- Boletin electrico: the short answer
- What exactly the boletin (CIE) is
- When you will be asked for the boletin
- Who can issue it and how it is processed
- What the installer checks: what usually fails in older flats
- Boletin electrico in Alicante: common situations
- What it costs and how long it takes
- Common mistakes
- When to call a professional
Boletin electrico: the short answer
The boletin electrico is the Certificado de Instalacion Electrica (CIE): a document signed by a licensed installer after checking that your installation complies with the Spanish low-voltage regulations (Reglamento Electrotecnico para Baja Tension, REBT), and registered with the regional industry department. You need it to connect a supply, to increase the power beyond what the previous certificate covers, when you renew the installation and, in old flats with no certificate, when the distribution company demands it on a change of name. It cannot be issued by a private individual or by an electrician without the licence.
Almost nobody thinks about the boletin until they need it: when buying a 1970s flat in the city centre or Carolinas, when asking for more power because the supply trips with the air conditioning and the oven on, or when connecting the electricity in a commercial unit converted into a home. At that moment the supplier says "you need a boletin" and the questions begin: what it is, who does it, how long it takes, and why the installer says the consumer unit has to be changed first. For buyers from the UK or Ireland there is an extra layer, because the document has no exact equivalent at home and the estate agent rarely mentions it. This guide answers all of that with just enough detail so you know what to ask for and what to expect.
A note on the players, because the Spanish system splits them. The comercializadora is the supplier you pay; the distribuidora is the regional network company that owns the cables and the meter and that no customer chooses; Industria is the regional government department that keeps the register of certificates; and the instalador autorizado is a licensed electrical contractor registered with Industria, the only person who can sign a boletin.
What exactly the boletin (CIE) is
The CIE is the declaration, signed by a licensed electrical contractor, that a specific electrical installation complies with the REBT and its technical instructions. It comes with a technical memorandum or a project, depending on the size of the installation, and is registered with the industry department of the regional government.
Three ideas worth having clear:
- It is not an inspection by the authorities. The responsibility lies with the installer who signs. Industria registers the certificate; the distribution company checks it before connecting or modifying the supply.
- It certifies an installation, not a home. It describes the maximum admissible power, the level of electrification (basic or elevated), the circuits and the protective devices. If you later alter the installation significantly, the certificate no longer describes what is there.
- There are two different situations: certifying a new installation (the same installer builds and signs it) and certifying an existing one (the installer checks it, corrects what does not comply and then signs). The second is the usual case in older flats and the one that produces surprises.
| Document | What it is | Who issues it | What it is for |
|---|---|---|---|
| Electrical Installation Certificate (boletin, CIE) | Declaration that the installation complies with the REBT, with maximum admissible power and characteristics | Licensed installer (contractor licensed for low voltage) | New supply, power increase, legalising a new or renewed installation |
| Technical design memorandum | Description of the installation: single-line diagram, circuits, cable sizes, protective devices | The installer, for homes and small installations | Accompanies the certificate |
| Electrical project | Technical document signed by a qualified engineer | Engineer or qualified technician | Larger or special installations (premises open to the public, garages, etc.) |
| Verification or inspection certificate | Check of an existing old installation | Licensed installer | When the distribution company asks for it to modify an old supply |
For a normal home, what you need is the certificate with its technical memorandum. The project comes into play for commercial premises, communal garages or large installations; if your case is a commercial unit being converted into a home, the details are in converting a commercial unit into a home in Spain.
When you will be asked for the boletin
There are five clear situations: connecting a supply, a power increase beyond what the certificate covers, renewal of the installation, old installations with no certificate when the contract is modified, and a change from single phase to three phase. Outside those, it is usually not needed.
| Situation | Is a boletin needed? | Note |
|---|---|---|
| Connecting a new supply (new build, commercial unit to home) | Yes, always | The distribution company does not connect without a registered certificate |
| Reconnecting a supply disconnected some time ago | Usually yes | Depends on how long it has been off and whether a certificate is on record |
| Power increase within what the certificate covers | No, in general | The supplier processes the change with no technical paperwork |
| Power increase beyond what the certificate covers | Yes | It must be certified that the installation can take the new power |
| Change of name, certified installation | No, in general | Administrative step with the supplier |
| Change of name, installation over twenty years old with no certificate | The distribution company may demand it | Common in 1960s to 1980s flats that have never been rewired |
| Change from single phase to three phase (or back) | Yes | It is a change of installation |
| Complete renewal of the installation | Yes | Issued by the installer who does the work |
| Changing a socket, a light fitting or a switch | No | It does not modify the installation |
Two subtleties we are asked about a lot:
"I have bought a flat and just want the electricity in my name." If the supply is live and the installation is on record as certified, the change of name is a step with the supplier and you will not be asked for a boletin. If the installation is old and no certificate is on record, the distribution company may demand one; and if at the same time you ask for more power (the usual thing when buying an older flat to renovate), almost certainly. That is why it pays to ask before buying whether the flat has a boletin and what power it covers; your lawyer or gestor can ask the seller for a copy along with the energy certificate.
"I want to go from 3.45 kW to 5.75 kW because the supply keeps tripping." If the existing certificate covers that power, the supplier changes it with no more ado. If not, or if there is no certificate, you need a new one, and the installer has to check that the installation (supply cable, consumer unit, cable sizes) can take the power. The whole process is in increasing the electricity supply in Spain.
Who can issue it and how it is processed
Only an electrical contractor licensed for low voltage and registered with Industria can issue the certificate. The installer checks or builds the installation, writes the technical memorandum, signs the certificate and registers it; then you (or we, on your behalf) hand it to the supplier.
The process for an existing installation, the typical case in Alicante:
- Check at the property. The installer checks the consumer unit, the protective devices, the earth, cable sizes, number of circuits, condition of the fittings and the supply cable from the meter. They measure the earth resistance and test the RCDs.
- Report of what does not comply. If the installation is fine, go to step 4. If not, the installer tells you what has to be brought up to standard and quotes it.
- Upgrade. The usual work in 1960s to 1980s flats: replace the consumer unit with one that has a main switch, an RCD and circuit breakers per circuit; create or connect the earth; separate circuits; sometimes renew the supply cable. If the installation is a single circuit in cloth-covered cable, the upgrade is in practice a full rewire; see rewiring a flat in Spain cost.
- Certificate and memorandum. The installer writes the technical memorandum with the single-line diagram and signs the certificate, stating the maximum admissible power.
- Registration with Industria. In the Valencian region it is registered online with the territorial industry service; there are administrative fees that vary and are not part of our prices.
- Delivery to the supplier. With the certificate registered, the supplier processes with the distribution company the connection, the power increase or whatever change you needed. We can do this step for you, which saves a phone call in Spanish.
Timelines: the check and certificate of an installation that complies are resolved in a few days. If an upgrade is needed, it depends on the work: changing a consumer unit and connecting an earth is a day's job; a full rewire, one to two weeks in an empty flat. The distribution company's processing has its own timelines, which we do not control. None of it requires you to be in Spain beyond giving the installer access.
What the installer checks: what usually fails in older flats
In a 1960s to 1980s flat that has never been rewired, what stops the boletin being signed is almost always one of these four things: a consumer unit without current protective devices, no earth, a single circuit and cable with insufficient size or insulation.
The REBT sets minimums for homes: basic or elevated level of electrification, a minimum number of independent circuits each with its own circuit breaker, at least one RCD, a main switch, an earth conductor at every point and special requirements in bathrooms. The installer compares what is there with that.
- Consumer unit. Ceramic fuses, a single RCD for the whole flat or no RCD at all: does not comply. A modern unit with a main switch, a 30 mA RCD, circuit breakers per circuit and, recommended, surge protection: does.
- Earth. Two-pin sockets with no earth, or an earth connected to the water pipe: does not comply. Many older buildings in the city centre, Benalua or San Blas have no earth network, and creating one can mean working in the meter bank or the basement, with the community of owners involved.
- Circuits. A single circuit for lights and sockets: does not comply. Basic electrification requires at least five circuits; elevated, compulsory with air conditioning, more.
- Cable sizes and insulation. Cloth-covered or brittle rubber cable, small sizes on kitchen or air-conditioning circuits: does not comply.
- Supply cable. The cable from the meter to the flat with insufficient size for the power you want: it will have to be renewed, and it runs through common areas.
- Bathrooms. Sockets or appliances inside the protection zones around the shower or bath: they have to be relocated.
The installer cannot "turn a blind eye": they sign under their own responsibility. If someone offers you a boletin without checking the installation, be suspicious. The same goes for a seller who says "the electrics are fine, they have always worked".
Boletin electrico in Alicante: common situations
In Alicante and its surroundings, the boletin comes up mainly in four scenarios: buying and renovating an older flat, a commercial unit converted into a home, a coastal apartment that has had minimum power for years, and a villa switching to a heat pump or three phase.
Older flat in the city centre, Ensanche, Carolinas, San Blas, Benalua or El Pla. You buy it, you ask for a power increase for an induction hob and air conditioning, and the distribution company demands a certificate. The installation does not comply, and the sensible conclusion is to renew it as part of the renovation: with the walls open, the boletin comes out of the work itself. If you are at that stage, renovating an old flat in Spain, where to start helps you order it.
Commercial unit converted into a home. A new supply, with a new installation and a compulsory certificate. It usually goes together with a change of use with a project and a licence.
Apartment in Playa de San Juan, El Campello, Santa Pola or Torrevieja. Low contracted power for decades, the original installation, and when you fit air conditioning in every room everything trips. Salt air, besides, has punished terminals and outdoor fittings. Here the installer's check almost always ends in a new consumer unit and, often, renewed circuits. It is the typical case for British owners turning a summer apartment into a year-round home.
Villa in Mutxamel, San Vicente, Busot or El Campello fitting a heat pump or a car charger. The power needed may require three phase or a large increase on single phase: a new certificate either way.
In the province we have electricians in Alicante, Elche, Torrevieja, Benidorm, Santa Pola and Elda.
What it costs and how long it takes
If we renew the installation, the boletin is included in the quote. As a stand-alone step, the cost depends on whether the installation complies or has to be upgraded; the registration fees and the distribution company's charges are separate and not part of our prices.
| Item | How it is charged |
|---|---|
| Boletin within a new or renewed installation | Included in the installation quote |
| Check of an existing installation and certificate, if it complies | Fixed quote after the visit |
| Minor upgrades (consumer unit, earth connection, separating circuits) | Electrician's work at €35 to €50 per hour, VAT not included, or a fixed quote |
| Complete rewiring of a flat | Quoted by points and circuits; within a full renovation, €450 to €900 per m², VAT not included |
| Registration fees with Industria and distribution company charges | Regulated, they vary; not part of our prices, itemised separately |
As an indicative market reference, a stand-alone boletin on an installation that complies is a step of moderate cost; what can make it expensive is not the certificate but the upgrade beforehand. That is why we always give the diagnosis first and the fixed quote second, so an owner abroad can decide with the full picture rather than discover the real cost after the first invoice.
Common mistakes
- Assuming a change of name needs a boletin, or that it does not. It depends on whether the installation is on record as certified and whether you ask for more power. Ask before signing the purchase.
- Buying an older flat without knowing what power its certificate covers. It is a cost that appears later, once the renovation budget is already fixed.
- Asking for the boletin after tiling and painting. If the installer finds circuits have to be separated or an earth created, the fresh work has to be chased. The boletin is planned at the start of the renovation.
- Accepting a "boletin" with no inspection. A certificate signed without checking the installation is a problem for you: in a claim, the insurer will look at what is really in the wall.
- Confusing the boletin with a project. A normal home does not need an engineer's project; commercial premises, a garage or a large installation do.
- Forgetting the supply cable. The internal installation can be perfect and the cable from the meter unable to take the power. It is what most delays a power increase in older buildings.
- Expecting the installer to "fix" the earth by connecting it to the pipework. It is not a valid earth and cannot be certified.
When to call a professional
The boletin is, by definition, the work of a licensed installer: there is no do-it-yourself version. What you can do is gather the paperwork, check for signs that the installation is old and decide whether to fold it into a renovation.
What you can do yourself, including from abroad:
- Find the contracted power on the bill and ask the supplier whether a certificate is on record and what power it covers.
- Look at the consumer unit (or have your key holder photograph it): ceramic fuses, a single RCD or none, and you already know it will not pass without changes.
- Look at the sockets: two-pin with no earth, the same.
- Decide whether you are going to renovate: if the answer is yes, the new installation and its boletin go inside the work and it is the cheapest way to solve it; our full home renovation in Alicante page explains what is included.
What a licensed installer has to do: the check, any upgrade of the consumer unit, earth or circuits, the technical memorandum, the signature and the registration. Working on a consumer unit or a supply cable without the licence is dangerous and, besides, pointless, because nobody will be able to certify it.
If you need the boletin for a new supply, a power increase or a change of name on an older flat, we visit within 48 to 72 hours in Alicante and the surrounding area, check the installation and tell you plainly whether it complies or what has to be upgraded, with a fixed, free quote, a written guarantee and the paperwork handled by us in your name. See our electrician in Torrevieja or electrician in Elche pages, or write to us through contact.
Frequently asked questions
What is the boletin electrico?
It is the everyday name for the Certificado de Instalacion Electrica (CIE), the document with which a licensed installer declares that the electrical installation of a home or premises complies with the Spanish low-voltage regulations (REBT). It is registered with the industry department of the regional government, and the distribution company asks for it before connecting or modifying a supply. There is no direct UK equivalent; it is closer to an Electrical Installation Certificate than to a safety report.
Who can issue a boletin electrico?
Only an electrical contracting company licensed for low voltage, with a licensed installer who signs the certificate. It cannot be issued by a private individual, a managing agent (administrador de fincas) or an electrician without the licence. If the installation does not comply, the installer cannot sign it until it is brought up to standard, so a boletin on offer with no inspection is a warning sign.
When is the boletin electrico compulsory?
When connecting a new supply or one that has been disconnected for some time, when increasing the power beyond what the existing certificate covers, when the installation is renewed and, on old installations without a current certificate, when the distribution company demands it on a change of name or tariff. On a normal change of name, with a certified installation, it is usually not needed.
Do I need a boletin to put the electricity in my name?
In most cases no: a change of name with no change of power or installation is handled by the supplier without a boletin. The distribution company can demand one if the installation is more than twenty years old and no certificate is on record, or if you ask for more power at the same time. It is worth asking before you complete on an older flat, and worth adding to your buyer's checklist alongside the energy certificate.
How much does the boletin electrico cost?
If we renew the installation, the certificate is included in the quote. As a stand-alone step it is quoted after the check: it depends on whether the installation complies and only needs verifying and registering, or whether the consumer unit, earth or circuits have to be brought up to standard first. Minor works by our electricians are charged at €35 to €50 per hour, VAT not included.
How long is a boletin electrico valid for?
The certificate has no fixed expiry date: it records how the installation was when it was issued. In practice, distribution companies treat installations over twenty years old with no certificate as old and may ask for a new one when the supply is modified. Any significant alteration to the installation requires a new certificate.
What happens if my installation fails the boletin check?
The installer tells you what fails: usually a consumer unit with no RCD or no circuit breakers per circuit, no earth, undersized cables or a single circuit. Those parts have to be brought up to standard before the certificate is issued. Sometimes changing the consumer unit and connecting the earth is enough; sometimes the whole installation has to be renewed.
Do I need a boletin to sell a flat in Spain?
It is not a compulsory document for the sale, unlike the energy certificate or, depending on the case, the habitation certificate. But the buyer may ask for it, and if the installation is old and will need a power increase, the buyer will need the boletin anyway. Having it makes a 1960s to 1980s flat easier to sell, particularly to other foreign buyers whose lawyers ask for it.
Updated: