# Rewiring a house or flat in Alicante: consumer unit, earthing and certificate

Rewiring a home in Alicante means a new consumer unit with RCD protection, separate circuits, earthing, new cable and fittings, and an electrical certificate (the boletín) signed by an authorised installer. It is quoted as a fixed price after a visit; loose electrical work is €35 to €50 per hour, IVA not included.


## Rewiring a house in Spain: where to start

**Rewiring means replacing the consumer unit, cable and fittings with an installation that meets current regulations, and it is quoted as a fixed price after a visit.** If you are not sure what state yours is in, start with an inspection: not every home needs everything replaced.

This page covers full or partial rewiring of homes. For faults, small jobs and power increases, see our general page for an [electrician in Alicante](/en/electrician-alicante/). Many buyers of older Spanish properties land here after hearing "you will need a new electrical certificate" from an agent or a surveyor, so we explain what that certificate is further down.

## When rewiring makes sense

**Rewire as soon as you see signs of age or missing protection: fuses instead of breakers, no RCD, no earth, cloth or aluminium cable.**

The usual cases in Alicante and the surrounding towns:

- **Flats from the 1960s and 1970s** in Centro, Benalúa or Carolinas, wired for a fraction of today's appliances. They struggle with an oven, induction hob and air conditioning running together.
- **An old consumer unit.** Screw-in fuses or a single switch for everything. See our guide on [when to replace an old fuse box](/en/guides/old-consumer-unit-fuse-box-spain-when-to-replace/).
- **Aluminium or cloth-covered cable.** Both belong to older installations and deteriorate with age.
- **No earth.** Two-pin sockets are a risk to people, particularly in bathrooms and kitchens.
- **A holiday home that has been shut up for years.** Damp, salt air and long periods without use take their toll on old fittings.
- **A big renovation.** If walls are being opened anyway, closing them over old cable makes no sense.
- **New equipment.** Air conditioning, a heat pump or a charger may need dedicated circuits.

Warning signs not to ignore: breakers that trip, warm sockets, flickering lights, a smell of burning. If you smell burning, switch off the main switch and touch nothing.

## What a full rewire includes

**A complete rewire includes a new consumer unit, separate circuits, earthing, protections, fittings and the installation certificate.**

| Element | What is done |
|---|---|
| Consumer unit | New, with a breaker per circuit |
| RCDs | Protection against earth leakage and contact |
| Circuits | Separate for kitchen, bathrooms, air conditioning and general sockets |
| Earthing | Checked or installed, with every point connected |
| Cable | New, in conduit, correctly sized |
| Fittings | New sockets and switches |
| Certificate | Electrical installation certificate (boletín), signed by an authorised installer |

The number of circuits and points is agreed with you at the visit, based on how you use the property.

## The electrical certificate (boletín) explained

**In Spain, the electrical certificate is the boletín eléctrico: a document signed by an authorised installer confirming the installation meets the low-voltage regulations.** It is a different document from the energy performance certificate, which rates a property's energy efficiency and is covered on our [energy certificate page](/en/energy-certificate-alicante/).

You will normally meet the boletín in three situations: after new work or a rewire, when the electricity company asks for it to open a new supply or change the contracted power, and when buying an older property whose paperwork is out of date. Rules and what is asked for vary, so confirm the detail for your case with your gestor. What we can do is inspect the installation, quote any corrections and have the certificate issued when the work is finished. The full explanation is in our guide to the [boletín eléctrico and electrical certificate in Spain](/en/guides/boletin-electrico-electrical-certificate-spain/).

## What rewiring costs

**Rewiring is quoted as a fixed price after the visit; the range depends on the floor area, the number of points and the wall chasing, and we do not give a figure for a home we have not seen.**

What we do publish: an electrician by the hour at €35 to €50, IVA not included, for repairs and small jobs, and a full flat renovation at €450 to €900 per m² plus IVA, which already includes the electrical installation. For worked reference numbers, read our guide on the [cost of rewiring a flat in Spain](/en/guides/rewiring-a-flat-in-spain-cost/).

IVA on rewiring a private home is normally 10% when it is part of a renovation of a home more than two years old, and 21% for commercial premises. Factors that move the price: the number of points, whether cable can run through a false ceiling, whether every wall has to be chased and whether the contracted power is increased, which is a separate procedure covered in [increasing your electricity supply](/en/guides/increase-electricity-supply-power-spain/).

## Where it fits in a renovation

**The electrics go in after the layout is set and before walls and ceilings are closed, which avoids double chasing and saves time.**

1. **Strip-out and partitions.** The layout is fixed first, for example with [plasterboard](/en/plasterboard-pladur-alicante/).
2. **First fix.** Electrics and plumbing run their conduits and pipes.
3. **Testing.** Each circuit is tested with the walls still open.
4. **Closing and finishes.** Plastering, tiling, ceilings and paint.
5. **Fittings and certificate.** Sockets are fitted and the certificate is issued.

If it is part of a [full home renovation](/en/full-home-renovation-alicante/), the electrics are one phase of the programme.

## How we work

1. **Technical visit within 48 to 72 hours.** We check the unit, the earth, the contracted power and the state of the cable.
2. **Fixed itemised quote**, explained in English.
3. **Socket and light plan** agreed with you on a drawing, or by email if you are abroad.
4. **Works**, with photos of the open walls before they are closed.
5. **Handover** with the certificate, the paperwork and a written guarantee.

Interior rewiring is normally processed with the works through a declaración responsable or a licencia de obra menor, and we handle it. If it touches the shared riser or other common elements, we coordinate with the community of owners.

## Where we work

We rewire homes in Alicante and within 45 km, including [Elche](/en/renovations-elche/), [Benidorm](/en/renovations-benidorm/), San Vicente del Raspeig, El Campello and Santa Pola. See all [areas we cover](/en/areas/).

## Ask for a free quote

Tell us the age of the property, what you have noticed and whether you are buying, selling or living there. We visit within 48 to 72 hours and send a fixed-price quote at no cost. [Contact us](/en/contact/) to arrange the free visit.
