, covering a patio or changing the use of a commercial unit. Depending on the type of works, a different majority is required.
What does the Spanish horizontal property law say about works in a flat?
In general terms, article 7 allows an owner to modify the elements of their own flat as long as this does not impair the safety of the building, its structure or its external appearance, or harm other owners, and obliges them to notify the community beforehand. Article 17 sets the majorities needed for owners' meeting decisions when works affect common elements. For your specific case, check the statutes and, if in doubt, consult a lawyer or the administrator.
Can I replace the windows of my flat without community permission?
Windows form part of the facade, which is a common element, so the prudent approach is to ask for authorisation or at least stick to the design, colour and material the community has approved. Many communities in Alicante have a set criterion; if there is none, obtain the agreement before ordering the windows.
What are the permitted working hours for renovations in a Spanish community?
They are set by the community's statutes or agreements and, above those, by the municipal noise ordinance. The norm is working hours on weekdays, no weekends or public holidays, and the noisiest tasks (demolition, drilling) in mid-morning. Check the specific rules of your building before starting.
Can rubble go down in the lift?
Only if the community allows it and the cab and floor are protected. Many communities ban it or restrict it to sealed bags at set times. The alternative is carrying it down the stairs or using a rubble chute. Agree it with the president before starting and leave the common areas clean every day.
What happens if I do works on common elements without permission?
The community can require you to restore the element to its original state and claim damages, and the town hall can refuse or revoke the licence. A terrace enclosure or an extractor outlet on the facade without agreement are common sources of disputes and lawsuits. Asking first is always cheaper.
Do I have to tell the neighbours about an interior renovation?
Yes, it is a legal obligation to notify whoever represents the community, and it is also a matter of good neighbourliness. A notice with dates, hours and the phone number of the person in charge avoids most complaints. We deliver that notice to the community at the start of every renovation.
Updated: