On this page
- Kitchen renovation cost: the short answer
- Kitchen renovation prices item by item
- What decides whether a kitchen costs €7,000 or €18,000
- How to work out your kitchen budget
- What is the cost of a kitchen renovation? The question answered
- Where to save and where not to in a kitchen
- Renovating a kitchen in Alicante: local specifics
- Timeline: how long it takes and what delays it
- Common mistakes
- When to call a professional
Kitchen renovation cost: the short answer
A complete kitchen renovation costs €7,000 to €18,000, VAT not included. With mid-range units and appliances, most flat kitchens in Alicante land between €10,000 and €14,000. The work takes 3 to 5 weeks.
These are our 2026 guide prices for Alicante and the surrounding area, the same ones you will see on our renovation prices page. The kitchen is the room where the budget per square metre varies most, because a large part of the money goes not on building work but on furniture, and in furniture the grade changes everything. In this guide we break down the items, explain what pushes the price up or down, and give you a method to estimate your own kitchen before asking for quotes, whether you cook in it every day or let the flat out for the summer.
Two Spanish terms you will meet: IVA is Spanish VAT, and the declaración responsable is the signed declaration filed with the town hall (Ayuntamiento) for most interior works. We handle the latter; the former is explained below.
Kitchen renovation prices item by item
A kitchen renovation has two budgets inside it: the building work and the furniture. It pays to see them separately, because they are bought and negotiated differently. The table shows the usual items; the share of each within the total is indicative and changes a great deal from kitchen to kitchen.
| Item | What it covers | What moves the price |
|---|---|---|
| Strip-out | Removing units, tiles, floor, appliances and rubble | Tiles to the ceiling, floor laid over floor, no lift |
| Plumbing | Feeds and wastes for sink, dishwasher, washing machine | Moving the sink, old pipework |
| Electrics | Kitchen circuits, oven, hob, worktop sockets, lighting | Old consumer unit, contracted power, induction hob |
| Gas, or removal of gas | New installation, or disconnection with certificate | Switching from gas to induction, authorised gas installer |
| Building work and plasterboard | Rendering, partitions, ceilings, making good after demolition | Opening the kitchen to the living room, lowered ceiling with lighting |
| Tiling and flooring | Splashback between worktop and wall units, floor | Format, porcelain, continuity with the living room floor |
| Units | Base, wall and tall units, hardware, plinths | Grade, laminate or lacquered, bespoke or modular, hinges and runners |
| Worktop | Laminate, compact, quartz, porcelain or natural stone | Material, thickness, edge profile, undermount sink |
| Appliances | Oven, hob, extractor, fridge, dishwasher | Grade, integrated or freestanding, energy rating |
| Painting and finishing | Walls, ceilings, architraves, skirting boards | Area, state of the walls |
| Management | Declaración responsable, skip, final clean | Fees, access |
| Type of renovation | 2026 guide price (VAT not included) | Timeline |
|---|---|---|
| Complete kitchen (building work + units + appliances) | €7,000 to €18,000 | 3 to 5 weeks |
| Complete kitchen with mid-range units and appliances | €10,000 to €14,000 | 3 to 5 weeks |
| Microcement over the existing tiles | €70 to €120 per m² | Depends on area |
| Plasterboard partition (to close off or divide) | €35 to €55 per m² | 1 to 2 days |
| Painting walls and ceilings | €8 to €14 per m² | 1 to 2 days |
If you want to understand how a quote is built line by line and what to look for when comparing, the renovation cost per m² guide has a section on turning a headline figure into an itemised budget.
What decides whether a kitchen costs €7,000 or €18,000
In a kitchen, four decisions explain almost all of the price difference: units, worktop, appliances and whether the layout changes. The labour for the building work is similar in a basic kitchen and a high-end one.
Units: modular or bespoke, laminate or lacquered
Modular, off-the-shelf units with laminate doors are the cheapest option and today the quality is reasonable. Bespoke units make use of every centimetre (important in the narrow kitchens of older flats) and allow lacquered, wood or handleless doors, but the price rises with each element. Hardware also counts: soft-close drawers, pull-out larder units and corner carousels add to the bill, though they are among the things you appreciate most day to day.
Worktop: from laminate to stone
A laminate worktop is the cheapest and easy to replace. Compact laminate, quartz and porcelain resist heat, knocks and stains far better and cost considerably more per metre. Natural stone (granite, marble) is beautiful and durable, but marble needs care. An undermount or integrated sink and a thick edge push up the price of the piece and of its installation.
Appliances: integrated or freestanding
A set of oven, hob, extractor, fridge and dishwasher at a basic grade costs much less than the same set integrated and mid to high range. Integrated appliances need specific units and should be chosen before the kitchen is designed, not after. Energy efficiency matters in Alicante too: an efficient fridge and dishwasher show on the bill through the long summer, and a holiday let runs the fridge all year whether you are there or not.
Layout: keep or move
Keeping the sink, hob and fridge where they are saves plumbing, electrics and building work. Moving the sink to an island or another wall means running a waste with a fall under the floor, which sometimes means raising the floor. Switching from gas to induction is very common in older Alicante flats and requires the gas supply to be disconnected with a certificate, plus a suitable electrical circuit; sometimes also an increase in contracted power, which we explain in the rewiring a flat in Spain guide.
Opening the kitchen to the living room
This is the most frequent request in renovations of 1960s to 1980s flats in the city centre, Carolinas or El Pla, where the kitchen is a closed corridor. If the wall is a simple partition, the demolition is a moderate item and the result transforms the flat. If it is load-bearing (common in older buildings built with wall structures rather than columns), you need a structural project from a technician, a beam, and a licencia de obra mayor (major works licence), at a much higher cost. We always check this on the visit before quoting.
How to work out your kitchen budget
You can estimate your kitchen in four steps: measure the linear metres of units, decide the grade, check the services and add the building work. It is no substitute for a fixed quote, but it tells you which band you are in.
- Measure the linear metres of units. Measure the walls where base and wall units will go. A typical L-shaped flat kitchen has 4 to 6 linear metres of base units; an open kitchen with an island or peninsula, more.
- Decide the grade of units, worktop and appliances. Visit showrooms with your measurements, or send them to us if you are abroad, and get a price for the furniture on its own. It is the biggest figure and the one you control most.
- Check the services. If the building is pre-1980s and the kitchen has not been renovated, count on new plumbing and electrics. If there is gas and you want induction, add the disconnection with certificate.
- Add the building work. Strip-out, services, plastering, tiling, floor, painting, waste removal and the declaración responsable. Check the quote includes all of them.
- Add VAT. If you are a private individual, the property is more than two years old and the materials are no more than 40% of the taxable base, the rate is 10% IVA; in kitchens, the weight of the furniture can mean the condition is not met, in which case the rate is 21%. Your quote should state which applies.
What is the cost of a kitchen renovation? The question answered
The cost of a kitchen renovation in Spain depends on five things: the size of the kitchen, the quality of the units, the worktop, the appliances and how much the layout and services change. In Alicante that means €7,000 to €18,000, VAT not included, in 3 to 5 weeks, with most mid-range kitchens at €10,000 to €14,000. For a kitchen renovation cost estimate that you can rely on, work through four questions:
- What is the size and shape of the kitchen? More units and worktop mean more cost.
- What will the units, worktop and appliances be? These are the biggest variables.
- Is the layout staying the same? Moving the sink, hob or drains costs more.
- What is the condition of the pipes, wiring and walls? Old services are replaced during a renovation and add to the price.
A fixed, itemised quote after a visit then turns the estimate into a price. For ideas on current styles, see our guide to kitchen renovation trends in Spain, and for the service itself, our kitchen renovation in Alicante page.
Where to save and where not to in a kitchen
Save on what you can change later without building work, and not on what ends up behind the units.
Where you can save:
- Keep the layout. The feeds are already where they need to be.
- Modular, off-the-shelf units with a bespoke module only where nothing standard fits.
- Laminate or compact worktop instead of stone; it can be swapped in a few years if you want.
- Microcement over the splashback tiles if they are sound: €70 to €120 per m², VAT not included, no rubble. See microcement in Alicante.
- Freestanding fridge and dishwasher instead of integrated.
- Tile only the splashback between worktop and wall units, and paint the rest with washable paint at €8 to €14 per m².
Where it does not pay to save:
- Services. A kitchen concentrates water, high-load electrics and sometimes gas; it is the room with the most circuits in the flat.
- Hardware. Cheap hinges and drawer runners are the first thing to fail.
- Extractor and ventilation. In Alicante, with open-plan kitchens and a long summer, an extractor that really extracts keeps smells and grease out of the whole flat.
- Fitting of the units. An experienced fitter levels, adjusts doors and finishes junctions; you see it in every drawer.
Renovating a kitchen in Alicante: local specifics
Kitchen renovations in Alicante have three local features: small closed kitchens in older flats, gas supplies being removed, and coastal apartments where the kitchen is renovated between seasons.
In the 1960s to 1980s flats of the city centre, the Ensanche, Carolinas or Benalúa, the kitchen is usually narrow, with a galería (a small utility balcony opening onto a light well) and tiles to the ceiling. The typical renovation is complete: new services, bespoke units to use the full width and, very often, opening to the living room or absorbing the galería. In these buildings we check the shared soil stack and inform the comunidad de propietarios before starting; a short note to the administrador with the dates and the declaración responsable is usually all it takes, and we prepare it.
In the apartments of Playa de San Juan, Albufereta, El Campello or Benidorm, the kitchen is usually renovated between September and May, when the apartment is empty. We prioritise materials that stand up to salt air and heavy rental use: compact worktops, easy-clean laminate doors and robust appliances. If the flat is a holiday let, a kitchen done in October is earning again by Easter.
In the villas of Mutxamel, Sant Joan, Busot or San Vicente, kitchens are large, sometimes with an island and a door to the terrace; there the budget goes to the upper band because of the metres of units and worktop, not because of the building work. See our villa renovation page if the kitchen is part of a bigger project.
Timeline: how long it takes and what delays it
A complete kitchen renovation takes 3 to 5 weeks: the building work takes the first two or three and the fitting of units, worktop and appliances the last. A quartz or porcelain worktop is templated once the units are fitted and made afterwards, so there are a few days when the kitchen is fitted but has no worktop; we put that in the schedule.
What delays a kitchen is units ordered late (manufacturers have their own lead times), integrated appliances that do not match the modules designed, and layout changes halfway through. That is why we close the design and the order before demolition. For owners abroad we agree the plan, the elevations and the appliance list by email or video call, then send photos as the services go in, the tiling goes up and the units are fitted, so you can check each stage against the drawings without being here.
Common mistakes
- Choosing the units after the building work has started. The water and electrical points depend on where the sink, hob and appliances go. Design first, then strip-out.
- Comparing quotes without separating building work from furniture. A low total can hide minimum-grade units or leave the appliances out.
- Not planning enough worktop sockets. Food processor, coffee machine, toaster and chargers: too few sockets is the most repeated complaint in new kitchens.
- Forgetting the ventilation of the galería or light well. If you close the galería, think about how to ventilate and where the washing machine goes.
- A marble worktop in a hard-working kitchen. It is beautiful, but lemon or wine stains it; for many families a compact or porcelain worktop is more practical.
- Switching to induction without checking the contracted power. An induction hob with the oven and the air conditioning running at once can trip the supply; it is calculated beforehand.
- Opening the kitchen to the living room without checking whether the wall is load-bearing. It is discovered when the wall is opened, and then the job stops while a project is commissioned.
- Saving on hardware and fitting. They are the part used a hundred times a day.
When to call a professional
You can paint, assemble modular units and fit accessories yourself; the plumbing, the high-load electrics, the gas and any demolition need a professional, and gas additionally needs an authorised installer.
If you are handy, a change of units without touching the services is within reach: dismantling, fitting level modules, plinths and handles. Painting the kitchen with washable paint and swapping a laminate worktop too. What you should not do without the trade is the electrical installation (the oven, hob and washing machine circuits have their own cable sizes and protection under the Spanish REBT regulations), the wastes (a badly made fall is a blockage every month), and the disconnection or modification of gas, which requires an authorised installer and a certificate. Knocking down a partition without knowing whether it is load-bearing is a risk that is not worth taking.
If you would rather we did it, we visit within 48 to 72 hours, measure the kitchen, check the services and give you a fixed itemised quote, free and without obligation, with building work and furniture shown separately, a written guarantee and a single English-speaking project manager who sends you updates. See our kitchen renovation in Alicante service or book your visit through contact.
Photos from our jobs
Frequently asked questions
How much does a complete kitchen renovation cost in Spain in 2026?
A complete kitchen renovation costs €7,000 to €18,000, VAT not included. With mid-range units and appliances, most flat kitchens land between €10,000 and €14,000. The upper end covers large kitchens opened to the living room, stone worktops and integrated appliances.
How much does a small 8 m² kitchen cost?
A small kitchen sits at the lower end of the range, from €7,000, VAT not included, because it has fewer metres of units and tiling. The water, gas and electrical work costs almost the same as in a large kitchen, which is why the price does not fall in proportion to the floor area.
What share of the budget goes on the units?
Units, worktop and appliances are usually the largest share of a kitchen budget, and the building work (strip-out, services, plastering, tiling and painting) the rest. That is why the grade of units and worktop moves the price more than any other decision.
How long does a kitchen renovation take?
A complete kitchen renovation takes 3 to 5 weeks: building work and services first, units and worktop at the end. Made-to-measure units and stone worktops have their own factory lead times, so they should be ordered before the strip-out starts, not after.
Can I renovate the kitchen without building work?
Yes, if the services are sound and the layout works for you. Replacing units, worktop and appliances, and cladding the splashback or applying microcement over the existing tiles (€70 to €120 per m², VAT not included) gives you a new kitchen without taking walls off. As soon as feeds need moving or pipes replacing, it becomes building work.
How much does it cost to open the kitchen to the living room?
It depends on whether the wall is load-bearing. If it is a simple partition, the demolition and making good is a moderate item; if it is a load-bearing wall you need a structural project from an architect or engineer, a steel beam and a licencia de obra mayor, and the cost rises sharply. We check this on the visit before quoting.
Does the 10% IVA rate apply to a kitchen renovation?
Yes, if you are a private individual, the property is more than two years old and the materials are no more than 40% of the taxable base. In kitchens this needs watching, because units, worktop and appliances weigh heavily; sometimes it makes sense to separate the supply of the furniture from the building work.
Can you renovate my kitchen while I am abroad?
Yes. The design, the units and the appliances are agreed on plans and by video call before the strip-out, your project manager sends photo updates at each stage, and your key holder gives access. The fixed itemised quote with building work and furniture shown separately is what makes this work at a distance.
What is the cost of a kitchen renovation in Spain?
A kitchen renovation in Alicante costs €7,000 to €18,000, VAT not included, and takes 3 to 5 weeks. With mid-range units and appliances most kitchens come to €10,000 to €14,000. The main factors are the size, the worktop, the appliances and whether plumbing and wiring change.
Can I get a kitchen renovation cost estimate before a visit?
You can get an orientative figure from the size of the kitchen, a photo, the worktop and appliance level and whether you are changing the layout. A fixed quote needs a visit or a video call, because the condition of pipes, walls and electrics cannot be judged from a photo.
Updated: