# How to read and compare a Spanish renovation quote (presupuesto por partidas) without getting caught out

A good Spanish renovation quote (presupuesto) is broken down into partidas, individual work items with measurements and unit prices, says what is and is not included, shows IVA separately and leaves no items open. To compare several, do not look at the total: match the scope item by item, check the measurements and find what is missing. This guide explains how to do it step by step, with our indicative prices for Alicante as a reference.


## What a Spanish renovation quote is and why the total is useless for comparing

**A renovation quote (presupuesto) is the description of the works divided into partidas, work items with measurements and prices, plus the conditions (what is included, what is excluded, IVA, timescale, payment terms and guarantee); the total on its own tells you nothing if you do not know what is inside it.** Two quotes for the same bathroom can differ by thousands of euros simply because one includes demolition, complete services, permits and cleaning and the other does not.

The format will look unfamiliar if you are used to UK builders' estimates, which are often a page of prose and a figure. A Spanish presupuesto por partidas is closer to a bill of quantities: every job is a line with a unit, a quantity and a unit price. Once you know how to read it, it is far more transparent.

For orientation on totals, our indicative prices in Alicante are: complete bathroom renovation €5,500 to €12,000; kitchen renovation €7,000 to €18,000; full flat renovation €450/m² to €900/m²; bath to shower conversion €950 to €2,200; all VAT not included. They are on our [renovation prices in Alicante](/en/renovation-prices-alicante/) page. But those ranges are the starting point, not the end: what decides whether a quote is good is how it is built.

This guide teaches you to read a quote item by item, to spot what is missing and what is left open, and to compare several with a method you can apply in an afternoon. It is useful whether you hire us or not.

## Anatomy of a good quote: what it must contain

**A good quote has full identification, a description of the scope, items by chapter with unit, measurement, unit price and amount, specified materials, clear exclusions, IVA broken down, timescale, payment terms, guarantee and validity.** If any of these elements is missing, ask for it to be added before going further.

| Element | What it should contain | Warning sign |
|---|---|---|
| Identification | Company tax details (NIF), customer details, site address, date and validity | No NIF or legal name; only a trading name |
| Description of scope | Summary of the works: rooms, what is demolished, what is installed, what is kept | "Complete bathroom renovation" and nothing else |
| Chapters and items | Demolition, masonry, plumbing, electrics, finishes, joinery, painting, cleaning, paperwork | A single global item or a very large "sundries" chapter |
| Measurements | Unit (m², linear m, unit, hour), quantity, unit price, amount | Items with no quantity or unit |
| Materials | Type, format, quality or reference price range | "Tiles to be chosen" with no reference amount |
| Inclusions and exclusions | Rubble, protection, permits, plant, final clean, installer certificates | Nothing about rubble, permits or cleaning |
| IVA | Taxable base, rate applied and amount | "IVA included" with no rate, or "no IVA" |
| Timescale | Duration of the works and, better, a phased schedule | No timescale or an unrealistic one |
| Payment terms | Stage payments tied to progress | More than a third up front |
| Guarantee | Written guarantee of the works and its period | No mention of guarantee |
| Change procedure | How changes during the works are priced and approved | Nothing planned; extras decided as they go |

## How to read the items and the measurements

**Each item describes a unit of work with its measurement and price; to read it properly you check three things: that the description says what is included, that the measurement is consistent with your home and that the material is defined.** It is easier than it looks once you know the structure.

### The chapter structure

A renovation quote is usually ordered like this: preliminary work and protection, demolition and rubble removal, masonry (partitions, render, screeds), plumbing and drainage, electrics, air conditioning, finishes (wall and floor tiling), ceilings and plasterboard, interior and exterior joinery, painting, sanitaryware and fittings, final clean, and paperwork (permits, installer certificates, site supervision if any). If a whole chapter is missing, ask why: it may not be needed, or it may have been left out.

### The measurements

The measurement is the quantity: square metres of tiling, linear metres of chasing, number of lighting points. Check the ones that weigh most with a tape measure. In a 5 m² bathroom with 2.5 m ceilings, the walls add up to around 22 m² of tiling before deducting the door and window; if the quote says 12 m², either it only tiles to half height or it is short and an extra will appear. In a 90 m² full renovation, the flooring should be around that figure plus wastage for cuts.

### The materials

There are three correct ways to state a material: a specific brand and model, a description with characteristics (rectified 60x60 porcelain, class 3 anti-slip) or an item with a reference amount ("resin shower tray, reference amount X €, to be chosen by the customer"). What is not correct is "to be chosen" with no amount, because then the quote is not fixed. If you have a specific material in mind (a porcelain tile, a tap range), ask for it to be written into the quote.

### Labour and materials separated

Separating labour and materials in each item is not compulsory, but it has two advantages: it lets you check whether the 40% materials limit for the reduced 10% IVA rate is met, and it makes it easier to decide whether to buy any material yourself. We explain this in the guide on the [reduced 10% VAT rate on renovations in Spain](/en/guides/reduced-10-percent-vat-renovation-spain/).

## What is usually missing: the items that come back as extras

**The items most often left out of a quote and later presented as extras are demolition and rubble, protection, complete services, permits and fees, suspended ceilings, painting, installer certificates and final clean.** Check this list against every quote you receive.

- **Demolition and rubble removal**, including the skip and its public road occupation permit, or carrying down by hand if the community does not allow the lift.
- **Protection of common areas** and of whatever is not being renovated.
- **Complete services**: in older flats, changing only "what you can see" leaves lead pipe or old cabling behind the new tiles. Ask whether the quote replaces the water and electrical installation in the renovated rooms, and whether it includes the consumer unit.
- **Permits and fees**: handling the declaración responsable or licence is usually included; the municipal fees per ordinance and the ICIO construction tax are separate and the quote should say so.
- **Suspended ceilings** and boxing to hide services.
- **Painting** of affected ceilings and walls, with preparation (sanding, filler) and not just "one coat".
- **Installer certificates (boletines)** for electrics or gas, needed to register or upgrade supplies.
- **Sanitaryware, taps, screen, switches and light fittings**: sometimes the quote only includes their installation, not the material.
- **Final clean.**
- **Plant and access equipment**: scaffolding, platforms, machinery.
- **Contingencies**: not as an open item, but as a procedure: how they are priced and approved before being carried out.

For a bathroom renovation, the guide on [bathroom renovation mistakes](/en/guides/bathroom-renovation-mistakes/) lists what a bathroom quote must contain; for a whole flat, our [full home renovation](/en/full-home-renovation-alicante/) page sets out what is included.

## Items "a justificar", hourly rates and open quotes

**An item "a justificar" is an item without a fixed price that is invoiced according to what is done; an uncapped hourly rate or an "estimated" quote work the same way. They are acceptable only for what genuinely cannot be known before opening up, and always with an approval procedure.**

Cases where an open item is reasonable: the condition of a floor slab or a drainage stack that cannot be seen until demolition, the repair of damp whose extent is unknown, temporary propping whose scope the technician defines on opening up. The correct approach is for the quote to say what will be done if the problem appears, at what unit price, and for the customer to approve it before it is carried out.

Cases where it is not acceptable: tiling, flooring, services, painting, sanitaryware, joinery. All of that can be measured and fixed at the technical visit. A quote with many items a justificar is not a fixed quote and, in practice, you do not know how much you will pay.

Hourly rates make sense for small repairs and handyman jobs, which our partner [Manitas Costa](https://manitascosta.es/en/) handles. For a renovation, what you need is a fixed price by items.

## How to compare renovation quotes, step by step

**To compare quotes, ask every company for the same scope, insist on an itemised breakdown, match what each one includes in a table, check measurements and materials, find open items and conditions, and only then compare totals excluding IVA together with timescale, guarantee and project manager.** Six steps that fit in an afternoon and avoid most bad experiences.

### 1. Ask for quotes with the same scope

Write a list of works and, if you have them, reference materials, and give it to every company. "I want to renovate the bathroom" produces incomparable quotes; "demolish, new water and electrical services, resin shower tray, floor-to-ceiling tiling with 30x60 porcelain, suspended ceiling, wall-hung toilet, 80 cm basin unit, screen, painting" produces comparable ones.

### 2. Check the breakdown

Reject or ask for a rewrite of any quote with a lump sum or items without units and quantities. A company that cannot break it down has not measured your home.

### 3. Match the scope item by item

Build a table with one row per item and one column per company. Mark what is missing in each using the list in the previous section. Add to each quote the indicative cost of what it lacks, or ask for it to be included. Only then do the totals start to be comparable.

### 4. Check measurements and materials

Compare the square metres of tiling, flooring, chasing and lighting points between quotes. Large differences point to a short measurement or a different scope. Check that materials are at the same level: a rectified porcelain tile and a basic ceramic tile are not the same item.

### 5. Find open items and read the conditions

Mark the items a justificar, hourly rates and exclusions. Read the payment terms (stage payments tied to progress, not large deposits), the timescale (with a phased schedule, ideally), the written guarantee, validity and how changes are handled.

### 6. Compare the total excluding IVA, with the same scope

Now yes: compare totals excluding IVA and with matched scope. And weigh alongside the price what is not in the figure: a single project manager, handling of permits, a realistic timescale and the guarantee. The cheapest quote with matched scope and good conditions is a good choice; the cheapest without matching scope is usually the most expensive in the end.

## Specifics in Alicante

**In Alicante, two factors make reading the quote properly especially important: the older flats in the centre, where "what you cannot see" weighs heavily, and the coastal apartments, where community logistics and seasons affect the price.** Ask about both at the visit.

In a 1960s to 1980s flat in the Centro, Carolinas, Benalúa or San Blas, the quote must say expressly whether it replaces the complete water and electrical services, whether it includes the consumer unit, what happens with the drainage stack and whether it allows for damp treatment. Those are the items that make the difference between €450/m² and €900/m² in a full renovation, and the ones that generate extras when left out. We cover this in the guide on [renovating an old flat in Spain](/en/guides/renovating-an-old-flat-in-spain-where-to-start/).

In apartments in Playa de San Juan, Albufereta, Cabo de las Huertas, El Campello or Gran Alacant, ask whether the quote includes the protection of common areas the community requires, carrying rubble down the stairs if the lift cannot be used, and restricted working hours. And if the property is a holiday let, whether the timescale fits between seasons; our guide on [how long a full renovation takes](/en/guides/how-long-does-a-full-renovation-take/) will help you plan it.

## Common mistakes

- **Comparing totals without matching the scope.** This is mistake number one. The cheapest quote is usually the one that includes least.
- **Accepting "to be chosen" items with no reference amount.** The quote stays open and the material ends up costing more than planned.
- **Not checking the measurements.** Short tiling or flooring with no wastage appear later as extras.
- **Paying large deposits.** Payments should be tied to progress, with a reasonable first payment for materials.
- **Signing without timescale, guarantee or a change procedure in writing.** A quote is a proposal; the contract must record everything.
- **Accepting "no IVA".** It leaves you without an invoice, without a legal guarantee and with tax liability. And "IVA included" quotes with no rate stated do not allow comparison either.
- **Ignoring what is not in the figure.** A single project manager, handling of permits and a phased schedule are worth money when something goes wrong, especially if you are not in Spain.
- **Asking for quotes without being clear about what you want.** The more specific the list of works, the more comparable and the tighter the quotes.

## When to call a professional

**Reading and comparing quotes is something you can do yourself with the method in this guide; what you cannot do without a technical visit is know whether the measurements are right and whether the quote allows for what is really behind the tiles in your home.** That is why a serious quote starts with a visit, not with a form.

If the works include structure, facade or change of use, the quote must come with a technician's project, with their fees shown separately; we explain this in the guide on [when a major works licence is needed](/en/guides/major-works-licence-spain-when-needed/). And if you have several quotes and cannot decide, a second technical visit to cross-check measurements and items usually clears up the differences.

At Costa Renova the quote is fixed and itemised, free and without obligation, with the technical visit within 48 to 72 hours in Alicante and the surrounding area, a single project manager, handling of the declaración responsable or licence with the town hall and a written guarantee of the works. If you want a quote to compare with the ones you already have, or the first one for your renovation, request it from our [renovation prices in Alicante](/en/renovation-prices-alicante/) page or from the [contact](/en/contact/) page.