# Microcement vs tiles: which to choose for your bathroom or kitchen

Microcement costs €70 to €120 per m², VAT not included, applied over the existing tiles, so nothing has to be chiselled off; porcelain tiles need demolition and retiling but take knocks better and can be repaired piece by piece. If your tiling is sound and you want a quick refresh, microcement wins; if you are moving pipework or sanitaryware, tiles usually make more sense.


## Microcement vs tiles: the short answer

**If the tiling in your bathroom or kitchen is sound and you are not moving any pipework, microcement is the quicker, cleaner option: €70 to €120 per m², VAT not included, no demolition, primer and sealer included. If you are replacing pipes, moving the toilet, dealing with damp or want the toughest surface against knocks, porcelain tiles are worth the demolition, and the complete bathroom then falls within the €5,500 to €12,000 range.**

The "microcement or tiles" question nearly always comes up at the same moment. You have bought or inherited a flat on the Costa Blanca with a bathroom or kitchen from the 1970s, 80s or 90s, the tiles are intact but dated, and you are not sure whether it is worth chiselling everything off. This guide gives you the criteria to decide without relying on whoever happens to be selling you one material or the other, with the figures we use in Alicante and the details that make the difference on site.

One thing worth getting clear first: this is not purely an aesthetic choice. It is a choice about how much building work you want, what is behind the walls, and how the room will be used over the next fifteen years.

## Quick comparison: microcement against tiles

**The table sums up what genuinely changes between the two systems: price, building work, toughness, upkeep and repairs.**

| Criterion | Microcement | Tiles / porcelain |
|---|---|---|
| Price of the finish | €70 to €120 per m², VAT not included, with primer and sealer | Material varies widely by format and brand; plus demolition, rendering and tiling labour |
| Building work | None if the base is sound; very little rubble | Demolition, rubble removal, preparing the wall, tiling |
| Time in a bathroom | Usually under a week, including drying | Full bathroom renovation: 2-3 weeks |
| Look | Seamless, no grout lines, colour made to order | Visible grout lines; huge range of formats and finishes |
| Impact resistance | Medium; a hard knock can mark it | High with porcelain |
| Water resistance | Good with a wet-area system and correct sealing | Very good; grout is the weak point |
| Upkeep | Neutral soap; renew the sealer in high-wear areas over the years | Normal cleaning; grout can darken |
| Repairs | Patches show; sometimes a whole panel is redone | The damaged tile is replaced |
| Added height | A few millimetres; doors rarely need trimming | Laid over an existing floor, it may mean trimming doors |
| Depends on the applicator | Heavily | Less so, though a good tiler still shows |

You can read how and where we apply it on our [microcement in Alicante](/en/microcement-alicante/) page.

## What actually drives the decision

**Four things decide between microcement and tiles: the condition of the base, whether you are touching pipework, how the room is used, and the look you want.** Let us take them one at a time.

### The condition of the base

Microcement is only a good idea if there is firmly bonded tiling underneath. Before recommending it we tap every tile: those that sound hollow are re-fixed or replaced, and if there are many of them the saving disappears. Original tiling in a 1960s-80s flat in the Centro, Benalúa or Carolinas that has stayed put for fifty years is an excellent base. Tiling with loose pieces, cracks that follow the line of a pipe, or bulging near the floor is a sign that something behind it needs fixing first.

The same goes for damp. Applying microcement over a wall with rising damp or a leak is covering a problem with an expensive material. If you can see stains, white salts or flaking paint, read the guide on [rising damp in Spain](/en/guides/rising-damp-in-spain-what-to-do/) first and deal with the cause.

### Whether you are touching pipework

This is the point many people miss until they see the quote. If you are replacing the lead or iron pipes in an older flat, moving the toilet, bringing a water supply to a new position or relocating the basin, channels have to be cut into the wall. At that point you are already demolishing, and the main argument for microcement (no demolition) no longer applies. With the wall open, retiling makes complete sense and gives you the toughest finish.

That is why, in bathrooms in 1960s-80s flats where the plumbing needs renewing, we usually recommend tiles or porcelain, and keep microcement for bathrooms where the services are recent or in good condition. If you are unsure about your pipes, the guide on [replacing lead or iron pipes](/en/guides/replacing-lead-or-iron-pipes-spain/) will help you find out.

### How the room is used

A family bathroom in daily use, a kitchen where people actually cook, and a holiday rental that passes through dozens of hands a year all demand more toughness than a guest cloakroom or a bedroom. Porcelain shrugs off a dropped pan, a chair leg or a suitcase, and if a tile does break it is swapped without a trace.

That does not rule out microcement in those rooms: applied and sealed well, it stands up to years of use. But you should know that repairs show more, and that in the highest-wear spots (the shower floor, in front of the worktop) the sealer will need renewing at some point.

### The look

If you want a seamless surface with no grout lines, an exact colour and the look of polished concrete or soft stone, only microcement gives you that. If you want large-format porcelain with minimal joints, a handmade tile with relief or a patterned encaustic-style tile, only tiles give you that. There are porcelain tiles that imitate concrete very convincingly, but the grout lines are still there.

Combining the two is often the best answer: microcement on walls and floor with porcelain inside the shower, or a decorative tiled panel behind the basin with everything else in microcement.

## What each option costs in an Alicante bathroom

**Microcement costs €70 to €120 per m², VAT not included, and a full bathroom renovation with new tiling costs €5,500 to €12,000, VAT not included, for a bathroom of 4 to 6 m².**

To compare sensibly, think in real square metres. A 5 m² bathroom has around 25-30 m² of wall and floor surface. With microcement, the finish alone comes to roughly €1,750 to €3,600, VAT not included, with no demolition or rubble. If you also replace the vanity unit and taps and fit a shower tray, each item is added on top.

With tiles, it makes no sense to look at the material price alone. To the cost of a porcelain tile you add chiselling off the old tiling, carrying the rubble down (often without a lift that can take it), rendering or levelling the wall, tiling, grouting and the time on site. That is why a full bathroom with new tiling sits in the €5,500 to €12,000 range, VAT not included. You will find the itemised breakdown on our [bathroom renovation in Alicante](/en/bathroom-renovation-alicante/) page and the [renovation prices in Alicante](/en/renovation-prices-alicante/) page.

Two details that change the outcome:

- **If you are demolishing anyway** because of the pipework, the saving microcement offers on demolition disappears and the comparison is purely between finishes.
- **If you are a private owner and the property is more than two years old**, the work may qualify for the reduced 10% VAT rate when materials are under 40% of the taxable base. This applies to both options.

In a kitchen the logic is the same. Microcement performs very well on the splashback and the floor; on the worktop it is possible but more sensitive to knocks, direct heat and stains than quartz or porcelain. For the full breakdown of kitchen costs, see [kitchen renovation in Alicante](/en/kitchen-renovation-alicante/).

## The microcement advantages that genuinely matter

**The real advantage of microcement is not the look: it is that it renews a bathroom or kitchen without demolition, with little rubble and in fewer days.**

- **No chiselling** if the tiling is firm. In a block with a small lift, no goods hoist and neighbours who are sensitive to noise, this counts for a lot.
- **Barely any added height**: a few millimetres. Porcelain laid over an old floor can force you to trim doors and leaves a step at the hallway.
- **Seamless surface**: no grout lines to collect dirt and no grout to darken.
- **Colour to order**: you can pick an exact tone for walls and floor so the whole room reads as one piece.
- **Short programme**: in a bathroom, preparation, coats and drying usually fit within a week.

For an owner with an apartment on Playa de San Juan, the Albufereta or the El Campello coast who wants to refresh it between lettings, or who is managing the job from the UK or Ireland, this combination of speed and minimal disruption is usually what tips the balance.

## The tile advantages that genuinely matter

**Tiles and porcelain remain the benchmark for toughness, ease of repair and variety.**

- **Takes knocks and scratches** better than any seamless coating.
- **Repaired by the piece**: keep a spare box and in ten years you swap a broken tile without anyone noticing.
- **Less dependent on the installer**: a competent tiler guarantees a stable result; with microcement, the applicator is everything.
- **Variety**: large formats, small pieces, relief, patterned, wood and stone effects.
- **No special maintenance**: there is no sealer to renew.

And one indirect advantage: if you are opening the walls anyway to replace the plumbing, the building work is already done, and tiling is the natural way to close it up.

## Typical cases in Alicante and what we tend to recommend

**In practice, the recommendation comes from combining the state of the property with the goal of the renovation.**

| Situation | What we usually recommend | Why |
|---|---|---|
| 1980s bathroom with intact tiles, pipes replaced years ago | Microcement | Sound base, no heavy work, complete change of look |
| 1960s-70s bathroom with iron or lead pipes | Tiles or porcelain | Walls must be opened for the plumbing; retile while you are at it |
| Holiday rental refreshed between seasons | Microcement, with porcelain in the shower | Speed and little disruption; toughness where it gets most use |
| Bath to shower swap without touching the rest | Partial retiling or microcement in the shower zone | Work only where it is needed |
| Kitchen opened to the living room with one continuous floor | Microcement floor | A single surface with no cuts or steps |
| Property with damp in the bathroom | Treat the damp first, then decide | No finish survives on a wet wall |

When you swap a bath for a shower tray without renovating the whole bathroom, whether to retile the zone or apply microcement is something we decide on the visit; you will find the details on [bath to shower conversion in Alicante](/en/bath-to-shower-conversion-alicante/) and in the guide on [how to choose a shower tray](/en/guides/how-to-choose-a-shower-tray/).

## How microcement is applied over tiles

**A well-executed microcement job over tiles has five stages, and skipping any of them is paid for later in cracks or grout lines showing through.**

1. **Checking the base**: tapping every tile, re-fixing or replacing hollow ones, checking for damp.
2. **Cleaning and degreasing**, especially in kitchens, where built-up grease stops the coating bonding.
3. **Bonding primer and mesh** where needed, to spread stresses and stop the grout lines telegraphing through.
4. **Microcement coats**: a thicker base coat and one or two finish coats, respecting the drying time between coats and sanding between them.
5. **Sealing** with a sealer suited to the use (bathroom, shower, floor with foot traffic), which is what gives the water and stain resistance.

In the shower the critical points are the corners, the junction with the tray and the pipe penetrations. If the applicator does not mention these areas, be wary.

## Common mistakes

- **Applying microcement over tiling with hollow pieces.** The tiles move, the microcement cracks along the grout lines, and the repair means redoing the whole panel.
- **Choosing microcement to avoid building work when the pipes need replacing.** You end up demolishing anyway and paying for a finish that has lost its main advantage.
- **Using a generic microcement in the shower.** Wet areas need a specific system and correct sealing; otherwise water gets in through hairline cracks and the finish lifts.
- **Not respecting drying times between coats.** Rushed to hand over, microcement cracks or marks. It is a job of days, not hours.
- **Forgetting the extractor fan in a windowless bathroom.** Constant condensation punishes any finish, especially in inward-facing flats; the guide on [condensation and mould on walls](/en/guides/condensation-and-mould-on-walls-spain/) explains why.
- **Comparing only the tile material price with the microcement price per m².** Tiles need demolition, preparation and laying; either you compare complete jobs or the comparison misleads you.
- **Not keeping spare tiles.** It is tiling's main advantage, and plenty of people throw it away by not keeping a box.
- **Cleaning microcement with concentrated bleach or a scouring pad.** It wears away the sealer and the finish loses its protection against water.

## When to call a professional

**Tiling a small splashback or replacing a few loose tiles is something a handy owner can do; applying microcement in a bathroom or tiling a full bathroom are jobs for a professional.**

Microcement is a system of thin coats where surface preparation, thickness, drying times and sealing decide the result. It is not a product to try at home: a poor application is not fixed with another coat, it is chiselled off and started again. Always ask to see the applicator's previous work and ask which system they use in wet areas.

With tiles, a complete bathroom retile involves demolition, rubble removal, possibly plumbing and electrics, and a wall preparation that determines whether the tiles end up level. If services are touched at the same time, regulations and safety come into play: bathroom electrics have specific rules on distance from the shower, and plumbing done badly is tomorrow's leak into the flat below.

On permits: coating over an existing surface is a simple interior job, but a bathroom or kitchen renovation with demolition and new services is normally processed in Alicante through a declaración responsable or a minor works licence (licencia de obra menor) at the town hall. We handle that paperwork for you, which matters if you are not in Spain to queue at the Ayuntamiento yourself.

If you want to get it right, the best thing is to have someone look at the bathroom before you decide. We visit free of charge within 48-72 hours, check the state of the tiling and the services, and give you a fixed itemised quote, with both options if it makes sense, so you can compare real numbers. Start at [bathroom renovation in Alicante](/en/bathroom-renovation-alicante/) or get in touch through our [contact page](/en/contact/).