# Loose floor tiles or a hollow-sounding floor: causes and solution

A floor that sounds hollow means the tile has come away from the mortar or adhesive underneath, usually through poor bonding when it was laid, through expansion with no movement joints or through damp below. If the tile does not move and is not cracked, it can be left and watched; if it moves, has lifted or several are affected, the area has to be lifted and re-laid, or resin injected in isolated cases. It is a building job that we quote item by item after the visit; small repairs are done by our partner [Manitas Costa](https://manitascosta.es/en/).


## A floor that sounds hollow: the short answer

**A floor that sounds hollow has tiles that have come away from their mortar or adhesive. If the tiles are fixed and whole, it can be watched; if they move, lift or have damp underneath, the affected area has to be lifted and re-laid on a clean base, with the right adhesive and with movement joints.** Resin injection solves isolated loose tiles, but not a whole floor.

It is one of the most frequent problems in Alicante flats: 1960s to 1980s terrazzo or stoneware floors laid in mortar that loses its bond over the years, 1990s and 2000s floors laid tight with no joints that lift in summer, and terraces and ground floors where damp does the rest. For owners who visit a few times a year it has a particular pattern: you arrive in August to find a ridge of tiles standing proud in the hallway that was flat at Easter. This guide explains how to detect hollow tiles, what causes each case, when watching is enough, when to inject and when to lift, and how to re-lay properly so it does not happen again.

A note on terms: the floors in older Spanish flats are very often terrazo, a polished cement-and-marble-chip tile laid in a mortar bed, which British visitors sometimes mistake for stone. It is durable, it can be re-polished, and it is also the floor most prone to going hollow with age.

## Causes of loose tiles: quick table

**Each cause leaves a different clue: where the hollow tiles are, when the problem appeared and what is underneath.**

| Cause | How to recognise it | Where it is typical | Solution |
|---|---|---|---|
| Laid without back-buttering or with too little adhesive | Scattered hollow tiles from shortly after the job, hollow only under part of the tile | Rushed renovations, large format | Lift and re-lay with back-buttering |
| Dirty, dusty or unprimed base | Hollow tiles spread across the whole room | New builds and renovations | Lift, clean or prime, re-lay |
| Expansion with no joints | Tented or lifted area in a ridge, appears in summer, sometimes with a noise | Flats with the floor tight to the walls, sun-exposed terraces | Lift the area, create perimeter and intermediate joints, re-lay |
| Exhausted old mortar | 40 to 60 year old terrazzo or stoneware floors, hollows spreading slowly | 1960s to 1980s flats | Re-lay areas or replace the floor |
| Rising damp or seepage | White salts in the joints, crumbling mortar, tiles loosening in damp areas | Ground floors, terraces, next to bathrooms | Treat the damp and rebuild the floor |
| Base that moves | Hollows along a crack or a line, uneven floor | Cracked screeds, slabs with deflection | Repair the base before re-laying |
| Thin or poorly cured screed | Extensive hollows, the screed crumbles when lifted | Renovations with thin screeds | Rebuild the screed |

## How to check the floor step by step

**With a screwdriver, masking tape and ten minutes you will know how many tiles are hollow and whether the problem is local or general.** If you are not in Spain, this is a check your key holder or cleaner can do and photograph for you.

### 1. Locate the hollow tiles

Walk the room tapping each tile gently with your knuckles or the handle of a screwdriver. A well-bonded tile sounds dry and solid; a hollow one deeper and resonant, like a drum. Mark each hollow tile with a piece of masking tape. Note whether the hollow is under the whole tile or only part of it (typical of laying without back-buttering) and whether the hollow tiles form a patch or are scattered.

### 2. Check whether they move or have lifted

Step on each marked tile with your weight on one edge. If it rocks, it has come away completely. Look at the joints: a broken or missing joint around a tile indicates movement. Run a long straight edge over the area to see whether there is a bulge or a step between tiles. A hollow but fixed tile, with intact joints and no cracks, is less urgent than one that moves.

### 3. Look for the cause

- Are you on a ground floor or a terrace? Think damp. Look for white salts in the joints or at the skirting, or a damp skirting board.
- Does the floor run tight to the walls, with no joint under the skirting? Did it appear in summer? Think expansion.
- Is it a recent renovation? Think laying or base.
- Is it an old flat with terrazzo? Think exhausted mortar.
- Do the hollow tiles follow a line? Think a crack in the base.

If you suspect damp, read [rising damp in Spain, what to do](/en/guides/rising-damp-in-spain-what-to-do/) before touching the floor; re-laying on a damp base is wasted work.

### 4. Decide the repair

- **Hollow, fixed and whole tiles, few and away from walkways:** watch. Check again every six months, or on each visit.
- **One or a few isolated loose tiles, whole, with a sound base:** lift and re-lay, or inject resin if they cannot be lifted without breaking and you need to keep them.
- **Tented or lifted area:** lift the whole area, create movement joints and re-lay.
- **Extensive hollows in an old room or with damp:** consider lifting the whole floor and rebuilding it, or treat the damp and then decide.

### 5. Lift and re-lay the tiles

Rake out the joint around the tiles with a grout rake or a multi-tool. Lift the tile by levering carefully from one edge; if it is loose it comes out whole, if it is half bonded it may break (have spares). Scrape and clean the base until it is firm, with no loose mortar or dust; vacuum. If the base is very absorbent or smooth, prime as the adhesive manufacturer specifies. Apply cement-based adhesive with a notched trowel on the base and a thin coat on the back of the tile (back-buttering), lay, press and level with the neighbours, leaving equal joints with spacers.

### 6. Grout and respect the times

Grout after 24 hours with a cement-based grout in the same colour. Keep off the floor for 24 to 48 hours. If you have created movement joints (perimeter or intermediate), fill them with a flexible sealant, never rigid grout, and hide them under the skirting or leave them visible with a profile.

## When resin can be injected and when it cannot

**Injecting resin or a fluid adhesive fills the air pocket under a loose tile without lifting it; it works on isolated tiles with a sound base and does not work for whole floors or where there is damp.**

It is used when the tile has no replacement (a discontinued old stoneware, an original terrazzo you do not want to lose), when it is hollow but not lifted and when the base underneath is firm. The joint or a discreet point on the tile is drilled, a low-viscosity epoxy or polyurethane resin or a fluid cement-based adhesive is injected with a syringe or gun until it fills the void, and the hole is plugged. The tile is held by the filling.

It does not work:

- On areas tented by expansion, because the stress is still there and lifts them again.
- Over mortar broken down by damp: the resin does not bond to loose sand.
- On floors with many hollow tiles: it costs more and works worse than lifting.
- On cracked tiles, which will keep breaking.

## Floors that lift through expansion: the summer problem in Alicante

**A ceramic floor laid tight against the walls, with no joints, builds up stress in the heat until an area comes away and lifts in a ridge; it is a classic of July and August in Alicante flats and terraces.**

Stoneware and porcelain expand with temperature. In a small room the expansion is minimal, but in large living rooms, long corridors and, above all, sun-exposed terraces, the floor needs joints to absorb it: a perimeter joint under the skirting (the floor must not touch the wall) and, over large areas, intermediate joints at intervals that coincide with those of the base. Many 1990s and 2000s renovations omitted them, and many terraces of apartments in Playa de San Juan, El Campello or Torrevieja were laid over waterproofing membranes without a thought for it.

When a floor lifts like this, the repair is not to glue the same tiles back in the same place: the affected area (usually a strip) has to be lifted, a cut made to create the missing movement joint, the tiles re-laid with a flexible adhesive (class C2 S1 or better, especially outdoors) and the joint sealed with a flexible material. On terraces, besides, it is worth checking that lifting has not damaged the membrane; if the terrace leaks, it is the moment to waterproof: €25 to €60 per m², VAT not included, as we explain in [terrace waterproofing cost](/en/guides/terrace-waterproofing-cost/).

## Old terrazzo and stoneware floors: repair or replace

**In 1960s to 1980s flats with terrazzo or stoneware over a lime or lean cement mortar, hollow tiles appear little by little; repairing areas makes sense while the floor is generally sound, and replacing it when the hollows are extensive or the flat is being renovated.**

Re-laying terrazzo requires spare tiles of the same type (sometimes found at salvage yards or taken from a wardrobe or box room in the same flat) and accepting that the polished finish will not be identical. When the hollows are many, the options are:

- **Lift the floor and lay a new one** with a screed and correct joints. It is the usual choice in a [full home renovation](/en/full-home-renovation-alicante/), and what we recommend if services are also being changed.
- **Lay a new floor on top** (thin porcelain, vinyl, laminate) after consolidating or replacing the hollow tiles and levelling. It saves rubble but raises the floor one or two centimetres, which affects doors and thresholds; the method is similar to the one in [tiling over existing tiles](/en/guides/tiling-over-existing-tiles-spain/).
- **Microcement over the existing floor**, €70 to €120 per m², VAT not included, only if the base is firm: every hollow tile has to be re-laid or filled first. We compare options in [microcement versus tiles](/en/guides/microcement-vs-tiles/) and on our [microcement in Alicante](/en/microcement-alicante/) page.

## Loose tiles through damp on ground floors and terraces

**If the floor sounds hollow on a ground floor or near a wall with white salts, the mortar is breaking down through damp; the damp has to be treated first and the floor rebuilt afterwards.**

On ground floors in the centre of Alicante, Benalua or San Blas, in village houses in Novelda, Aspe or Crevillent and in villa garages, water rises from the ground by capillary action and carries salts that destroy the bedding mortar. You see it in whitish joints, flaking skirtings and tiles that come away in rows along the wall. Re-laying them without more lasts a season.

The right approach is to diagnose (our damp diagnosis is free), cut the rising damp in the walls with a chemical barrier (€60 to €120 per linear metre, VAT not included) and, if the floor is badly affected, lift it and rebuild it with a damp-proof membrane under the screed. The detail is on our [damp treatment in Alicante](/en/damp-treatment-alicante/) page.

## Common mistakes

- **Gluing loose tiles with silicone or grab adhesive.** It is not a floor adhesive, it does not fill the void and the tile comes loose again.
- **Re-laying on the old mortar without cleaning it.** The new adhesive does not bond to loose sand. Scrape back to a firm base.
- **Not back-buttering.** It is the number one cause of hollow tiles in recent renovations, especially in large formats.
- **Laying the floor tight to the wall.** Without a perimeter joint, summer expansion ends up lifting it.
- **Filling movement joints with rigid grout.** It stops being a joint. Always a flexible sealant.
- **Laying a new floor over hollow tiles.** The problem moves up a level: the new floor ends up sounding hollow too.
- **Ignoring the damp.** Re-laying on a damp ground floor without treating the cause means repeating the job every two years.
- **Walking on it too soon.** A cement-based adhesive needs 24 to 48 hours without load; walking on it earlier breaks the bond just as it forms. If cleaners or guests are due, schedule the repair accordingly.

## When to call a professional

**Finding the hollow tiles and re-laying two or three with spares are tasks within reach of someone reasonably handy; a lifted area, an old floor with many hollows, any case with damp or a terrace with a membrane underneath needs a builder.**

You can do it yourself:

- Walk the floor tapping and mark the hollow tiles.
- Check movement, joints and bulges.
- Look for the clues to the cause (damp, joints, date of the renovation).
- Lift and re-lay one or a few loose tiles in a dry area, if you have spares and cement-based adhesive.
- Inject resin into an isolated tile following the product instructions.

Better a professional:

- Areas tented by expansion: joints have to be cut, the right adhesive chosen and the joint sealed properly.
- Old floors with many hollow tiles: deciding between repairing, covering or replacing requires seeing the base.
- Any terrace: underneath there is a waterproofing layer that is easily damaged and should be checked.
- Floors with damp: first diagnosis and treatment, then building work.
- Cracked bases or crumbling screeds: the base has to be rebuilt.
- Commercial units and holiday lets where the floor has to be perfect and quick, between one booking and the next.

Small repairs (re-laying a few tiles with your spares) are done by our partner [Manitas Costa](https://manitascosta.es/en/), which suits owners who are not here to meet a tradesman. Repairs to areas or rooms we quote item by item after a visit within 48 to 72 hours in Alicante and the surrounding area, free and without obligation, with a written guarantee on the work and photos before and after. See our [full home renovation](/en/full-home-renovation-alicante/) service for complete floor replacements, or book your visit through [contact](/en/contact/).
