# Replacing windows without building work: what it is and when it is possible

Replacing windows without building work means fitting the new uPVC or aluminium window over the old frame, with no chasing or making good of walls, in a few hours per window. It is possible when the old frame is solid, is aluminium or timber in good condition, and losing a few centimetres of glass does not matter. A uPVC or thermally broken aluminium window costs €350 to €900 per unit, VAT not included, and a three-bedroom flat is done in one or two days.


## Replacing windows without building work: the short answer

**Replacing windows without building work means fitting the new window over the old frame, with no chasing and no repainting, in one to three hours per opening; it is possible when the old frame is solid and you accept losing a few centimetres of glass, and it costs €350 to €900 per uPVC or thermally broken aluminium window, VAT not included.** For a flat with six or seven windows, installation takes one or two days with the home occupied.

It is the most common way to renew windows in Alicante outside a full renovation, for a simple reason: most 1970s to 1990s flats in the centre, Playa de San Juan, Carolinas or Benalúa have single-glazed sliding aluminium windows on an aluminium or timber frame that is still solid. Using that frame avoids masonry, rubble, painting and days of building work, and keeps the home in use. For an owner who flies in for a week, or who has a tenant in place, that matters more than anything else.

In this guide we explain exactly what it involves, how it is done step by step, when it is not possible or not advisable, what to choose (material, opening type, glass, thermal break) and what changes in Alicante because of the sun, the salt air and the community of owners. Our price per window is the one published on our [renovation prices page](/en/renovation-prices-alicante/).

## Without building work versus with frame removal

**Fitting without building work uses the old frame and avoids masonry; full removal takes out the whole old frame and leaves a clean opening, but means making good and painting the walls.** The window itself costs the same either way; what changes is the work around it.

| | Without building work (over old frame) | With frame removal |
|---|---|---|
| Window price | €350 to €900 per unit, VAT not included | €350 to €900 per unit, VAT not included |
| Extra work | Finishing profiles; no masonry | Chasing out, removing the frame, bedding the new one, rendering, painting, sometimes a new sill and tiles |
| Time per window | 1 to 3 hours | Half a day to a day, plus drying and painting |
| Rubble | None (old sashes and glass are taken away) | Yes, frame and mortar debris |
| Light | 3 to 6 cm lost per side | Original opening kept |
| Weathertightness | Good if the old frame is solid and sealing is done well | The best: the new frame is bedded directly to the wall |
| Home occupied | Yes, no problem | Yes, with dust and disruption |
| When it suits | Solid old frame, generous opening, flat in use, no major renovation | Damaged frame, small openings, change of size, full renovation |

One important point: "without building work" does not mean "cheaper". The window costs the same; what you save is the masonry and painting, which on a flat with six windows can be a noticeable sum, and above all the days of disruption. The full breakdown, and the uPVC versus aluminium comparison, is in [uPVC vs aluminium windows: cost in Spain](/en/guides/upvc-vs-aluminium-windows-cost-spain/).

## How a window is replaced without building work, step by step

**The process has six steps: check the old frame, measure, choose the window, prepare the frame, fit and finish; the slow part is made-to-measure manufacture, not installation.** This is how we do it.

### 1. Check the old frame

This is the check that decides everything. The frame is pushed and tapped on all four sides: it has to be anchored to the wall with no movement. With aluminium, we look for deformed profiles and loose anchors; with timber, for soft or rotten areas, especially at the base where water collects. A solid frame is suitable; one that moves or crumbles means removal.

### 2. Measure

The inside of the old frame is measured at three points across and three points high, plus the depth available, because the new frame has to sit and line up with the roller shutter. The shutter box is also checked: it is often the moment to replace the strap, the axle or motorise it.

### 3. Choose material, opening type and glass

uPVC or thermally broken aluminium, side-hung, tilt-and-turn or sliding, and the right glass for the orientation. We go into detail below. Once the decisions are made, the window goes into manufacture, which usually takes several weeks. For owners abroad this is the stage done by email and video call; the fitting day itself needs only your key holder.

### 4. Prepare the old frame

On installation day the old sashes are taken off and the glass removed. The frame is cleaned, protruding profiles or tracks that get in the way are cut back with a grinder, level and plumb are checked and small differences are corrected with packers.

### 5. Fit the new window

The new frame is offered up inside the old one, levelled and screwed to the old frame (and, where it can be reached, to the wall). The perimeter joint is filled with low-expansion polyurethane foam and sealed outside and inside with neutral silicone or weatherproof tape. Sashes and glass are fitted and the hardware adjusted.

### 6. Finish and check

Cover trims or finishing profiles in the same material and colour are fitted over the old frame inside and out, so that it is not visible. Each sash is checked for closing, the frame drainage (the weep holes must be kept clear) and airtightness. The old sashes and glass are taken away. One to three hours per window.

## When it is not possible or not advisable

**It is not possible to fit without building work if the old frame is loose, rotten, rusted or deformed; and it is not advisable if the opening is small, if you want to change the size, or if you are in a full renovation where the walls are being chased anyway.** In those cases, installation with removal is the right approach and there is no point forcing the other.

- **Timber frame with rot at the base.** Common in older flats in the centre and in ground-floor properties. Screwing into soft timber holds nothing.
- **Rusted iron frame.** In 1950s and 1960s buildings there are still iron windows; the rust keeps advancing beneath the new window.
- **Deformed aluminium frame or loose anchors.** If it moves, it moves with the new window.
- **Small openings.** On 50 to 70 cm wide bathroom or kitchen windows, losing 6 to 12 cm in total leaves an opening too narrow to ventilate and light the room.
- **Change of size or type of opening.** Turning a window into a balcony door, enlarging an opening or joining two requires building work and, depending on the case, community permission and a licence.
- **Full renovation.** If walls are being chased, floors changed and everything painted, there is no sense keeping the old frame: it comes out and the window is bedded to the wall, with the best weathertightness. Within a [full home renovation](/en/full-home-renovation-alicante/), the windows go in the itemised quote.
- **Damp problems at the sill or in the wall beneath the window.** If water is getting in where the old frame meets the wall, covering it with a new window does not solve it. Repair it first.

A common intermediate case: a solid frame but with a broken external drip or loose sill tiles. The window can be fitted without building work and the sill repaired outside with an aluminium profile, which is a small finishing detail, not a building job.

## What to choose: material, opening type, glass and thermal break

**In Alicante, the choice that most affects comfort is the glass and the thermal break; the material (uPVC or aluminium) is decided by salt air, looks and what the community requires; the opening type by how each room is used.** The four criteria in order of importance.

### Thermal break

In aluminium, the thermal break is a polyamide strip that separates the outer profile from the inner one and stops heat passing through the metal. Without it, the frame sits almost at the outside temperature: it streams with condensation in winter (see [condensation on windows: solutions](/en/guides/condensation-on-windows-spain-solutions/)) and heats up in summer. Today there is no sense fitting aluminium without a thermal break in a home. uPVC does not need one because the material insulates by itself. Spanish quotes abbreviate it as RPT (rotura de puente térmico); if a quote for aluminium does not mention it, ask.

### Glass

Double glazing with a cavity (for example 4/16/4) as a minimum. On south and west facades, which in Alicante take the afternoon sun in summer, solar-control glass cuts the heat coming in and the air conditioning bill; on north facades, a low-emissivity coating keeps heat in during winter. In noisy areas (the centre, avenues, near railway lines), acoustic laminated glass in one of the panes makes the difference. If you are used to British triple glazing, note that the priority here is reversed: keeping heat out matters more than keeping it in.

### uPVC or aluminium

uPVC insulates more through the profile, does not corrode in salt air and usually costs slightly less for the same performance; it is the usual choice in Playa de San Juan, Cabo de las Huertas, El Campello, Santa Pola, Guardamar or Torrevieja. Thermally broken aluminium allows slimmer profiles, larger sashes and colours that match the facade; it is common for balcony doors and in communities that require a specific look. Both, well fitted, work. Both fall within the range of €350 to €900 per unit, VAT not included, depending on size and glass.

### Opening type

Side-hung or tilt-and-turn in bedrooms and bathrooms (they close better and insulate more); sliding on balconies and in living rooms where a swinging sash gets in the way. Conventional sliders close less tightly than hinged windows; lift-and-slide or perimeter-locking sliders solve that at a higher price. In small kitchen openings, a tilt-and-turn lets you ventilate without opening fully. Tilt-and-turn is the type most British owners have never used and most come to prefer.

## Alicante specifics: sun, salt air and the community

**Three things change the decision in Alicante: the western sun in summer, the salt air on the coast and the facade as a common element of the community of owners.** All three are resolved before ordering the windows.

**Sun.** In flats with a west-facing facade in the centre, Carolinas, Garbinet or PAU 5, the window takes direct sun in the hottest hours of the day. Solar-control glass and a thermally broken profile greatly reduce what gets in; combined with a roller shutter in good condition, they are the most cost-effective comfort improvement in the flat. If you are also changing the air conditioning, see [air conditioning installation cost in Alicante](/en/guides/air-conditioning-installation-cost-alicante/): with new windows, the unit works less.

**Salt air.** Within a kilometre of the sea, untreated aluminium and unprotected steel hardware pit within a few years. uPVC or quality powder-coated aluminium, stainless hardware and an occasional rinse with fresh water extend the life of the window. On the front line in Albufereta, Playa de San Juan, Santa Pola or Torrevieja, it is the main criterion.

**Community.** The facade is a common element: the colour and type of profile visible from the street may be regulated by the community statutes or by meeting resolutions, and Spain's Horizontal Property Law protects the uniformity of the exterior. Before ordering windows, ask the administrador (the block's managing agent) what has been approved; many communities have a reference colour and model. We explain it in [community of owners permission for renovations in Spain](/en/guides/community-of-owners-permission-renovation-spain/).

**Licence.** Replacing windows with others of the same size does not usually require a works licence; some town halls ask for a notification or declaración responsable, especially where the facade is affected. We check with the relevant town hall (Alicante, Elche, San Vicente, El Campello, Santa Pola) and handle it.

## Common mistakes

- **Fitting over a frame that moves.** The new window inherits the movement, whistles in the wind and lets water in. Check first.
- **Not looking at how much light is lost.** In bathroom and kitchen openings, the 6 to 12 cm lost turn the window into a porthole.
- **Choosing aluminium without a thermal break to save money.** Condensation in winter and a burning frame in summer; the saving goes on air conditioning.
- **Fitting basic double glazing on a west facade.** Without solar control, the new window insulates against noise but the afternoon heat keeps coming in.
- **Forgetting the roller shutter box.** It is the point where most air gets into an old flat; with the new window, it is insulated or replaced.
- **Not sealing outside.** Foam without exterior silicone degrades in the sun and water comes in through the joint in the first autumn storm.
- **Blocking the frame drainage with sealant or trim.** Water that gets into the frame cannot get out and ends up inside.
- **Ordering the windows without consulting the community.** If the colour is not the approved one, you may have to change them.

## When to call a professional

**Changing windows is not a do-it-yourself job, even without building work: the result depends on measuring, levelling, fixing and sealing correctly, and a badly fitted window lets in air, water and noise for years.** What you can do is decide well and check the work.

You can check the condition of your frames with the checks in this guide, measure the openings roughly to ask for an indicative quote, decide orientation by orientation which glass you want, and ask the community about the approved colour. After installation, check that each sash closes without forcing, that the exterior seal is complete and that the frame drainage is clear.

What needs an installer: the final survey (a made-to-measure window measured wrongly cannot be fixed), cutting back the old profiles, fixing and sealing, adjusting the hardware and taking away the old sashes and glass. If the old frame is not solid, also the masonry of removal and bedding. And if the window changes size, the paperwork with the community and the town hall, which we handle.

If you want to know whether your windows can be replaced without building work, we visit within 48 to 72 hours in Alicante and the surrounding area, check the frames opening by opening, measure and give you a fixed quote per unit, free and without obligation, with a written guarantee on the installation and an English-speaking project manager who deals with your community. Book your visit through [contact](/en/contact/), or see how windows fit into a [full home renovation in Alicante](/en/full-home-renovation-alicante/).