# Inherited property in Spain: where to start

An inherited flat in Spain is dealt with in this order: first the paperwork (accepting the inheritance, taxes, change of title at the Land Registry, Catastro, community of owners and utilities), then clearing it and an honest check of its real condition (services, damp, structure, building), then the decision to live in it, let it or sell it, and only then the renovation. In 1960s to 1980s flats in Alicante, the usual outcome is renewed services and a full renovation at €450 to €900 per m² in 8 to 14 weeks if you are going to live there, or a tidy-up if you are letting or selling; all VAT not included.


## Inherited flat: where to start, in one sentence

**First the paperwork (acceptance, taxes, Land Registry, Catastro, community, utilities), then clear it and check its real condition, then decide whether to live in it, let it or sell it, and only then renovate: a full renovation at €450 to €900 per m² in 8 to 14 weeks if you are going to live there, or a tidy-up if you are letting or selling; all VAT not included.** The most common mistake is to start with the renovation, and the second most common is to start clearing without having looked at the papers.

For British, Irish and northern European families, inheriting on the Costa Blanca usually means a 1970s to 1990s apartment in Playa de San Juan, Albufereta, Santa Pola, Gran Alacant, Torrevieja or Benidorm, or a villa in an urbanisation, that was a parent's retirement or holiday home; for Spanish families, more often a 1960s to 1980s flat in the city centre, Carolinas, San Blas, Benalúa or central Elche or Elda. Almost always with original services, a great deal of furniture, more than one heir, several of them living in another country, and emotional decisions in the middle.

This guide orders the process into seven steps, explains the paperwork in general terms (the detail is for your lawyer, gestor or the notary), what to check in an old flat, how to decide between living, letting and selling, and which renovation suits each case with the prices published on our [renovation prices page](/en/renovation-prices-alicante/).

## Indicative calendar: what comes before what

**The order matters because each step depends on the previous one: without the flat in your name you cannot commission, without clearing you cannot inspect, without inspecting you cannot decide, without deciding you cannot quote.** This table summarises the process with indicative timings.

| Step | What is done | Who does it | Indicative timing | Reference cost |
|---|---|---|---|---|
| 1. Inheritance | Acceptance before a notary, inheritance tax, municipal plusvalía, Land Registry, Catastro | Notary, lawyer or gestor, heirs | 1 to several months | Depends on value and region; check current allowances |
| 2. Titles | Community of owners (certificate of debts), electricity, water, gas, IBI, insurance | Heir | Days to weeks | Low |
| 3. Clearance | Separate, donate, sell, remove; skip or clearance company | Heir, company | 1 to 5 days | Depends on volume; skip with street permit |
| 4. Technical check | Services, damp, cracks, windows, building, levies | Renovation company, technician | 1 visit | Visit and quote free with us |
| 5. Decision | Live, let or sell; level of renovation | Heirs | As long as it takes | Compare local prices |
| 6. Quote | Fixed, itemised, for the level chosen | Renovation company | 1 to 2 weeks | Free and without obligation |
| 7. Permit and works | Declaración responsable or minor works licence; notice to community; works | Company; town hall | Tidy-up 1 to 2 weeks; bathroom 2 to 3 weeks; kitchen 3 to 5 weeks; full 8 to 14 weeks | Full €450 to €900 per m²; bathroom €5,500 to €12,000; kitchen €7,000 to €18,000 |
| Documents to let or sell | Energy performance certificate; licencia de ocupación or cédula | Technician | Days to weeks | €90 to €180; €100 to €200 |

All prices are VAT not included. The inheritance timings depend on the number of heirs, whether there is a will, where the heirs live and the workload of the notary and the administration; we give them only so you can picture the whole.

## Steps 1 and 2: the paperwork, in general terms

**The flat has to be in your name before you do anything: acceptance of the inheritance before a notary, payment of inheritance tax and the municipal plusvalía within the deadlines, registration at the Land Registry and the Catastro, and then change of title with the community and the utilities.** We are not tax advisers or lawyers: what follows is a general orientation so you know what to ask.

- **Will or declaration of heirs.** With a Spanish will, the notary prepares the acceptance and adjudication; with only a foreign will, or none, there are extra steps to establish who inherits. You will need the death certificate, the Spanish certificate of last wills and the life insurance certificate; foreign documents usually need an apostille and a sworn translation.
- **Inheritance tax.** Settled with the regional tax authority, with a general deadline of six months from the death (extendable if requested in time). The Valencia region has allowances for close relatives that change over time, and non-resident heirs have their own rules. Check what applies with your adviser.
- **Municipal plusvalía.** The tax on the increase in land value is settled with the town hall where the flat is, also with a deadline. Ask whether it applies in your case.
- **Land Registry and Catastro.** With the deed of acceptance, the flat is registered in the heirs' names. The Catastro is updated so the IBI (the local property tax) is billed to the right person.
- **Several heirs.** If the flat is left in joint ownership (proindiviso), any decision (renovate, let, sell) needs the agreement of all co-owners. Before commissioning works, put it in writing: who pays what, who decides, and what happens to the flat afterwards. When the heirs live in different countries, a single point of contact with a power of attorney saves months.
- **Community of owners.** Notify the administrador (the block's managing agent) of the change of owner and ask for the certificate of debts: unpaid fees and levies of the deceased pass with the flat. Ask about approved derramas (special levies for the facade, lift or building inspection) and the rules on works.
- **Utilities.** Transfer electricity, water and gas to your name or reconnect them if cut off. To reconnect a supply cut off years ago they may ask for an installer's boletín and, in the Valencia region, a licencia de ocupación in force; see [cédula de habitabilidad: the habitation certificate in Alicante](/en/guides/cedula-de-habitabilidad-habitation-certificate-alicante/).
- **Home insurance.** Check whether there is a policy, change the policyholder and review what it covers, especially if the flat will be empty for months.

## Step 3: clearing the flat

**Clearing the flat has three phases: separate what matters, find a home for what is usable and remove the rest; it is done before the technical check because with the furniture in you cannot see walls, floors or services.** It is the most emotional step and deserves its time, but should not drag on for years.

1. **Separate documents, money, jewellery and keepsakes.** Go through drawers, wardrobes, books and pockets. The documents (deeds, receipts, policies, invoices for old works, the previous licencia de ocupación) will be needed.
2. **Find a home for what is usable.** Furniture in good condition, recent appliances, clothes and books: donation to charities that collect, second-hand sale, or sharing among the family.
3. **Remove the rest.** For a whole flat, a clearance company does it in a day or two; for less, a skip in the street with a permit to occupy the public road. In lift-free blocks, carrying heavy furniture down the stairs has its cost.
4. **Do not throw out anything from the installations yet.** Radiators, water heater, air conditioning units, lamps: the technical check decides whether they are usable.

If you renovate with us, the clearance can be included as an item in the quote; the sorting of keepsakes is for the family. For heirs abroad this is usually the one trip that cannot be avoided; everything after it can be managed at a distance.

## Step 4: checking the real condition

**An inherited 1960s to 1980s flat is checked on six points: electrical installation, plumbing and soil stacks, gas, damp and cracks, joinery and condition of the building; the result tells you how much has to be spent before any cosmetic decision.** It is the visit we do free and the one that changes the plan most.

### Electrics

Consumer unit with or without RCD and circuit breakers, presence of an earth, cable size (in the 1960s and 1970s often too small for today's appliances), unearthed sockets, contracted power. In most inherited flats of that era the whole installation has to be renewed with a boletín from a registered installer; we detail it in [rewiring a flat in Spain: cost](/en/guides/rewiring-a-flat-in-spain-cost/).

### Plumbing and soil stacks

Lead pipe (prohibited today in new installations and to be replaced), galvanised iron with scale and low pressure, stop valves that do not close, an old water heater. The building's soil stack, if it is asbestos-cement or iron, is a common element and is coordinated with the community. Read [replacing lead or iron pipes in Spain](/en/guides/replacing-lead-or-iron-pipes-spain/) and [low water pressure in a Spanish home](/en/guides/low-water-pressure-in-spain-causes-and-fixes/).

### Gas

If there is bottled butane, check the hose and regulator and whether it is being kept. If there is mains gas, the date of the last inspection. In many renovations the gas is removed and the flat moves to an induction hob and electric or heat-pump hot water; it is a project decision.

### Damp and cracks

Stains on ceilings (a leak from the neighbour above or the roof), salt efflorescence on ground floors, mould in the corners of external walls, a musty smell from months closed up. Free damp diagnosis; see [damp treatment in Alicante](/en/damp-treatment-alicante/) and [condensation and mould on walls in Spain](/en/guides/condensation-and-mould-on-walls-spain/). Cracks: most are in the finish; if one is diagonal, wide or recent, a technician is consulted.

### Joinery and floors

Single-glazed aluminium or timber windows, blinds, doors, terrazzo. Almost all of it is reusable or replaceable; what matters is knowing what stays. The decisions are in [interior doors: replace or respray](/en/guides/interior-doors-replace-or-respray/) and [uPVC vs aluminium windows: cost in Spain](/en/guides/upvc-vs-aluminium-windows-cost-spain/).

### Building and community

Condition of the facade, roof, stairwell and lift; the building inspection report (ITE or IEE); approved or expected levies; rules on works. It is what most conditions the value of the flat and cannot be changed from inside.

## Step 5: live in it, let it or sell it

**The decision is made with the real condition of the flat and the price at which similar flats sell and let in the area; each option demands a different level of renovation, and confusing them is the easiest way to overspend.** This is the relationship between decision and renovation.

| Decision | Renovation it usually calls for | Reference price (VAT not included) | Detailed guide |
|---|---|---|---|
| Live in it yourself | Full renovation with services, bathrooms, kitchen, floors, windows and often a new layout | €450 to €900 per m², 8 to 14 weeks | [Renovation cost per m² in Alicante](/en/guides/renovation-cost-per-m2-alicante/) |
| Let it | Safe services, damp resolved, painting, bathroom with shower, complete kitchen, air conditioning; certificate and licencia de ocupación | Painting €8 to €14 per m²; bath to shower €950 to €2,200; split unit €900 to €1,600 | [Renovating a flat to rent out in Spain](/en/guides/renovating-a-flat-to-rent-out-in-spain/) |
| Sell it | Damp and dangerous services resolved, cleaning, painting, small repairs, certificate; no full renovation | Certificate €90 to €180; painting €8 to €14 per m² | [Renovating before selling a flat in Spain](/en/guides/renovating-before-selling-a-flat-in-spain/) |
| Keep as a holiday home | Safe services, damp resolved, ventilation, working air conditioning, a bathroom that suits short stays; the rest by stages | Free diagnosis; depends on scope | [Renovating a holiday rental between seasons](/en/guides/renovating-a-holiday-rental-between-seasons/) |
| Undecided | The minimum that keeps it sound: damp, safe electrics, ventilation | Free diagnosis; depends on scope | This guide |

Two pieces of advice from experience. First: if there are several heirs and no agreement, do not renovate; do the minimum so the flat does not deteriorate and resolve the ownership first. Second: if you are going to live there, do not do a tidy-up "to get by" and a full renovation three years later; it is paying twice.

## Steps 6 and 7: quote, permit and works

**With the decision made, you ask for a fixed itemised quote for that level, always with the services inside, the declaración responsable or minor works licence is filed with the town hall, the community is notified and the works are planned with a calendar.** It is the part we run from start to finish.

- **Quote.** Itemised, with measurements, defined materials, VAT separate, timeline and guarantee. In an inherited flat, the services item is not optional; if a quote leaves it out, it is not comparable. Method in [how to read and compare a Spanish renovation quote](/en/guides/how-to-read-and-compare-a-spanish-renovation-quote/).
- **VAT.** If you are a private individual, the home is more than two years old and the materials do not exceed 40% of the taxable base, the rate is 10%; a renovation of an inherited flat usually qualifies. Details in [the reduced 10% VAT on renovations in Spain](/en/guides/reduced-10-percent-vat-renovation-spain/).
- **Permit.** Interior renovation without touching structure or facade: declaración responsable or minor works licence, depending on the town hall (Alicante, Elche, San Vicente, El Campello, Santa Pola, Elda and so on). If there are load-bearing walls or window changes affecting the facade, a project may be needed. We handle it; read [declaración responsable for building works in Spain](/en/guides/declaracion-responsable-building-works-spain/).
- **Community.** Notice to the administrador, working hours, use of the lift, skip, coordination of the soil stack if it is touched. Guide in [community of owners permission for renovations in Spain](/en/guides/community-of-owners-permission-renovation-spain/).
- **Works.** Tidy-up in one or two weeks; bathroom 2 to 3 weeks; kitchen 3 to 5 weeks; full renovation 8 to 14 weeks for 70 to 100 m². Usual order: demolition, services, partitions, floors and tiling, ceilings, joinery, painting, final fit-out. If the flat is on the coast, plan outside the season; read [the best time of year to renovate in Alicante](/en/guides/best-time-of-year-to-renovate-in-alicante/). For heirs abroad, this stage runs on photo and video updates at the end of each phase, with your key holder giving access.

## What a typical inherited property in Alicante looks like

**Inherited flats in Alicante are mostly 80 to 110 m² homes from the 1960s to 1980s with a long corridor, a closed kitchen with a galería, one bathroom with a bath, terrazzo floors, sliding aluminium windows and gotelé; or 60 to 90 m² coastal apartments from the 1970s to 1990s with a terrace and damp.** Each type has its typical renovation.

In the city centre, Ensanche-Diputación, Carolinas, San Blas, Benalúa, el Pla or central Elche and Elda, the usual full renovation opens the kitchen to the living room, turns the galería into a utility room, adds a second WC, renews the services, replaces the windows and skims the walls. The buildings often have load-bearing walls rather than columns, which conditions the layout; it is checked before anyone promises an open-plan kitchen. See [renovating an old flat in Spain: where to start](/en/guides/renovating-an-old-flat-in-spain-where-to-start/).

In Playa de San Juan, Albufereta, Cabo de las Huertas, El Campello, Santa Pola, Guardamar or Torrevieja, the inherited apartment has usually sat closed for months at a time: condensation, salt on the joinery and skirting, loose tiles on the terrace. The renovation prioritises ventilation, windows with a thermal break (€350 to €900 per unit), terrace waterproofing (€25 to €60 per m²) and air conditioning. If it is going to be let by the season, the works are done from October to May. This is the typical case for British and Irish heirs, and the one most often managed entirely from abroad.

In inherited villas in San Vicente, Mutxamel, Busot or the coastal urbanisations, the check includes the roof, the pool (rehabilitation €4,000 to €15,000, best from October to April) and the long service runs; a full villa renovation costs €600 to €1,200 per m² and takes 3 to 6 months. See [villa renovation in Alicante](/en/villa-renovation-alicante/).

## Common mistakes

- **Starting the renovation before the flat is in your name.** Without the deed of acceptance and registration, you cannot commission safely or sell afterwards.
- **Renovating with several heirs and no written agreement.** The most common source of family conflict; agreement first, then works.
- **Throwing out documents during the clearance.** Deeds, invoices for old works, policies, community receipts and old certificates will be needed.
- **Leaving the services "as they are" because they work.** They work until they do not; renewing them later means opening everything up again.
- **Doing a tidy-up to live in it "for now".** You pay twice: now and when you do the real renovation.
- **Forgetting the energy certificate and the licencia de ocupación when letting or selling.** They are cheap and avoid delays at completion.
- **Not asking the community for the certificate of debts.** Outstanding levies are inherited with the flat.
- **Not keeping a reserve for what appears when the walls are opened.** In 1960s to 1980s flats something always turns up: the soil stack, the floor slab, lead.

## When to call a professional

**The paperwork is for the notary and your lawyer or gestor; the clearance and the sorting of keepsakes, for the family; the technical check, the quote, the permit and the works, for a renovation company; the energy certificate and the licencia de ocupación, for a technician.** What you should avoid is a handy relative "getting on with" the services in a flat that is then going to be let or sold.

A registered electrician leaves a boletín; a plumber replaces the lead with a guarantee; a renovation company coordinates the trades, the permit and the community with a single project manager, and hands over an invoice and a written guarantee, which you will need if you let or sell. If there are doubts about cracks or load-bearing walls, a technician writes the report. The split is in [what you can do yourself and what you cannot](/en/guides/diy-vs-professional-renovation-spain/).

If you have inherited a property in Alicante and do not know where to start, we visit within 48 to 72 hours in Alicante and the surrounding area, check the services, damp and condition of the building, and give you a fixed itemised quote, free and without obligation, for whichever option you choose (live, let or sell), with the permit handled, a single English-speaking project manager and a written guarantee. See our [full home renovation in Alicante](/en/full-home-renovation-alicante/) service or book your visit through [contact](/en/contact/).
