Installing air conditioning in a flat: the short answer
To install air conditioning in a Spanish flat you need, in general, three separate permissions, and none replaces another. If you rent, the landlord's written authorisation, because the installation drills through walls and fixes a unit outside. If the outdoor unit goes on the facade, in a shared light well or on the roof, the agreement of the community of owners, because those are common elements. And in every case, compliance with the municipal by-laws on location, noise and condensate drainage, with a declaración responsable or prior notification where the town hall requires one. If the unit goes inside your own terrace or balcony without altering the facade, respecting the statutes and the by-laws is normally enough. We install split systems from €900 to €1,600, VAT not included, and handle the paperwork.
In Alicante almost every home ends up with air conditioning, and in the 1960s to 1980s buildings of the city centre, Carolinas, Benalúa or San Blas, where nobody planned for a unit on every flat, the result is facades covered in units fixed at random and recurring arguments at community meetings. For owners and tenants arriving from the UK or Ireland, where none of this exists, the layers of permission come as a surprise. This guide explains which permissions apply in each situation, how to ask for them without the process dragging on, which locations cause fewest problems and what to do if you are refused. The laws and by-laws are explained in general terms; every municipality and every community has its own rules, and we check them for your case.
The three permissions and when each applies
The landlord's permission applies if you do not own the flat; the community's, if you touch common elements; the town hall's, whenever the by-laws regulate the installation, which in Alicante and its surroundings they generally do.
| Situation | Landlord (rental) | Community | Town hall |
|---|---|---|---|
| You own the flat, outdoor unit on your own terrace or balcony, not projecting or altering the facade | Not applicable | Notify; respect statutes and internal rules | Comply with by-laws (noise, condensate); declaración responsable if the municipality requires it |
| You own the flat, outdoor unit on the facade | Not applicable | Yes: meeting resolution or consent according to the statutes | By-laws: often restricted or banned on street facades; municipal procedure |
| You own the flat, outdoor unit in an internal light well or on the roof | Not applicable | Yes: agreement, and sometimes a fixed common location | By-laws and procedure |
| Tenant, any location | Yes, in writing | Yes, in the same cases as an owner; applied for by the landlord or by you with their authorisation | Same as the owner |
| Detached house on an urbanisation with a community | Not applicable if you own it | Depends on the urbanisation's statutes (facades, appearance) | Municipal by-laws |
| Ground-floor commercial unit | According to the lease | Yes if it goes on the facade or a shared roof | By-laws and, in general, the activity licence or a specific procedure |
| Replacing an existing unit with another in the same place | Inform the landlord | Notify; normally no new agreement if location and size do not change | Check by-laws; usually counts as maintenance |
A frequent mistake is to think "there are already other units on the facade, so I can put mine up". That the community has tolerated earlier installations is not permission for yours, although it is a strong argument if you are refused arbitrarily.
The landlord's permission in a rented flat
Installing air conditioning drills through walls, fixes brackets outside and adds an electrical circuit: in general, Spanish tenancy law treats this as works that alter the property and requires the landlord's written consent. Without it, the landlord can require you to restore the original state at the end of the tenancy and deduct it from the deposit.
What is worth agreeing in writing, even as a one-page annex to the lease:
- Equipment and location. Model, capacity, where the indoor and outdoor units go, where the pipes and the drain run.
- Who pays. The usual arrangements: the tenant installs at their own cost, or the landlord installs and adjusts the rent. Shared arrangements exist too.
- What happens at the end. Whether the equipment stays (the norm, because removing it leaves holes and it is worth little second hand) or the tenant takes it and makes good the walls and facade.
- Who deals with the community and the town hall. The landlord is the one with a vote at the meeting; the tenant can handle it with their authorisation.
- Maintenance and repairs. Who pays for filters, servicing and repairs during the tenancy.
- Installing company. That a qualified company does it, with the right electrical circuit and a piped drain; it is in the landlord's interest as much as yours.
If the landlord refuses, there is no fixed installation possible. The alternatives are portable units (with the exhaust hose through a window, less efficient and noisier) or the two-piece no-drilling systems, which do not need holes but still mean running a hose out and placing a small unit outside; even then it is worth asking, because a unit hanging off the balcony can also bother the community.
The community's permission: facade, light well and roof
The facade, the light wells and the roof are common elements, and in general Spanish horizontal property law requires the community's agreement to alter them; the statutes may set conditions, and many communities adopt common rules on where and how units are installed. Your terrace or balcony is yours to use, but its railing and its front are still facade.
How it works in practice:
- Read the statutes and the minutes. Many communities have already agreed a location (internal light well, roof with a shared plinth, a strip of the rear facade), a grille colour or a ban on the main facade. If a prior agreement exists and you fit within it, notifying the administrador is enough. If your Spanish is limited, the administrador's office will usually summarise the relevant resolution for you.
- Prepare the application. Equipment description, exact location with a photo or sketch, pipe and drain route, the manufacturer's sound level, the installing company, a commitment to make good any damage. The more specific, the fewer rounds.
- Ask the administrador to put it on the agenda of the next general meeting, or to process it by written consent if the statutes allow. The majorities that apply and how they are counted, in general terms, are in community of owners permission for renovations. If you cannot attend, give a proxy.
- Offer answers to the usual objections: noise (a low-noise inverter unit, anti-vibration mounts, working hours), dripping (drain piped to the rainwater downpipe or with a pump), appearance (a location not visible from the street, a grille in the facade colour), safety (stainless steel brackets on the coast, installation by a qualified company).
- Keep the agreement in writing. The minutes or the signed consent are your protection against a new neighbour or a new administrador.
Locations, from least to most contentious:
| Location | What it usually requires | Pros and cons |
|---|---|---|
| Floor of your own terrace or balcony, not projecting | Notification; compliance with noise and condensate by-laws | The simplest; takes space and can bother the next-door neighbour with noise |
| Internal light well | Agreement; sometimes a fixed location and height | Hidden; noise echoes and small light wells trap heat |
| Roof with piped runs | Agreement; pre-installed pipework through a service duct | Best appearance and performance; long pipe runs and access for servicing |
| Rear or side facade | Agreement and by-laws; grille or louvre | Common in older buildings; visible from neighbouring courtyards |
| Main facade onto the street | Agreement and by-laws; in many municipalities not allowed or must be integrated | The most problematic; avoid |
If you are in the middle of a full renovation, this is the moment to solve it properly: pre-installed pipework to the roof or the light well, a piped drain and a circuit with its own breaker avoids the problem for good. We plan it within our full home renovation in Alicante service.
The town hall: by-laws, condensate and the declaración responsable
In general, municipal by-laws regulate where the outdoor unit may go (restricting or banning street facades), the minimum height above the pavement, the distance to neighbours' windows, noise and the obligation to pipe condensate to a drain, and many require a declaración responsable or prior notification. The specific rules change from one municipality to another.
What a by-law usually regulates, in general terms:
- Location. A ban or restriction on units on facades visible from the street, unless integrated behind a louvre or in a designed recess; preference for light wells, roofs and terraces.
- Height and air discharge. A minimum height above the pavement and a rule that hot air is not blown directly at pedestrians or at neighbours' windows within a certain distance.
- Noise. Daytime and night-time emission limits measured at the nearest neighbour; current low-noise units meet them easily if properly mounted.
- Condensate. A ban on discharging onto the street; an obligation to pipe the water to the drainage or rainwater system.
- Procedure. Prior notification or a declaración responsable for installations on facades or common elements; in listed buildings, a licence with a heritage report.
In Alicante, Elche, Benidorm, Torrevieja or Santa Pola we check the current by-law for your building and prepare the declaración responsable where it is required. What the procedure is and how it works is explained in declaración responsable for building works in Spain. We do not quote specific fees: they vary and we detail them case by case.
A note on listed buildings in the old town or on catalogued facades: there, installation on the facade is in general vetoed and you have to go to the light well or the roof; we check it before proposing anything.
What to ask of the installation so it causes no problems
A well-installed unit is the best defence against neighbours and the town hall: proper brackets, anti-vibration mounts, a piped drain, its own electrical circuit and a low sound level. What a cheap installation saves is paid back in complaints.
- Brackets. Anchored to the structure, not to hollow brick or to the railing; on the coast (Playa de San Juan, El Campello, Santa Pola, Torrevieja), stainless steel or aluminium because of the salt air.
- Anti-vibration mounts. Between the unit and the bracket: most night-time noise complaints are vibration transmitted through the wall, not the fan.
- Condensate drain. To the rainwater downpipe, to a trapped drain or to a tank with a pump; never "into the air" over the pavement or onto the neighbour's terrace. It is the number one complaint in Alicante.
- Electrical circuit. Its own circuit with breaker and RCD, under the Spanish low-voltage regulations; if the consumer unit is old, it is worth checking. Our electricians, for example in Torrevieja, handle it.
- Pipe route. In trunking the colour of the facade or through a service duct; never across neighbours' windows.
- Sound level. Current inverter units with a quiet mode; ask for the data sheet and keep it for the community.
- Qualified company. For the refrigerant side (fluorinated gases) and the electrical side. Without it there is no guarantee and no liability.
| Our related prices (VAT not included) | Amount |
|---|---|
| Split air conditioning unit installed (brackets, circuit, piped drain) | €900 to €1,600 |
| Electrician for minor works (own circuit, breaker) | €35 to €50 per hour |
| Aerotermia heat pump (heating, cooling and hot water, single outdoor unit) | €6,000 to €12,000 |
What each installation includes and why the price varies is in air conditioning installation cost in Alicante. If you are weighing up a heat pump instead, see aerotermia heat pump vs air conditioning.
If you are refused: options
A refusal from the community is almost always resolved with an alternative location or with conditions; a refusal from the landlord, with no-drilling equipment; and a by-law restriction, with the light well, the roof or integration into the facade.
- The community says no to the facade. Propose the internal light well or the roof with piped runs; offer to pay for the pre-installation and the making good. If other units are tolerated on the same facade and you are refused without reason, take advice: in general, an arbitrary refusal of an installation that harms nobody is open to challenge, but every case turns on its facts.
- The community sets conditions. Accept them if reasonable (colour, hours, common location): it is cheaper than a dispute.
- The landlord says no. A portable or no-drilling unit; or negotiate that they install it and adjust the rent: for the landlord it is an improvement that stays with the flat.
- The by-law does not allow the facade. Light well, roof or an integrated louvre, depending on what the municipality accepts.
- Listed building. Light well or roof; in some cases, systems with no visible outdoor unit, with lower performance and a higher price.
Common mistakes
- Installing first and asking afterwards. Removing the unit and making good the facade costs more than the installation.
- Assuming the terrace is "yours" for everything. The use is private; the railing and the front are still facade.
- Leaving the drain dripping onto the street. The most common complaint and the quickest route to proceedings.
- Hanging the unit off the railing or off hollow brick. Vibration, noise and, in time, a risk of it falling.
- Not putting it in writing with the landlord. The argument arrives with the deposit.
- Applying without documentation. "I want to put in air con" gets postponed; "this unit, here, like this, with this noise level and this drain" gets approved.
- Hiring a company without the right qualifications. No refrigerant certification and no guarantee; and if the community asks for the installation certificate, you will not have one.
- Forgetting the electrical circuit. A split hung off the socket circuit trips the breaker in July and overheats the cable.
When to call a professional
Reading the statutes, talking to the landlord and the administrador and preparing the application is something you can do; the installation (refrigerant and electrical), the technical choice of location and the municipal procedure are the work of a qualified company.
Do it yourself:
- Ask the administrador for the statutes and any previous resolutions on air conditioning.
- Talk to the landlord and put the agreement in writing.
- Photograph the proposed location and measure distances to neighbours' windows.
- Gather the unit's data sheet (capacity, sound level).
Call a professional:
- To decide the technical location (performance, pipe route, drain) before applying: a well-prepared application gets approved.
- For the complete installation by a company qualified in fluorinated gases and electrics.
- For the declaración responsable or prior notification where the municipality requires it.
- For pre-installations during renovations, with pipework to the roof or light well.
- If an existing installation drips onto the street, vibrates or trips the RCD: regularising it avoids the complaint.
If you want to install air conditioning without falling out with the community, the landlord or the town hall, we visit within 48 to 72 hours in Alicante and the surrounding area, propose the location that causes fewest problems, prepare the documentation for the meeting and the municipal procedure (in Spanish, with a summary for you in English), and give you a fixed, free quote for the installation, by a qualified company with a written guarantee. See our air conditioning in Torrevieja page if you are on the southern coast, our renovations in Benidorm page for the north, and book your visit through contact.
Frequently asked questions
Do I need the community's permission to install air conditioning in Spain?
If the outdoor unit goes on the facade, in a shared light well, on the roof or on any common element, yes: in general, Spanish horizontal property law requires the community's agreement to alter common elements, and the statutes may set conditions or a location. If it goes inside your own terrace or balcony without altering the facade or disturbing anyone, notifying the administrador and respecting the community rules and the by-laws is normally enough.
Can I install air conditioning in a rented flat in Spain?
Only with the landlord's written authorisation, because the installation means drilling through walls and fixing a unit outside, which Spanish tenancy law in general treats as works that alter the property. Agree in writing who pays, whether the equipment stays at the end of the tenancy and who applies to the community, which is still required.
Do I need a licence from the town hall for air conditioning?
It depends on the municipality and where the unit goes. In general, by-laws regulate outdoor units on facades (often banned or restricted on street facades), distances to neighbours' windows, noise and condensate drainage, and many require a declaración responsable or prior notification. In Alicante and the surrounding municipalities we check this case by case and handle the paperwork.
What happens if I install air conditioning without the community's permission?
The community can require you to remove the unit and make good the facade, and the town hall can open proceedings if it breaches the by-laws. In practice many communities tolerate existing installations, but a new one without agreement, on a visible facade or disturbing a neighbour, is a dispute that usually ends at the general meeting or in a claim. Asking first is cheaper than removing afterwards.
Where can the outdoor unit go?
The usual locations, from least to most problematic: inside your terrace or balcony without projecting, in an internal light well with agreement, on the roof with agreement and pipework run through ducts, and on the facade only if the community and the by-laws allow it. By-laws usually require that it does not drip onto the street, does not exceed noise limits and is not visible from the street on main facades.
Can the community ban air conditioning?
It can regulate where and how, through the statutes or meeting resolutions: a common location for all units, grille colour, working hours, condensate piping. What it cannot do in general is refuse arbitrarily any installation when there is a location that does not alter common elements or harm anyone; in a dispute, take advice, because Spanish courts judge each case on its facts.
Who pays for air conditioning in a rented flat?
Whatever you agree. It is common for the tenant to install at their own cost with permission and for the equipment to stay in the flat at the end of the tenancy, or for the landlord to install and adjust the rent. The important thing is to put it in writing, with the model and location, to avoid arguments over the deposit. An installed split costs €900 to €1,600, VAT not included.
What documents do I need to ask the community for permission?
A short description of the equipment and its capacity, the exact location of the outdoor unit with a photo or sketch, how the pipes and condensate drain will run, the unit's sound level from the manufacturer, a commitment to make good any damage and the name of the installing company. With that, the administrador puts it on the agenda of the meeting or processes it by written consent.