Rewiring a house or flat in Alicante: consumer unit, earthing and certificate

Rewiring a home in Alicante means a new consumer unit with RCD protection, separate circuits, earthing, new cable and fittings, and an electrical certificate (the boletín) signed by an authorised installer. It is quoted as a fixed price after a visit; loose electrical work is €35 to €50 per hour, IVA not included.

  • Fixed, itemised quote, free and with no obligation
  • Site visit within 48–72 h in Alicante and 45 km around
  • One project manager from start to finish
Illustrative image: electrician rewiring a home
Illustrative image: electrician rewiring a home.
On this page
  1. Rewiring a house in Spain: where to start
  2. When rewiring makes sense
  3. What a full rewire includes
  4. The electrical certificate (boletín) explained
  5. What rewiring costs
  6. Where it fits in a renovation
  7. How we work
  8. Where we work
  9. Ask for a free quote

Rewiring a house in Spain: where to start

Rewiring means replacing the consumer unit, cable and fittings with an installation that meets current regulations, and it is quoted as a fixed price after a visit. If you are not sure what state yours is in, start with an inspection: not every home needs everything replaced.

This page covers full or partial rewiring of homes. For faults, small jobs and power increases, see our general page for an electrician in Alicante. Many buyers of older Spanish properties land here after hearing "you will need a new electrical certificate" from an agent or a surveyor, so we explain what that certificate is further down.

When rewiring makes sense

Rewire as soon as you see signs of age or missing protection: fuses instead of breakers, no RCD, no earth, cloth or aluminium cable.

The usual cases in Alicante and the surrounding towns:

  • Flats from the 1960s and 1970s in Centro, Benalúa or Carolinas, wired for a fraction of today's appliances. They struggle with an oven, induction hob and air conditioning running together.
  • An old consumer unit. Screw-in fuses or a single switch for everything. See our guide on when to replace an old fuse box.
  • Aluminium or cloth-covered cable. Both belong to older installations and deteriorate with age.
  • No earth. Two-pin sockets are a risk to people, particularly in bathrooms and kitchens.
  • A holiday home that has been shut up for years. Damp, salt air and long periods without use take their toll on old fittings.
  • A big renovation. If walls are being opened anyway, closing them over old cable makes no sense.
  • New equipment. Air conditioning, a heat pump or a charger may need dedicated circuits.

Warning signs not to ignore: breakers that trip, warm sockets, flickering lights, a smell of burning. If you smell burning, switch off the main switch and touch nothing.

What a full rewire includes

A complete rewire includes a new consumer unit, separate circuits, earthing, protections, fittings and the installation certificate.

Element What is done
Consumer unit New, with a breaker per circuit
RCDs Protection against earth leakage and contact
Circuits Separate for kitchen, bathrooms, air conditioning and general sockets
Earthing Checked or installed, with every point connected
Cable New, in conduit, correctly sized
Fittings New sockets and switches
Certificate Electrical installation certificate (boletín), signed by an authorised installer

The number of circuits and points is agreed with you at the visit, based on how you use the property.

The electrical certificate (boletín) explained

In Spain, the electrical certificate is the boletín eléctrico: a document signed by an authorised installer confirming the installation meets the low-voltage regulations. It is a different document from the energy performance certificate, which rates a property's energy efficiency and is covered on our energy certificate page.

You will normally meet the boletín in three situations: after new work or a rewire, when the electricity company asks for it to open a new supply or change the contracted power, and when buying an older property whose paperwork is out of date. Rules and what is asked for vary, so confirm the detail for your case with your gestor. What we can do is inspect the installation, quote any corrections and have the certificate issued when the work is finished. The full explanation is in our guide to the boletín eléctrico and electrical certificate in Spain.

What rewiring costs

Rewiring is quoted as a fixed price after the visit; the range depends on the floor area, the number of points and the wall chasing, and we do not give a figure for a home we have not seen.

What we do publish: an electrician by the hour at €35 to €50, IVA not included, for repairs and small jobs, and a full flat renovation at €450 to €900 per m² plus IVA, which already includes the electrical installation. For worked reference numbers, read our guide on the cost of rewiring a flat in Spain.

IVA on rewiring a private home is normally 10% when it is part of a renovation of a home more than two years old, and 21% for commercial premises. Factors that move the price: the number of points, whether cable can run through a false ceiling, whether every wall has to be chased and whether the contracted power is increased, which is a separate procedure covered in increasing your electricity supply.

Where it fits in a renovation

The electrics go in after the layout is set and before walls and ceilings are closed, which avoids double chasing and saves time.

  1. Strip-out and partitions. The layout is fixed first, for example with plasterboard.
  2. First fix. Electrics and plumbing run their conduits and pipes.
  3. Testing. Each circuit is tested with the walls still open.
  4. Closing and finishes. Plastering, tiling, ceilings and paint.
  5. Fittings and certificate. Sockets are fitted and the certificate is issued.

If it is part of a full home renovation, the electrics are one phase of the programme.

How we work

  1. Technical visit within 48 to 72 hours. We check the unit, the earth, the contracted power and the state of the cable.
  2. Fixed itemised quote, explained in English.
  3. Socket and light plan agreed with you on a drawing, or by email if you are abroad.
  4. Works, with photos of the open walls before they are closed.
  5. Handover with the certificate, the paperwork and a written guarantee.

Interior rewiring is normally processed with the works through a declaración responsable or a licencia de obra menor, and we handle it. If it touches the shared riser or other common elements, we coordinate with the community of owners.

Where we work

We rewire homes in Alicante and within 45 km, including Elche, Benidorm, San Vicente del Raspeig, El Campello and Santa Pola. See all areas we cover.

Ask for a free quote

Tell us the age of the property, what you have noticed and whether you are buying, selling or living there. We visit within 48 to 72 hours and send a fixed-price quote at no cost. Contact us to arrange the free visit.

Frequently asked questions

How do I know if my house in Spain needs rewiring?

Look at the consumer unit and the sockets. Rewirable fuses, no RCD, two-pin sockets without earth, cloth-covered or aluminium cable, or breakers that trip often all point to an old installation. On a visit we inspect the unit and the circuits and tell you whether a new unit is enough or the whole house needs doing.

How much does it cost to rewire a house in Alicante?

It is quoted as a fixed price after a visit, because it depends on the floor area, the number of points and how much of the wall has to be chased. Loose electrical work is €35 to €50 per hour, IVA not included. In a full flat renovation (€450 to €900 per m²) the rewiring is already included.

What is the electrical certificate in Spain?

It is the boletín eléctrico, formally the certificate of the electrical installation. An authorised installer signs it when the work is finished and complies with the low-voltage regulations (REBT). It is not the same as the energy performance certificate, which rates energy efficiency.

Do I need an electrical certificate to sell or rent my property?

It is not something a buyer can normally insist on by itself, but it is often asked for when contracting a new supply or changing the contracted power, and a recent one reassures buyers. Check with your conveyancer or gestor what applies to your sale. If the installation fails inspection, we quote the corrections.

How long does rewiring take?

It depends on the size of the property and whether it is empty. We put the programme in writing in the fixed quote. Inside a full renovation, the electrics are done before the walls and ceilings are closed.

Can the rewiring be done while the property is occupied?

It can, but it is faster and cleaner when the home is empty or part of a renovation. If you have to stay, we work in phases and leave temporary circuits live.

I own a flat in a block and live in the UK. Can you handle the rewiring remotely?

Yes. You approve the quote and the socket plan by email, we arrange access with your key holder or agent, and your project manager sends photos of the open walls and circuits before they are closed. Anything touching shared risers is coordinated with the community administrator.

Does rewiring mean I also need more electrical power?

Not necessarily. They are separate procedures, but if you are adding air conditioning, an induction hob or a car charger, it makes sense to plan both together. See our guide on increasing electricity supply.

Updated: · Guide prices for 2026, VAT not included. The final price is fixed in a written quote after the site visit.