# Renovation guarantee in Spain: what it covers and how long it lasts

A renovation guarantee in Spain has three layers: the contractual guarantee the company gives you in writing on its own work, the manufacturer's guarantee on each material and, for works with an architect's project, the legal building liability periods, which in general run for 1, 3 and 10 years depending on the type of defect. What you can enforce directly is what is written in your contract: that is why a written guarantee on the work is the first thing to ask for.


## The three layers of a renovation guarantee

**A renovation guarantee in Spain is made up of the contractual guarantee the company gives you in writing, the manufacturer's guarantee on each material and, when the work has an architect's project, the legal building liability periods; what you can claim directly and immediately is what appears in your contract.** Mixing up the three layers is the cause of most misunderstandings about "how long the guarantee lasts", and British and Irish owners often arrive with assumptions from home (a ten-year structural warranty on new builds, a trade body's insurance-backed guarantee) that do not map onto how it works here.

An example that comes up often in Alicante: a bathroom renovation in a 1970s flat in Carolinas. A year later a stain appears on the ceiling of the neighbour below. Who is liable? If the cause is a waste connection the company got wrong, it is a workmanship defect covered by its contractual guarantee. If the cause is a faulty seal in the tap, it is the manufacturer's guarantee, which the company handles if it supplied the tap. If the cause is the communal soil stack, which nobody touched, it is not the renovation's problem but the community of owners' and its insurer's. And the legal building liability periods, with their 1, 3 and 10 years, in general do not come into play because that renovation had no project.

This guide explains each layer in general terms, without turning into legal advice. If you have a specific dispute, the guide will help you put the facts in order, but the formal claim is best prepared with a professional, ideally one who works in both languages.

## Table: types of guarantee, what they cover and how long they last

**Each type of guarantee has a different scope and duration, and it pays to know which one to turn to for each defect.** This table summarises them in general terms.

| Type of guarantee | What it covers | Duration | Who you claim against |
|---|---|---|---|
| The company's contractual guarantee | Workmanship defects in the work carried out | Whatever the signed contract or quote says | The renovation company, in writing |
| Manufacturer's guarantee (materials) | Product defects: sanitaryware, taps, screens, air conditioning, windows, appliances | Whatever each manufacturer sets | The manufacturer or distributor; if the company supplied it, through the company |
| Statutory consumer guarantee (goods) | Lack of conformity of products sold to a consumer | As set by current consumer law | The seller |
| Building liability (LOE) | In works with a project: in general, 1 year finishes, 3 years habitability and services, 10 years structure | Legal periods from handover | The parties to the works (builder, architects, developer) |
| The company's public liability insurance | Damage caused to third parties or to your home during the works | While the policy is in force | The company, which activates its insurer |

The important point in the table: only the first row depends on what you negotiate and sign. The others exist or not according to the type of work and the product. That is why, when comparing companies, the written guarantee weighs so heavily; the guide [how to read and compare a Spanish renovation quote](/en/guides/how-to-read-and-compare-a-spanish-renovation-quote/) covers where to look for it.

## The contractual guarantee: the one you can enforce

**The contractual guarantee is the company's written commitment to repair, at its own cost, workmanship defects in the work it has done, for a set period from handover; its value depends on it being in writing and defining scope, duration and procedure.** "Full guarantee" with nothing more is not a guarantee: it is a phrase.

What a good guarantee clause should say:

- **Scope**: which work it covers. The reasonable position is that it covers all the company's own execution: new plumbing and electrical installations, wall and floor tiling, plasterboard and partitions, waterproofing and watertightness of shower trays, fitted joinery, painting.
- **Duration**: a specific period, from the date of the handover certificate (acta de recepción). The longer the better, but a clear period that is honoured is worth more than a very long verbal one.
- **Exclusions**: normal wear, misuse, lack of maintenance, damage by third parties, materials supplied by the client, later modifications by others.
- **Procedure**: how you notify (email is the most practical, and the easiest from abroad), how quickly they come out and how the repair is done.
- **Coordination with materials**: if the company supplied the material, it handles the manufacturer's guarantee; if you supplied it, it is responsible only for the installation.

At Costa Renova the written guarantee on the work is one of our commitments and forms part of the fixed itemised quote you sign. We say this so you can check it, not as a slogan.

### What it usually covers and what it does not, with examples

Covered by the workmanship guarantee, in general:

- A leak at a new plumbing joint.
- Tiles that come away or sound hollow through poor adhesion.
- A shower tray that leaks because of a bad seal or badly done waterproofing.
- Cracks in badly taped plasterboard joints.
- Fitted doors that do not close because of a faulty adjustment.
- A new electrical circuit that trips because of an installation defect.

Not covered, in general:

- A tap that drips from a worn cartridge after some years: normal use and, if anything, the manufacturer.
- Blackened silicone joints through lack of ventilation: maintenance.
- Rising damp that already existed and was not part of the renovation.
- A window scratched by aggressive cleaning.
- Damage from a DANA storm on a terrace the renovation did not touch.

## The legal liabilities: the LOE and its periods, in general terms

**The Ley de Ordenación de la Edificación sets the liabilities of the parties to a building project for material damage, with periods that in general are 1 year for finishes, 3 years for habitability and services and 10 years for structure; it applies to new builds and to interventions with a project, not automatically to a bathroom or flat renovation without one.** This is where there is most confusion.

What you often hear, "every renovation has a ten-year guarantee", is not accurate. Those periods belong to a liability regime designed for building with a project and technical supervision: new builds, full rehabilitations, extensions, changes of use. In those works, the parties (developer, builder, architect, technical architect) are in general liable for damage that appears within those periods, counted from handover, according to the type of damage:

- **Defects of finish or completion**, in general, 1 year.
- **Damage affecting habitability** (watertightness, services, insulation), in general, 3 years.
- **Structural damage** (foundations, beams, slabs, load-bearing walls), in general, 10 years.

In a renovation without a project (most bathrooms, kitchens and flat renovations handled by declaración responsable or a minor works licence), that regime is not the main framework. What governs is the contract, general contract law and, when you contract as a consumer, consumer law. That does not mean you have no rights: it means your main tool is what you signed. Hence the insistence on the written guarantee.

If your work does carry a project (opening a load-bearing wall, converting a commercial unit into a home, rehabilitating a house), then as well as the contractual guarantee you have that legal framework and a supervising architect who certifies the work. The guide [when a major works licence is needed in Spain](/en/guides/major-works-licence-spain-when-needed/) explains which works go that route.

## The guarantee on materials

**Each material carries its manufacturer's or distributor's guarantee, with its own period and conditions; the renovation company is responsible for the installation, and handles the product guarantee only if it supplied the product.** Keeping invoices and references is what lets you claim it.

Some materials and what is worth knowing:

- **Sanitaryware and taps**: manufacturer's guarantee, often different for the body and for wearing parts (cartridges, hoses). Keep the model reference.
- **Shower screens**: glass, profiles and anti-limescale treatments have different conditions. A screen in Playa de San Juan or Santa Pola suffers more from salt air and limescale; cleaning is maintenance, not guarantee.
- **Air conditioning and aerotermia heat pumps**: the manufacturer normally requires installation by a qualified installer and, sometimes, documented periodic servicing to keep the guarantee. If you have it installed by an unqualified friend, you can lose it.
- **uPVC and aluminium windows**: separate guarantees for profiles, hardware and glass. Gaskets and hardware adjustment are maintenance.
- **Appliances**: the seller's consumer guarantee and, sometimes, a manufacturer's extension. Appliances bought in the UK and shipped over are a known headache: the guarantee may not be honoured in Spain.
- **Floor and wall tiles**: a product defect (shade, flatness, calibre) is claimed before laying; once laid, the manufacturer rarely accepts it. That is why the material is checked on delivery.

If you buy the materials yourself to save money, you take on that management, which is hard to do from abroad.

## How to claim under the guarantee step by step

**To claim under the guarantee, notify in writing with dated photos, ask for a visit, document every step and, if the company does not respond, send a formal demand and go to the consumer office or the courts with the contract, invoices and correspondence as evidence.** Most issues are resolved at the first step when the company is serious.

1. **Detect and document.** Dated photos, a description of the defect, when it appeared. If there is water, close the relevant stopcock and avoid making the damage worse. If you are abroad, your key holder or agent takes the photos; keep them in one email thread.
2. **Notify in writing.** Email to the company, with the photos and a reference to the contract. Avoid the only communication being a phone call.
3. **Visit and diagnosis.** The company comes out, identifies the cause and tells you whether it is a workmanship defect, a material defect or an outside cause. Ask for that assessment in writing.
4. **Repair.** Under guarantee, at the company's cost, within a reasonable time. If third parties are affected (the neighbour below), the company activates its public liability insurance.
5. **If it does not respond:** a formal demand (burofax, the Spanish recorded-delivery letter, or another method that leaves a record), a complaint to the consumer office and, as a last resort, legal action. For that you will need the contract, the invoices, the handover certificate, the photos and the correspondence; without an invoice, claiming is very difficult. Paying "sin IVA" in cash to save the tax leaves you with no evidence of the contract at all.

One piece of advice: report it even if the defect seems small. A silicone joint opening up on a shower tray is a warning of a bigger problem if left; repaired in time, it goes no further. The guide [bathroom renovation mistakes](/en/guides/bathroom-renovation-mistakes/) collects the defects that generate the most claims.

## Particular features of Alicante: salt air, DANA storms and communities of owners

**On the Costa Blanca there are three factors that blur the line between guarantee, maintenance and outside cause: corrosion from salt air in homes by the sea, the torrential rain of DANA storms and the communal elements of a community of owners.** It is worth knowing them before claiming, or before accepting that "it is not covered".

- **Salt air**: on the front line of the Albufereta, Cabo de las Huertas, El Campello or Santa Pola, hardware, taps and screens deteriorate sooner. It is accelerated wear caused by the environment, not a workmanship defect, and manufacturers usually exclude it. Choosing materials suited to a marine environment from the design stage avoids the argument.
- **DANA storms**: a leak after torrential rain may come from a terrace or roof the renovation did not touch. If the renovation did include waterproofing, it is work covered by the guarantee; if not, it is a matter for your home insurance or the community's.
- **Communities of owners**: soil stacks, facades, roofs and lightwells are communal elements. Damage that comes from there is not the responsibility of the company that renovated your bathroom, even if it shows up in your bathroom. Diagnosing the cause is what decides who to claim against, and in a Spanish block that conversation goes through the administrador (the managing agent).

## Common mistakes

- **Assuming every renovation has a 10-year legal guarantee.** Those periods belong in general to works with a project. For a bathroom or flat renovation, what counts is your contract.
- **Accepting a verbal guarantee.** If it is not written down, you cannot enforce it.
- **Not having a handover certificate.** Without a handover date, nobody knows when the guarantee runs from or whether a defect was already there at handover.
- **Working without an invoice.** Without an invoice there is no evidence of the contract and no real possibility of claiming.
- **Claiming by phone and not in writing.** Without a written trail, the claim goes nowhere.
- **Confusing maintenance with guarantee.** Silicone, limescale on taps, window gaskets, air conditioning filters are the owner's maintenance.
- **Buying materials yourself without taking on their guarantee.** You save a little and lose the manufacturer's support.
- **Letting a small defect go.** What is a snag under guarantee today may, in a year, be damage that no longer is.

## When to call a professional

**If a defect appears after the renovation, the first professional to call is the company that did the work, in writing and with photos; if the cause is unclear or the company does not respond, an independent technical architect or surveyor can determine the origin of the damage, and a lawyer or the consumer office can advise on the claim.** Do not have another company repair it before leaving a record, because you lose the evidence.

There are three situations where a professional diagnosis is essential:

- **Damp**: telling a leak from the renovation apart from a communal stack, a leak from the neighbour, condensation or rising damp takes experience. Our [damp treatment in Alicante](/en/damp-treatment-alicante/) service does the diagnosis free and tells you where the water comes from before anyone talks about who is liable.
- **Cracks**: a crack in plasterboard is a snag; a crack in a load-bearing wall after building work is a serious technical matter.
- **Electrical installations**: if breakers trip after the renovation, an authorised electrician must check and, if it is a workmanship defect, correct it under guarantee.

At Costa Renova the written guarantee on the work forms part of our fixed itemised quote, and the single project manager who accompanies you from start to finish is the person who deals with any issue afterwards, in English, whether you are in Alicante or at home in the UK. If you are about to renovate and want to know exactly what guarantee you will have before signing, book the free technical visit for your [bathroom renovation in Alicante](/en/bathroom-renovation-alicante/), a [full home renovation](/en/full-home-renovation-alicante/) or any other project through [contact](/en/contact/): you get the fixed quote with the written guarantee, without obligation.