How much does it cost to renovate a small cloakroom in Alicante in 2026

Guide · 10 min read · Costa Renova site team · updated

Renovating a small cloakroom or guest WC (toilet and basin, 1.5 to 3 m²) in Alicante costs €3,500 to €6,000, VAT not included, and the work takes around 1 to 2 weeks. It does not cost half of a full bathroom (€5,500 to €12,000) because the plumbing, electrics and project management barely shrink with the square metres; what falls is the tiling and the number of pieces. Adding a shower turns the cloakroom into a small bathroom and moves it up a price band.

  • Fixed, itemised quote, free and with no obligation
  • Site visit within 48–72 h in Alicante and 45 km around
  • One project manager from start to finish
Illustrative image: renovated bathroom with a walk-in shower
Illustrative image: renovated bathroom with a walk-in shower.
On this page
  1. Small cloakroom renovation cost: the short answer
  2. Cloakroom renovation price item by item
  3. Why a 2 m² cloakroom does not cost half of a 5 m² bathroom
  4. What makes a cloakroom cost €3,500 or €6,000
  5. How to work out your cloakroom budget step by step
  6. Where to save and where not to in a cloakroom
  7. Adding a shower: when it stops being a cloakroom
  8. Timeline: how long it takes and what delays it
  9. Common mistakes
  10. When to call a professional

Small cloakroom renovation cost: the short answer

Renovating a small cloakroom with a toilet and basin, 1.5 to 3 m², costs €3,500 to €6,000, VAT not included, and the work takes around 1 to 2 weeks. It does not cost half of a full bathroom (€5,500 to €12,000) because the items that weigh most, plumbing, electrics, strip-out and project management, barely change with the square metres; what falls is the tiling, the floor and the number of pieces, and there is no shower. If you add a shower, it stops being a cloakroom and moves into the bathroom range.

These are the guide prices we work with in Alicante and within 45 km, the same ones on our renovation prices page. The Spanish word you will see on quotes is aseo: a WC with a toilet and a basin, no shower or bath. British owners call it a cloakroom, a downstairs loo or a guest toilet. In this guide we break a cloakroom down item by item, explain why a price per square metre is so misleading in such a small space, which decisions put you at the top or bottom of the range and where you can save without it showing.

Cloakroom renovation price item by item

A complete cloakroom quote has the same items as a bathroom quote, minus the shower and the screen; if the quote you have been given has four lines, information is missing. The ranges in the second table are our 2026 guide prices; the share of each item within the total is indicative and changes with every cloakroom.

Item What it covers in a cloakroom What moves the price
Strip-out and removal Removing wall and floor tiles, toilet, basin and sometimes a bidet, taking out rubble Tiling to the ceiling, no lift in the building, distance to the skip
Plumbing Hot and cold feeds to the basin, feed and waste to the toilet, isolation valves Moving the toilet, lead or iron pipes, old soil stack
Electrics Light point, protected socket, extractor, mirror light, earth connection Installation with no earth, ducted extractor, recessed lighting
Building work Rendering, stud wall for a wall-hung toilet, boxing in the soil stack Wall-hung toilet, niche, lowered ceiling
Wall and floor tiling Wall tiles (half height or to the ceiling) and floor, grouting Format, large rectified tiles, cuts in a small space
Sanitaryware and taps Toilet, basin or vanity unit with basin, mixer tap Grade; wall-hung toilet; countertop basin
Vanity unit, mirror and accessories Unit or small basin, mirror with or without light, towel rail, roll holder Made-to-measure unit, mirror with integrated light
Painting and ceiling Moisture-resistant plasterboard ceiling where needed, anti-mould paint on untiled walls Ceiling area, downlights
Ventilation Timer extractor connected to the shared duct or outside New duct, in-line extractor
Management and cleaning Declaración responsable, skip or bags, final clean Town hall fees, access
Type of job 2026 guide price (VAT not included) Indicative timeline
Full small cloakroom (toilet and basin, 1.5 to 3 m²) €3,500 to €6,000 1 to 2 weeks
Full bathroom 4 to 6 m² (with shower) €5,500 to €12,000 2 to 3 weeks
Cloakroom refreshed without strip-out: microcement over existing tiles €70 to €120 per m² (plus sanitaryware and taps) Days
Painting walls and ceilings €8 to €14 per m² 1 day

Plumbing, electrics and building work are the items with the least room to trim: they are what ends up behind the tiles and what forces you to rip out again if they fail. The room to move is in the finishes: tiles, sanitaryware, taps, vanity unit and mirror.

Why a 2 m² cloakroom does not cost half of a 5 m² bathroom

In a cloakroom, the price per square metre is the most misleading figure in the whole renovation: a 2 m² cloakroom can come out at more than double per metre than a 5 m² bathroom, and that is normal.

The reason lies in which items depend on the square metres and which do not:

  • Independent of the metres: the plumber running water and waste to the toilet and basin takes almost as long in 2 m² as in 5; the electrician doing the light point, the socket and the extractor, the same; the skip or rubble bags, the town hall paperwork, the final clean and the coordination, the same. These are fixed items.
  • Dependent on the metres: wall and floor tiling, grouting, painting and the ceiling. In a 1.2 x 1.8 m cloakroom with a 2.5 m ceiling there are about 12 to 13 m² of wall and 2 m² of floor; in a 2 x 2.5 m bathroom, about 20 m² of wall and 5 m² of floor.
  • What the cloakroom does not have: the shower or bath, its waste, the waterproofing and the screen, which in a bathroom are a significant share.

The result is that a cloakroom costs from €3,500 and a bathroom from €5,500: the difference is the shower and a few square metres of tile, not half the job. The full bathroom breakdown is in bathroom renovation cost in Alicante 2026.

A side effect: in a cloakroom, the pieces weigh heavily in the total. A high-range wall-hung toilet and a designer basin can be a very visible part of a €4,000 quote, whereas in a €10,000 bathroom they get diluted.

What makes a cloakroom cost €3,500 or €6,000

The difference between the bottom and the top of the range comes down to four decisions: whether you move the toilet, whether you make it wall-hung, whether old services have to be replaced, and what grade of finishes you choose.

1. Keeping or moving the toilet

Keeping the toilet where it is costs least: the 110 mm waste and the feed already reach it. Moving it means shifting the waste with a fall to the soil stack, sometimes raising the floor and, in the 1960s to 1980s flats of the Centro, Carolinas or Benalúa, touching a soil stack that may be asbestos cement. It is the most expensive plumbing item in a cloakroom and almost never improves the space enough to justify it.

2. Wall-hung or floor-standing toilet

A wall-hung toilet with a concealed cistern needs a frame and a 15 to 20 cm stud wall in moisture-resistant plasterboard or blockwork, which is then tiled. In a cloakroom that stud wall is usually used to hide the soil stack and create a shelf, and the result shows a great deal in such a small space; but it adds building work and parts. A floor-standing toilet goes onto the existing waste in a couple of hours.

3. State of the services

If the pipes are lead or iron, or the electrics have no earth or RCD, they are replaced: there is no sense in tiling a new cloakroom over a pipe that is going to fail. In cloakrooms in pre-1980s flats we assume everything gets renewed; in 1990s to 2000s flats in Garbinet, PAU 5 or Vistahermosa and in coastal apartments it can often be kept. We check this on the visit so it does not surface as an unforeseen extra, which matters doubly if you are not in Spain to deal with it. More detail in replacing lead or iron pipes in Spain.

4. Grade of finishes

A mid-format ceramic tile, a compact floor-standing toilet, an off-the-shelf basin unit and a decent mixer tap give you a well-resolved cloakroom at the bottom of the range. A large-format rectified porcelain tile (with many cuts in a small space), a rimless wall-hung toilet, a countertop basin with a tall spout and a mirror with integrated light put it at the top. Both are good cloakrooms; the difference is what matters to you in a room your guests see and you use every day.

How to work out your cloakroom budget step by step

In fifteen minutes with a tape measure you can tell which part of the range you are in and spot incomplete quotes.

  1. Measure. Length, width and height. Work out the wall area (perimeter times height, minus the door) and the floor. Decide whether you tile to the ceiling or to half height with anti-mould paint above; in a cloakroom, the second option saves metres and lightens the space.
  2. Check the services. The pipe material under the basin and behind the toilet, the state of the valves, whether the socket is earthed, whether there is an extractor and where it goes. If you are abroad, these are the three photos to ask your key holder for.
  3. Decide the layout. Toilet where it is or moved; floor-standing or wall-hung; pedestal basin, vanity unit or corner basin. In cloakrooms 1.2 m wide, a slim-depth unit (35 cm) changes the passage.
  4. Choose the grade of tiles, sanitaryware, taps and unit before asking for quotes, not after.
  5. Check that all ten items are there in the table. The ones that usually go missing from a cloakroom quote: extractor, ceiling or painting, waste removal and town hall paperwork.
  6. Add VAT and a margin. If you are a private individual and the property is more than two years old, the work can be taxed at 10% when materials are no more than 40% of the taxable base; we explain it in the reduced 10% VAT on renovations. Keep a small reserve for what appears once the tiles come off.
  7. Compare fixed itemised quotes, not totals: compare scope with scope.

Where to save and where not to in a cloakroom

Save on what is easy to change and on the metres of tile; do not save on what ends up behind the wall or on ventilation.

Where you can:

  • Keep the toilet where it is.
  • Tile to half height (1.2 to 1.5 m) and paint the rest with anti-mould paint: fewer metres, fewer cuts, more light.
  • Mid format rather than large format: in a cloakroom 1.2 m wide, every 60 x 120 piece needs cutting.
  • Compact floor-standing toilet and an off-the-shelf basin unit.
  • Mid-range taps from a manufacturer with spare parts: with Alicante's hard water, the cartridge and aerator scale up and you need to be able to replace them.
  • Refresh without strip-out when the substrate and services are sound: microcement over the existing tiles, €70 to €120 per m², VAT not included, or tile over tile, plus a new toilet, basin, tap and light. See our microcement in Alicante page.

Where you should not:

  • Plumbing and electrics. It is what you cannot see and the most expensive to redo.
  • Ventilation. An internal cloakroom without a ducted extractor develops mould and smell the first winter; in flats near the sea, sooner. Timer or humidistat extractor.
  • The toilet. The difference between a budget and a mid-range toilet is in the cistern mechanism, the glaze and the flush, and it shows within five years.
  • Tiling labour. In a cloakroom everything is on show and half a metre away: misaligned joints are more visible than in a large bathroom.

Adding a shower: when it stops being a cloakroom

If the cloakroom has at least 2.5 to 3 m² and the soil stack is close, a 70 x 90 or 80 x 100 cm shower can be added; at that point it becomes a small bathroom, with its waste, waterproofing, tiling to the ceiling and screen, and the budget moves into the full bathroom range, €5,500 to €12,000, VAT not included, at its lower end.

What has to be checked first: that the soil stack is at a distance that allows the shower waste to fall without raising half the floor, that there is height for the tray trap (in old flats, sometimes there is not), that hot water reaches the room (a guest WC sometimes only has cold), and that the ventilation will cope with steam in 2.5 m². With a slimline resin tray cut to size and a fixed screen, a 1.3 x 2.2 m cloakroom takes a 70 x 100 shower at the far end. The full job is covered on our bathroom renovation in Alicante page.

It is one of the most useful renovations in 1970s to 1980s three-bedroom flats with one bathroom and one cloakroom: a second shower room changes family life, and it is also one of the things that lifts the value and rentability of a holiday flat.

Timeline: how long it takes and what delays it

A full cloakroom is done in around 1 to 2 weeks: strip-out (1 day), services (1 to 2 days), building work and stud wall if there is a wall-hung toilet (1 to 2 days), tiling and floor (2 to 4 days), ceiling and painting (1 to 2 days) and fitting of sanitaryware, unit, mirror and accessories (1 day), with drying time between stages.

What stretches a cloakroom job is not the work but the waiting: a wall-hung toilet that is not on site when the frame has to go in, a tile that arrives late, a mirror with a light decided at the end. In a space where each stage takes a day, one missing material stops the whole job. That is why we have all materials confirmed before we start, and for owners abroad we agree the full specification by email or video call first and send photos at the end of each stage.

Common mistakes

  • Asking for a quote "per square metre". In a cloakroom the square metre means nothing; it is quoted item by item.
  • Comparing totals without looking at the items. A €3,200 quote with no extractor, no painting and no waste removal costs more in the end than a complete €3,800 one.
  • Moving the toilet to gain 10 cm. It is the most expensive plumbing item and rarely changes the room.
  • Forgetting the extractor. In an internal 2 m² cloakroom, mould and smell appear the first winter.
  • Large format in a 1.2 m wide room. Every piece needs cutting, there is a lot of waste and the layout looks forced. Mid format, or a well-planned large format.
  • Choosing sanitaryware after signing. In a cloakroom, a change of toilet or basin moves the total more than in any other room.
  • Tiling over old services. It saves a few hundred euros and forces you to rip out a new cloakroom when the pipe fails.
  • Starting without a declaración responsable or telling the community. A neighbour's complaint about the noise of the strip-out can stop a one-week job, and for an owner abroad it is the hardest problem to fix at a distance.

When to call a professional

In a cloakroom you can do the painting, fit accessories and the mirror yourself and, with experience, swap a floor-standing toilet for an identical one; the plumbing, the electrics, the tiling and any movement of the waste or the soil stack need a professional.

On your own: remove the tiles if you have the hands for it (goggles, gloves and great care with the pipes running inside the wall), paint the ceiling and untiled walls with anti-mould paint, assemble an off-the-shelf unit, fit the mirror, towel rail and roll holder, and take charge of ordering and receiving materials.

With a professional: the plumbing (above all the toilet waste and the connection to the soil stack), the electrics (bathroom and cloakroom circuits have specific protection requirements under the Spanish low-voltage regulations), the ducted extractor, the stud wall for a wall-hung toilet and the tiling, which in a cloakroom is seen from half a metre away. The declaración responsable can be filed by the owner, but it is simpler for the renovation company to handle it together with the work, and essential if you are not in Spain; if the cloakroom gives onto a lightwell and you want to open a window or a duct, the comunidad de propietarios (community of owners) also comes into it.

If you would like us to do it, we visit within 48 to 72 hours in Alicante and the surrounding area, measure the cloakroom, check the services and the soil stack and give you a fixed itemised quote, free and without obligation, with a written guarantee on the work and a single English-speaking project manager. See our bathroom renovation in Alicante service or book your visit through contact.

Frequently asked questions

How much does it cost to renovate a small cloakroom in Spain?

€3,500 to €6,000, VAT not included, for a toilet-and-basin cloakroom of 1.5 to 3 m² with strip-out, plumbing, electrics, wall and floor tiling, sanitaryware, taps, vanity unit, painting and waste removal. The lower end corresponds to keeping the layout and basic-range materials; the upper end to new services, a wall-hung toilet and mid to high-range finishes.

Why does a cloakroom not cost half of a bathroom?

Because the items that weigh most in a bathroom (plumbing, electrics, strip-out, waste removal, paperwork) are almost the same in 2 m² as in 5 m². What falls with the square metres is the wall and floor tiling and the number of pieces, and there is no shower. That is why a cloakroom costs from €3,500 and a full bathroom from €5,500, not half.

How long does a cloakroom renovation take?

Around 1 to 2 weeks with one coordinated team: strip-out in a day, services in one or two, building work and tiling in three or four, painting and fitting of sanitaryware in two. What stretches it is waiting for materials or a wall-hung toilet whose cistern has to be built into a new stud wall.

How much does it cost to add a shower to a cloakroom?

Adding a shower turns the cloakroom into a small bathroom: water and a waste with a fall to the soil stack, a tray or tiled wet-room floor, tiling to the ceiling in the shower area and a screen. The price moves into the full bathroom range, €5,500 to €12,000, VAT not included, at its lower end if the soil stack is close.

Can a cloakroom be renovated without ripping out the tiles?

If the services are sound and the tiles are firm, yes: microcement over the existing tiles (€70 to €120 per m², VAT not included) or tile over tile, with a new toilet, basin, tap, mirror and light. It comes in below the full renovation range. If there are lead or iron pipes, the honest answer is to strip out.

What makes a cloakroom renovation expensive?

Moving the toilet (a 110 mm waste with a new fall), a wall-hung toilet with a concealed cistern (frame and stud wall), replacing a soil stack or lead pipework, and high-range finishes in a space where every piece weighs heavily in the total. A designer basin in a 2 m² cloakroom can be a very visible part of the budget.

Do I need a licence to renovate a cloakroom in Alicante?

For an interior cloakroom renovation that does not touch the structure or facade, Alicante town hall normally requires a declaración responsable or a minor works licence. We handle it within the quote. If the cloakroom gives onto a lightwell and you want to open a window or a duct, the paperwork changes and the community of owners comes into it.

Does the 10% VAT rate apply to a cloakroom renovation?

If you are a private individual, the property is more than two years old and the materials are no more than 40% of the taxable base, the work can be taxed at 10%. In a cloakroom with a lot of labour and few metres of material it is usually met; with high-range sanitaryware and taps, the share of materials rises and it has to be checked. Our prices are shown without VAT.

Updated:

Get your free quote

Tell us what you want to renovate. We reply within 24 working hours and arrange a free, no-obligation visit.

📞 960 292 180
or email us at info@reformascostarenova.com

📞 CallHome Free quote