Increasing the electricity supply (potencia) in Spain: how it is done

Guide · 10 min read · Costa Renova site team · updated

To increase the contracted power of your Spanish home you work out how much you need, check that the installation can take it (the supply cable from the meter, the consumer unit, the certificate), request it from your electricity supplier, and the regional distribution company approves it and reprogrammes the meter. If the existing installation certificate (the boletin) already covers the new power, it is an administrative step; if not, a licensed installer has to adapt the installation and issue a new certificate. Our electricians check it on the free visit; minor works are charged at €35 to €50 per hour, VAT not included.

  • Fixed, itemised quote, free and with no obligation
  • Site visit within 48–72 h in Alicante and 45 km around
  • One project manager from start to finish
Illustrative image: electrician rewiring a home
Illustrative image: electrician rewiring a home.
On this page
  1. Increasing the electricity supply: the short answer
  2. How much power you need
  3. What your installation has to withstand
  4. How it is done: step by step
  5. Power levels, limiters and digital meters: what is worth knowing
  6. Power increases in Alicante: what we come across
  7. How much it costs to increase the power
  8. Common mistakes
  9. When to call a professional

Increasing the electricity supply: the short answer

Increasing the electricity supply of a Spanish home follows one of two paths. If your installation certificate (the boletin) covers the power you want, you request it from your supplier and the distribution company reprogrammes the meter: an administrative step with some regulated fees. If there is no certificate, or the new power exceeds what it covers, a licensed installer has to check the installation, adapt whatever does not comply and issue a new certificate; only then is the request processed. In older Alicante flats, the second path is the norm.

The signs that you are going to need it are always the same: the supply trips when the oven and the air conditioning run together, you cannot put the washing machine on while cooking on the induction hob, or you have bought a 1970s flat with the power that was contracted back then for a gas hob and a washing machine. Many British owners also discover it the first summer they try to run two air-conditioning units at once in an apartment that was only ever used for a fortnight in August. This guide explains how much power you really need, what the distribution company checks, what your installation has to withstand and in what order to do it so you do not pay twice.

A quick glossary, because the Spanish system splits roles in a way the UK does not. The comercializadora is the supplier you pay (Iberdrola, Endesa, Naturgy and dozens of smaller firms); the distribuidora is the regional network company that owns the cables and the meter and that no customer chooses. Potencia contratada is the contracted power in kW shown on every bill, and it is a monthly standing charge whether you use it or not. The ICP was the limiter switch; in digital meters its job is done inside the meter. The boletin, formally the Certificado de Instalacion Electrica, is the installer's certificate that the installation complies with the Spanish low-voltage regulations (REBT).

How much power you need

The power to contract depends on the appliances you will run at the same time, not the sum of everything you own. A home with an electric kitchen and air conditioning needs considerably more than one with gas and a fan, and a villa with a heat pump or a car charger more still.

To work it out, add up the power of what coincides at the worst moment of the day (in Alicante, a July afternoon: air conditioning, oven or induction hob, dishwasher, water heater) and add a margin. General orientation by type of home, without catalogue values:

Home What usually coincides Orientation
Small flat, gas hob, no air conditioning or one split unit Washing machine, fridge, lights, one split Low power, the usual on old contracts
Flat with induction hob, oven and one or two splits Induction + oven + air conditioning + washing machine Medium power; the step almost everyone takes when renovating
Large flat or villa with several splits or ducted air, induction, tumble dryer Full climate control + kitchen + appliances High power on single phase
Villa with heat pump (aerotermia), pool pump and electric car charger Heat pump + charger + pool pump + kitchen High power; sometimes three phase

Two practical tips:

  • Do not contract "just in case". Power is paid for on every bill whether you use it or not. With digital meters and the current domestic tariff you can contract two different powers (one for peak hours and another for off-peak, at night and weekends), which lets you fine-tune without oversizing. For a holiday home used a few weeks a year, this is worth asking about.
  • Count the REBT. The regulations set minimum levels of electrification for the installation (basic or elevated). With air conditioning, the installation must be of the elevated level; that does not oblige you to contract that power, but it does oblige the installation to be able to take it. We explain it in rewiring a flat in Spain cost.

What your installation has to withstand

Before you ask for the power, three things have to be checked: the supply cable from the meter, the consumer unit with its protective devices, and the earth. If any of them fails, the distribution company will not approve the increase or the installer will not be able to certify it.

Element What is checked What happens if it fails
Supply cable (derivacion individual) Cross-section of the cable between the meter bank and your consumer unit It has to be renewed; it runs through common areas, tell the community
Main switch and consumer unit That the main switch and the unit can take the new current; RCD and circuit breakers per circuit New consumer unit; the most frequent adaptation
Earth That it exists and has an adequate resistance; earth conductor at every point Create or connect the earth, sometimes with work in common areas
Circuits Number of circuits and cable sizes according to the level of electrification Separate circuits, run new lines for air conditioning or the kitchen
Fuses in the building's main protection box and meter bank That the common part of the building can take the power If not, the community has to upgrade the common installation

A detail that surprises people: you can have a freshly renovated flat and the increase can still stall because the supply cable is the original from 1975 with a cross-section meant for a third of the power. That cable runs up the service duct or the stairwell, and renewing it requires coordinating with the community of owners. How to raise it is in community of owners permission for renovations in Spain.

And another: if the consumer unit has ceramic fuses or a single RCD, it has to be changed before anything else, with or without a power increase. A consumer unit with no RCD is also something most UK buyers' surveyors would flag immediately; here it is simply common in flats that have never been rewired.

How it is done: step by step

The order matters: first the power you need, then the installation, then the certificate if required, and only at the end the request. Doing it backwards is the usual cause of rejected requests and repeat visits.

1. Work out the power

Add up what coincides and decide with a margin. If you are going to renovate, think about the renovated flat (induction hob, air conditioning in several rooms, tumble dryer), not the current one.

2. Look at your contract and your certificate

The bill shows the contracted power. Ask your supplier whether an installation certificate is on record and what maximum admissible power it covers. Three possible outcomes:

  • The new power is within what the certificate covers: go to step 5.
  • It exceeds what it covers: you need a new certificate (steps 3 and 4).
  • No certificate is on record or the installation is more than twenty years old: you almost certainly need a certificate.

If your Spanish is limited, this call is the one step where it helps to have someone fluent; the supplier's English line may not know what "potencia maxima admisible" means in practice.

3. Check by a licensed installer

The installer checks the supply cable, the consumer unit, the earth and the circuits. They tell you whether the installation can take the power or what has to be adapted. We do this check on the free visit.

4. Adaptation and certificate

Whatever is missing is done (consumer unit, earth, supply cable, circuits) and the installer issues the Certificado de Instalacion Electrica with the new power and registers it with the regional industry department. Everything about that document is in the boletin electrico guide.

5. Request to the supplier

You ask for the increase, stating the power (or the two powers, peak and off-peak, if your tariff allows it) and attaching the certificate if required. The supplier passes it to the distribution company for your area, which owns the network and the meter. We can do this in your name if you prefer.

6. Action by the distribution company

The distribution company validates the request, settles the regulated fees for the additional power and reprogrammes the digital meter remotely or, on older installations, changes the limiter or the meter. From that moment the new power is live and appears on your next bill. If it detects a problem in the common part (fuses in the main protection box, meter bank), it can ask the community to upgrade it.

Power levels, limiters and digital meters: what is worth knowing

The ICP was the switch that cut the supply when you exceeded the contracted power; today, with digital meters, that function is done by the meter itself and the reset is done from the main switch on the consumer unit. Power is contracted in values the distribution company accepts for your type of supply.

Some general clarifications, without going into specific tariffs that change:

  • Contractable power levels. Traditionally power was contracted in standard steps tied to the rating of the limiter. With digital meters on domestic supplies, the supplier can accept finer values; ask when you apply, because it lets you fine-tune what you pay.
  • Two powers. The current domestic tariff allows one power for the peak period and another for off-peak. If your big consumption is at night (water heater on a timer, washing machine, car charging), you can contract more off-peak than peak and save on the standing charge.
  • Single phase or three phase. Most homes are single phase and should stay that way unless the needs are large (a powerful heat pump, chargers, machinery). Switching to three phase is a change of installation with a compulsory certificate and should be assessed with the installer before asking for it.
  • When "the power goes off". If the meter cuts out through excess, switch off whatever you turned on last and reset from the main switch. If the RCD (diferencial) trips, it is not a power problem but an earth leakage or a faulty appliance; and if a circuit breaker trips, it is an overload or short circuit on that circuit. Telling them apart avoids paying for power you do not need. For an owner abroad, it also tells you whether the key holder can reset it or whether an electrician is needed.

Power increases in Alicante: what we come across

In the province of Alicante, a power increase almost always goes hand in hand with a flat renovation and the installation of air conditioning, and the usual obstacles are an old supply cable and the absence of an earth in the building.

In the 1960s to 1980s flats of the city centre, Carolinas, San Blas, Benalua, El Pla or Los Angeles, the original contracted power was that of a home with a gas hob and no climate control. When renovating and switching to induction and air conditioning, more power is requested and the certificate appears. The most efficient route is to renew the full installation as part of the renovation, with the walls open, and obtain the certificate from that work. How to fit it into the project: renovating an old flat in Spain, where to start.

In the apartments of Playa de San Juan, Albufereta, El Campello, Santa Pola or Torrevieja, the problem is similar with an extra: many have minimum power because they were only used in summer, and on becoming a main home with air conditioning in every room it is not enough. Salt air, besides, corrodes terminals and protective devices in consumer units untouched for decades. The air conditioning installation cost guide covers what each unit draws.

In the villas of Mutxamel, San Vicente, Busot, Sant Joan or La Nucia, the increase comes with a heat pump (aerotermia), a pool pump or an electric car, and here the three-phase question can arise. We plan it together with the climate installation so the power is the right one, not the maximum; see aerotermia heat pump versus air conditioning.

We work with electricians in Alicante, Elche, Benidorm, Torrevieja, Santa Pola and Elda.

How much it costs to increase the power

The cost has three parts: the regulated fees the distribution company charges for the additional power, the certificate if required, and the adaptation of the installation if it cannot take the new power. The first two are moderate; the third is the one that can turn into a building job.

Item Who charges it How it is calculated
Access and extension fees for the additional power The distribution company, through the supplier Regulated amounts per kW; they vary and are not part of our prices
Check and certificate Licensed installer Fixed quote after the visit; included if we renew the installation
New consumer unit, earth connection, separating circuits Licensed installer Minor works at €35 to €50 per hour, VAT not included, or a fixed quote
Renewal of the supply cable Licensed installer, with notice to the community Fixed quote; depends on length and route
Complete new installation Licensed installer Quoted by points and circuits; within a full renovation, €450 to €900 per m², VAT not included

If you are a private individual and the home is more than two years old, the adaptation work can be charged at the reduced 10% IVA (Spanish VAT) when materials are no more than 40% of the taxable base; we explain it in the reduced 10% VAT on renovations guide. Note that the reduced rate applies to a home, not to a property let commercially as a business, so ask us about your case.

Common mistakes

  • Requesting the power before checking the installation. The request is rejected or stalls halfway, and you are back at the start with time lost.
  • Contracting too much. It is paid every month. Calculate what coincides, not what you own.
  • Forgetting the supply cable. New internal installation, old cable from the meter: it cannot take the power and common areas have to be opened.
  • Confusing the RCD, the circuit breaker and the limiter. If the RCD trips, it is not a lack of power; it is an earth leakage, and raising the power will not fix it.
  • Renovating and requesting the power at the end. The certificate may require separating circuits or creating an earth; with the walls closed, that means chasing again.
  • Switching to three phase "to have plenty". It changes the installation, single-phase appliances still use one phase and the cost is not justified without a real need.
  • Not telling the community. If the supply cable or the meter bank has to be touched, the president and the administrador must know beforehand, not when the installer is on the stairs.

When to call a professional

Working out the power, reading the bill and asking the supplier you can do yourself, even from abroad. Everything that involves opening the consumer unit, touching the supply cable, creating an earth or issuing the certificate must be done by a licensed installer: for safety and because without one there is no certificate and no increase.

Do it yourself:

  • List the appliances that coincide and the approximate power of each (it is on the label or in the manual).
  • Check the contracted power and whether a certificate is on record.
  • Look at the consumer unit from outside: fuses, number of RCDs and circuit breakers, whether there is surge protection.
  • Tell the community if you suspect the supply cable is old.

Call a licensed installer when:

  • The limiter trips often and you want to raise the power.
  • You are going to install air conditioning, an induction hob, a heat pump or a car charger.
  • You are buying a 1960s to 1980s flat and want to know what power it can take before closing the renovation budget.
  • The supplier asks you for a certificate.
  • There are sparks, heat at the consumer unit or sockets, or lights that flicker when appliances start: that does not wait.

If you want to resolve it in one go, we visit within 48 to 72 hours in Alicante and the surrounding area, calculate the power, check the consumer unit, earth and supply cable, and give you a fixed, free quote for whatever is needed, with the certificate included, a written guarantee and the paperwork handled in your name. See our electrician in Torrevieja or electrician in Elche pages, or book your visit through contact.

Frequently asked questions

How do you increase the electricity supply in Spain?

You request it from your electricity supplier (comercializadora), which processes it with the regional distribution company (distribuidora). If the installation has a certificate (boletin) covering the new power, it is an administrative step; if not, a licensed installer has to check the installation, adapt it if necessary and issue the certificate. The distribution company reprogrammes the meter or changes the limiter and the new power appears on your next bill.

How much power do I need in a Spanish home?

It depends on what you use at the same time. A flat with a gas hob and no air conditioning runs on a low power; one with an induction hob, oven, air conditioning and washing machine usually needs considerably more, and a villa with a heat pump or an electric car charger more still. On the visit we add up the appliances you will run together and propose a power with a margin, without overdoing it, because power is paid for every month whether you use it or not.

Do I need a boletin to increase the power?

Only if the new power exceeds what the existing certificate covers, if no certificate is on record, or if the distribution company demands one because of the age of the installation. Within the certificate's margin, the supplier processes it with no technical paperwork. In 1960s to 1980s flats with no electrical renovation, one is usually needed.

How long does a power increase take?

If no certificate is needed, it is usually resolved in days once the supplier has processed it. If the installation has to be checked or adapted and a certificate issued, add the time of the work (one day for a consumer unit, one or two weeks for a full installation) and the registration. The distribution company's timelines do not depend on us, and nothing requires you to be in Spain except giving the installer access.

How much does it cost to increase the power?

There are three parts: the regulated fees the distribution company charges for the additional power (they vary and are not part of our prices), the certificate if required, and the adaptation of the installation if it cannot take the new power. Our electricians charge €35 to €50 per hour, VAT not included, for minor works; a new consumer unit or a full installation is quoted as a fixed price after the visit.

Why does the electricity keep tripping in my Spanish flat?

Because the total of what you have switched on exceeds the contracted power. With digital meters the limiter is inside the meter and cuts the supply when you go over; you reset it from the main switch on the consumer unit after turning something off. If it trips often with the oven, the air conditioning and the washing machine on, the answer is to increase the power, not to keep resetting it.

Can I reduce the power again after increasing it?

Yes, you can ask your supplier for a reduction. In general, power changes are limited in frequency and each one can carry a regulated cost, so it pays to calculate properly and not change it every few months. With a digital meter and the two-period domestic tariff you can contract a different power for peak and off-peak, which suits a holiday home used mainly in summer.

What if the cable from the meter cannot take more power?

The supply cable (derivacion individual, the cable from the meter bank to your flat) must have enough cross-section for the new power. If not, it has to be renewed, and as it runs through common areas the community of owners should be told. It is one of the usual reasons a power increase in an old building turns into a small building job.

Updated:

Get your free quote

Tell us what you want to renovate. We reply within 24 working hours and arrange a free, no-obligation visit.

📞 960 292 180
or email us at info@reformascostarenova.com

📞 CallHome Free quote