On this page
- Cédula de habitabilidad in Alicante: the short answer
- What exactly it is and what it is called today
- When you need the cédula or occupation licence
- What the technician checks
- What it costs and what is included
- How it is processed, step by step
- Habitation certificate Spain: the terms in English
- Cédula de habitabilidad in the Valencian Community: what differs
- Declaración responsable de segunda ocupación in Torrevieja, Benidorm and elsewhere
- Common cases in Alicante
- What to do if the home does not comply
- Common mistakes
- When to call a professional
Cédula de habitabilidad in Alicante: the short answer
The cédula de habitabilidad confirms that a home meets the minimum conditions to be lived in. In the Valencian Community, and therefore in Alicante, it is now processed as an occupation licence or declaración responsable de ocupación at the town hall: first occupation (primera ocupación) for new homes, homes rehabilitated from top to bottom or homes created by a change of use, and second occupation (segunda ocupación) for existing homes. You need it to sell, to let and, in many cases, to connect utilities. The service costs €100 to €200, VAT not included, plus municipal fees where they apply, and it is processed by a technician with a habitability report.
The name causes confusion. In Alicante everyone says "cédula", the water and electricity companies ask for it as the "cédula", your solicitor may call it a "habitation certificate", and the document that is actually processed is called the occupation licence (or declaración responsable de ocupación, depending on the case and the moment). There is no direct equivalent in the UK or Ireland, which is why so many buyers hear about it for the first time at the notary. In this guide we use both names, explain when you need it, what the technician checks, what it costs and what to do when the property does not comply.
What exactly it is and what it is called today
It is a municipal document confirming that the home meets the habitability conditions and may be used as a residence; its current name in the Valencian Community is occupation licence or declaración responsable de ocupación.
| Name you will hear | What it is | When |
|---|---|---|
| Cédula de habitabilidad | Traditional name, still in common use | Any case; used by agents and utility companies |
| Licencia de primera ocupación | Confirms that a new, fully rehabilitated or change-of-use home matches the works licence and is habitable | After new construction, full rehabilitation or conversion of a commercial unit into a home |
| Licencia or declaración responsable de segunda ocupación | Confirms that an existing home still meets the habitability conditions | Existing home being sold, let or having utilities transferred, with a previous licence expired or non-existent |
| Declaración responsable de ocupación | A procedure in which the owner, with a technician's report, declares that the home complies, and the registered document takes effect from that moment without waiting for a decision | Depending on the case and what the town hall allows at the time |
The specific form (a licence resolved by the town hall, or a declaración responsable with effect from submission) depends on the planning and housing regulations in force and the particular case; we do not present it as fixed because it changes. What does not change is the substance: a technician inspects the home, writes a habitability report and it is submitted to the town hall of Alicante, Elche, Benidorm or whichever municipality applies.
When you need the cédula or occupation licence
You need it when selling, letting, connecting utilities and after works that change the use of the home or rehabilitate it thoroughly.
- Sale. The notary and the buyer ask for it; in practice it is hard to complete without it or without proof that it is being processed. If you are buying, your lawyer should check it is in place or budget for obtaining it.
- Long-term letting. The home must have a valid occupation licence; many agencies and landlords include it in the contract paperwork.
- Holiday letting. It is one of the documents required for the tourist-use declaration (vivienda de uso turístico); see the guide on renovating a holiday rental between seasons.
- Connecting utilities or changing the account holder. Water, electricity and gas companies frequently ask for it, especially for new connections or after years of disconnection. This is the point at which many new owners discover they need one.
- Mortgage. Some banks require it at valuation or at signing.
- After new construction, full rehabilitation or change of use. First occupation, with the technician's final works certificate; if you have converted a commercial unit, see converting a commercial unit into a home.
If the home already has a valid occupation licence, you do not need another until it expires or until major works require renewal. Licences are valid for a period of several years; in older flats that have been with the same owner for decades, the normal situation is that it has expired or never existed as such.
What the technician checks
The technician checks the habitability conditions (floor areas, ceiling heights, ventilation, light, bathroom, kitchen, services) and that there are no serious defects.
The habitability conditions in the Valencian Community are set out in the regional regulations on housing design and quality. Without going into figures, which vary by type of home and date, what is looked at is:
- Minimum usable floor area of the home and of each room (bedroom, living room, kitchen, bathroom).
- Sufficient clear ceiling height in the habitable rooms.
- Natural ventilation and light in the habitable rooms through openings onto a facade or a courtyard of adequate size.
- A kitchen with a sink, space to cook and ventilation or extraction.
- A full bathroom with WC, basin and shower or bath, with ventilation.
- Water, drainage and electrical services working and in safe condition.
- No serious structural safety or sanitation defects (significant damp, dangerous installations).
In existing homes the criterion is more flexible than for new builds: the question is whether the home, built under the rules of its time, remains fit to be used. A 1960s flat with a small bedroom is not "failed" for that; it can fail for a bathroom with no ventilation or extractor, a dangerous electrical installation or serious damp.
If something does not comply, the technician tells you before anything is submitted and sets out what needs fixing. It is usually something small: fitting an extractor in an internal bathroom, replacing a consumer unit with no protection, repairing a damp patch.
What it costs and what is included
The service for the cédula or second occupation licence costs €100 to €200, VAT not included, plus municipal fees where they apply.
| Procedure | Guide price (VAT not included) | Includes |
|---|---|---|
| Cédula / licence or declaración responsable for second occupation | €100 to €200 | Technician's visit, habitability report, submission to the town hall |
| Energy certificate | €90 to €180 | Visit, calculation, label and registration |
| Cédula plus energy certificate | Sum of both | A single visit |
| First occupation after works with a project | Depends on the project; quoted with the works | Technician's final works certificate, documentation and submission |
| Small prior repairs (extractor, consumer unit, damp) | By item after the visit | Whatever is needed to comply |
Municipal fees, where they exist, are set by each town hall and paid separately; we do not include them in the price or quote a figure that may change. For first occupation after works with a licence, the procedure is tied to the project and we manage it with the technician as part of the works.
Prices and process for our area are on energy certificate and cédula in Alicante.
How it is processed, step by step
Technician's visit, report, submission to the town hall and delivery of the receipt; the part that depends on us is done in a few days.
- You give us the address, the catastral reference, any previous licence you have and what you need it for (sale, letting, utilities).
- Visit by the partner technician: checks the habitability conditions and takes data; if you also order the energy certificate, it is done on the same visit.
- Habitability report or technician's certificate, with the documentation the town hall requires.
- Submission to the relevant town hall (Alicante, Elche, Benidorm, Santa Pola, Torrevieja, San Vicente and so on), as a declaración responsable or a licence application depending on the case, with payment of fees where applicable.
- Delivery of the registered receipt, or of the licence once it is resolved.
If the procedure is by declaración responsable, the registered document serves from that moment for the notary, utilities or contract. If the town hall has to resolve a licence, the timing is theirs and should be factored in when fixing a completion date. For owners abroad, the whole process runs by email and we coordinate access with your agent or keyholder.
Habitation certificate Spain: the terms in English
If you are reading adverts and contracts in English, these terms refer to the same family of documents:
| Term you may see | What it means in practice |
|---|---|
| Habitation certificate | The common English name for the cédula de habitabilidad |
| Cédula de habitabilidad | The traditional name, still used by agents, notaries and utility companies |
| Occupation licence | The formal name of the document in the Valencian Community |
| First occupation (primera ocupación) | For new or fully rehabilitated homes, after the works are finished |
| Second occupation (segunda ocupación) | For an existing home being sold, let or reconnected to utilities |
| Declaración responsable | A sworn declaration filed with the town hall, with a technician's report |
For an owner, the practical question is simple: is there a valid document, and if not, how long will it take to get one? A technician inspects the home, issues a report and the application is filed with the town hall. Our service costs €100 to €200, VAT not included, plus municipal fees where they apply; see our energy certificate page for the price list and timelines.
Cédula de habitabilidad in the Valencian Community: what differs
The Valencian Community has its own housing rules, which is why a certificate from another region is not interchangeable. Searches for the cédula de habitabilidad of the Comunidad Valenciana usually come from owners who bought, inherited or are letting a property and found that the old cédula has expired or was never issued. The route is the one set out above: technician's report, then a declaración responsable de segunda ocupación or the licence procedure of your municipality. The details, the fees and the processing time depend on the town hall, so we check them for each case, whether the property is in Alicante, Elche, Benidorm or Torrevieja.
Declaración responsable de segunda ocupación in Torrevieja, Benidorm and elsewhere
Owners in Torrevieja, Benidorm, Santa Pola and the other coastal towns most often meet the document when a holiday home is let, sold or reconnected to a utility. The process is the same in outline everywhere: the technician visits, checks the home against the habitability conditions, writes the report and the declaration is filed with the municipality. A first-occupation declaration is the equivalent for a new or fully rehabilitated home, after the works are finished and certified. If your home fails a check, for example because of damp, a missing ventilation or an unlicensed alteration, the technician says what must be corrected before the declaration can be filed; see the section below on what to do if the home does not comply.
Common cases in Alicante
The typical cases: an inherited older flat, a coastal apartment going on the rental market, a renovated home or a converted commercial unit.
- Inherited flat in the Centro, Carolinas, San Blas or Benalúa that has been in the same family for forty years. There is no licence or it has expired. Second occupation is processed; sometimes the consumer unit or a bathroom with no ventilation has to be fixed first.
- Apartment on Playa de San Juan, the Albufereta, Santa Pola, Gran Alacant or Torrevieja about to be let. For long-term letting a valid occupation licence is needed; for tourist use, besides the occupation licence, the requirements of the tourism regulations must be met. Best to check before advertising.
- Fully renovated flat. If the renovation was done with a project and a major works licence, first occupation is processed on completion with the final works certificate. If it was a renovation under a declaración responsable for works without altering the layout, second occupation is usually enough.
- Commercial unit converted into a home. After the change of use with a project and licence, first occupation is essential for the home to exist for all purposes; see commercial renovation in Alicante for how we approach the works.
- Foreign buyer who needs the "cédula" for the mortgage or the deed and is not in Spain: we coordinate access with the agent or whoever holds the keys, and send everything by email.
What to do if the home does not comply
Usually something small and fixable fails: it is repaired, rechecked and submitted.
The defects we see most:
- Internal bathroom with no ventilation or extractor. An extractor with a proper outlet is fitted.
- Old electrical installation with no protection. The consumer unit is replaced and the circuits checked.
- Significant damp. Treated first; see damp treatment in Alicante.
- Kitchen with no extraction or no sink. Completed.
- A windowless room used as a bedroom. It does not count as habitable; the layout is rethought.
- Unlicensed works that altered the home (an enclosed terrace, changes to the facade). It may be necessary to regularise or adjust them first; the technician advises and we handle the paperwork.
The partner technician tells you what is needed and we carry out the repairs with a fixed itemised quote, so that the whole package (repair and procedure) has a single person responsible.
Common mistakes
- Assuming the home has a valid licence. In older flats, almost never; checking at the start avoids delaying the signing.
- Ordering it the week of the completion. If a licence has to be resolved or something fixed, there is no time. Order with a margin.
- Confusing it with the energy certificate. They are two documents; to sell or let you usually need both.
- Processing it before renovating when the renovation will force a renewal. If you are doing major works, first the works, then the occupation.
- Letting without it "because the tenant does not ask". The water or electricity company will, and for tourist use it is a requirement.
- Hiding defects from the technician. They will see them anyway, and if they sign an inaccurate report they are liable; better to fix and submit with confidence.
- Forgetting the fees. Where they exist, they are paid on submission; have them in mind.
- Converting a commercial unit without thinking about first occupation. Without it you will not get utilities as a home or be able to sell it as one.
When to call a professional
The cédula or occupation licence always requires a technician to issue the report; what you can do is check whether you already have one, gather the paperwork and plan the timing.
Before calling:
- Look through the property's papers for a previous occupation licence or cédula and its date; if you bought recently, ask your solicitor or the agent.
- Find the catastral reference and, if there is one, the deed.
- Check that water, electricity and drainage work and that there is no obvious damp.
- Decide what you need it for and by when.
Call a professional when you are about to sell, let or connect utilities, when you have finished works under a licence, or when you suspect the home does not comply (bathroom with no ventilation, old electrics, unlicensed works). If you order it together with the energy certificate, the technician handles both in one visit; the guide on the energy performance certificate in Spain explains that document.
At Costa Renova we arrange the cédula de habitabilidad or occupation licence and the energy certificate with partner technicians in Alicante and up to 45 km away, in English, and if something has to be fixed first we do it with a fixed itemised quote and a single person responsible. Ask for a price and a date on energy certificate and cédula in Alicante or get in touch through our contact page; the visit to quote for repairs is free.
Frequently asked questions
What is the cédula de habitabilidad in Alicante?
It is the document that confirms a home meets the minimum conditions to be lived in. In the Valencian Community it is processed as an occupation licence or declaración responsable de ocupación at the town hall: first occupation for new homes or after major renovations, and second occupation for existing homes. Many people, estate agents and the utility companies still call it the cédula.
How much does the cédula de habitabilidad cost?
The service costs €100 to €200, VAT not included, and includes the technician's visit, the habitability report and submission to the town hall. Municipal fees, where they exist, are paid separately. If it is ordered together with the energy certificate (€90 to €180), it is done in a single visit.
When do I need the cédula or occupation licence?
When selling or letting a home, in many cases to connect or change the name on water, electricity or gas supplies, and after new construction, full rehabilitation or a change of use (first occupation). Some banks also ask for it for mortgages. If your home has a valid occupation licence, you do not need another until it expires.
How long does the cédula take in Alicante?
The part that depends on us (visit, report and submission) is done in a few days. When it is processed as a declaración responsable, the submitted document takes effect from its registration; when the town hall has to resolve a licence, the timing is set by the town hall and is outside our control. We tell you which applies in your case.
What does the technician check for the cédula?
That the home meets the habitability conditions: minimum floor areas and ceiling heights, ventilation and natural light in the rooms, a bathroom and kitchen with their services, water, electricity and drainage working and, for second occupation, no serious safety or sanitation defects. If something fails, the technician tells you what to fix before submitting.
What if the cédula has expired?
It has to be renewed with a new licence or declaración responsable for second occupation. It is the most frequent situation in older Alicante flats sold or let after many years with the same owner. The procedure is the same as for a home that never had one.
Can I let without a cédula de habitabilidad?
You should not: in the Valencian Community the occupation licence is required for the property to be used as a home, and many utility companies ask for it to put the supply in a new tenant's name. For holiday lets, the occupation licence is one of the documents required for the tourist-use declaration.
Is the cédula the same as the energy certificate?
No. The cédula or occupation licence confirms habitability; the energy certificate rates consumption and emissions with a letter. To sell or let you usually need both, and they can be ordered together with a single technician's visit.
What is a habitation certificate in Spain?
A habitation certificate, the cédula de habitabilidad, confirms that a home meets the minimum conditions to be lived in. In the Valencian Community the document is now an occupation licence or a declaración responsable de ocupación, but most agents and buyers still use the old name.
What is the declaración responsable de segunda ocupación?
It is the procedure for an existing home that needs to confirm it is habitable, for a sale, a let or a utility contract. A technician writes a report, and the owner submits it to the town hall as a declaración responsable, in places such as Alicante, Torrevieja or Benidorm. The exact procedure depends on the municipality and the rules in force.
Updated: