# What you can do yourself and what you cannot in a Spanish renovation

In a Spanish renovation you can do the painting, dismantling furniture, clearing the property, assembling flat-pack furniture and small finishing jobs yourself. You should not touch the electrics or gas (both require a registered installer and a certificate), the structure, the facade or the building's common elements, and buried plumbing is best left to a professional. Here we explain where the line is, why it exists and how much you really save.


## The line in one sentence

**You can do yourself whatever needs no certificate, does not affect the structure or the common elements of the building, and leaves no hidden consequences if it goes wrong: painting, strip-out, furniture assembly, finishes and cleaning. You should not do electrics, gas, structure, facade or buried plumbing.** That is the rule; the rest of the guide explains why and where the nuances are.

We say this from the experience of seeing renovations where the owner had done part of the work. Sometimes it works very well: a flat in Carolinas where the owner painted and assembled the flat-pack kitchen and saved a worthwhile sum. And sometimes badly: a bathroom in Playa de San Juan with a home-made waste connection that ended in damp on the downstairs neighbour's ceiling and in opening up what had already been tiled.

The difference was not in the person's skill but in which job they chose. That is why this guide does not talk about "whether you know how", but about which items have a safety net (the result is visible, it is easy to correct) and which do not (it is covered over, it affects third parties, it requires a certificate). For owners coming from the UK or Ireland there is a second point: the rules on who may do what are stricter in Spain than at home, especially for electrics, and a British or Irish qualification does not transfer to the Spanish certificate system.

## Table: what you can do yourself and what you cannot

**Most items in a renovation fall into three groups: the ones you can do without any problem, the ones you can do with experience and conditions, and the ones you should not do.** This table applies to a flat or villa renovation in Alicante and the surrounding area.

| Item | Can you do it yourself? | Why |
|---|---|---|
| Clearing the property, dismantling furniture | Yes | No technical risk; saves labourer hours |
| Removing contents, trips to the ecoparque (recycling centre) | Yes | Only organisation and a vehicle |
| Painting walls and ceilings | Yes | Visible, correctable result |
| Sanding and varnishing wooden doors and windows | Yes | A job of patience, not of certificates |
| Assembling flat-pack furniture, curtains, accessories | Yes | At the end, without getting in the trades' way |
| Removing gotelé or wallpaper | With experience | Laborious; in old flats the plaster underneath may be damaged |
| Laying floating laminate floor | With experience | Needs levelling, skirting and well-finished junctions |
| Changing taps, hoses, visible traps | With care | Close the stop valves; if it drips, you see it |
| Tiling walls and floors | Not recommended | Flatness, shower falls and waterproofing: redone if it fails |
| Buried plumbing, wastes, soil stacks | No | Hidden damage, affects neighbours |
| Electrical installation (new or modified) | No | Registered installer and certificate compulsory |
| Gas (hob, boiler, water heater) | No | Registered installer and certificate compulsory |
| Air conditioning and aerotermia (heat pump) | No | Handling refrigerant gases, qualified installer |
| Partitions and demolition | Not without a technician | Risk of load-bearing wall, services inside |
| Structure, floor slabs, beams | No | Project, major works licence, technical supervision |
| Facade, external windows, terrace, patio | Not without the community | Common elements, permission from the community and town hall |
| Waterproofing a roof or terrace | Not recommended | A failure shows with the first autumn storm |

If an item is in "yes", go ahead. If it is in "with experience", do it only if you have done it before and have the time. If it is in "no", the apparent saving does not compensate for the exposure.

## What you can do, and how to do it well

**The jobs you can take on without risk are those at the start and end of the work: clearing, dismantling, painting, assembling and cleaning.** Well planned, they save real labour and do not get in the trades' way.

### Before the work: clearing and dismantling

Removing furniture, curtains, lamps, pictures and appliances is work that, if the company does it, is invoiced as labourer hours or as a "vaciado" (clearance) item. Doing it yourself is a clean saving. Take what is no longer wanted to the municipal ecoparque (Alicante, Elche, San Vicente and Sant Joan have bulky-waste collection services by appointment) and protect what stays. If you are managing an inherited flat from abroad, this is often the one job worth flying out for, because it also means sorting the contents.

Dismantling kitchen units or built-in wardrobes is also feasible if you are careful: disconnect water, electricity and gas from the appliances first only if you know how; if not, ask the relevant trade to do it before you start.

### Painting

It is the most common self-build item. Painting walls and ceilings that are already smooth has a professional cost of €8 to €14 per m², VAT not included, in our case, and you can see it broken down in the guide to the [cost to paint a flat in Spain](/en/guides/cost-to-paint-a-flat-in-spain/). If you do it yourself, you save that labour, but bear in mind:

- Paint at the end, when the electricians, plumbers, carpenters and plasterboard fitters have finished. If you paint before, you will repaint.
- Prepare well: filler, sanding, primer on repaired areas and on new plasterboard. 70% of a good painter's time is preparation.
- In homes near the sea, use paints with good moisture resistance in bathrooms and kitchens; in Albufereta, Cabo de las Huertas or Santa Pola, salt air and condensation punish cheap finishes. The guide to [which paint to choose](/en/guides/which-paint-to-choose-matt-satin-anti-mould/) explains the Spanish paint types.
- Removing gotelé in one room is manageable; in a whole flat it is exhausting, dusty work, and in 1960s and 1970s buildings the plaster underneath may be in poor condition. Weigh it up before starting.

### Assembly and finishes

Flat-pack furniture, curtains, wardrobe rails, towel rails, mirrors, shelves: these are drill-and-spirit-level jobs. Do them once the work has been handed over and cleaned.

### Final cleaning

The end-of-works clean is an item some companies include and others charge separately. If you take it on, make sure it is clear in the quote, and bear in mind that building dust settles in every corner for weeks.

## What you should not do, and why

**Electrics, gas, air conditioning, structure, facade and buried plumbing are not DIY jobs because they require a certificate, affect third parties or are covered over and not seen until they fail.** It is not distrust of your ability: it is how responsibility works on a building site in Spain.

### Electrics

Any new or modified electrical installation (adding circuits, changing the consumer unit, wiring a renovated kitchen) must be carried out by a registered installer, under the Spanish low-voltage regulations (REBT). That installer issues the installation certificate, known as the boletín, which the electricity company will ask for to connect the supply or increase the contracted power. Without that document, there is no connection. This is the point that most surprises British and Irish owners: it does not matter how competent you are, or what qualifications you hold at home; the boletín has to come from an installer registered in Spain. On top of that, a badly sized circuit or a missing earth is a real risk of fire or electrocution, and the home insurer can refuse cover if a non-compliant installation is shown.

What you can do: swap a switch or socket for an identical one with the main breaker off and after checking there is no voltage, change bulbs and ceiling lights. What you cannot: everything else. Our registered electricians do the installation and hand over the boletín; the costs are in [rewiring a flat in Spain](/en/guides/rewiring-a-flat-in-spain-cost/).

### Gas

The gas installation (hob, water heater, boiler) and any modifications are carried out by a registered gas installer, who issues the corresponding certificate. There is no grey area.

### Air conditioning

Installing a split unit or an aerotermia heat pump involves handling refrigerant gases, which requires a specific qualification, on top of the electrical side. Buying the unit yourself is possible, but the installation should be done by a qualified installer. The guide to [air conditioning installation cost in Alicante](/en/guides/air-conditioning-installation-cost-alicante/) has the detail.

### Structure and demolition

Knocking down a partition looks simple. The problem is that in the 1960s to 1980s buildings of the city centre, Benalúa, San Blas or the Ensanche of Alicante there are not always reliable plans, and a partition may be propping a beam or hiding a soil stack or another flat's wiring. Before demolishing, the structure has to be identified, and if a load-bearing wall is touched it is a major works licence with a project and technical supervision. We explain it in the guide to [when a major works licence is needed in Spain](/en/guides/major-works-licence-spain-when-needed/).

### Facade, terraces and common elements

External windows, balcony enclosures, fixed awnings, pipes through the facade, waterproofing a terrace that sits above a neighbour: these are common elements or affect them. They need the agreement of the comunidad de propietarios (the community of owners) under the Spanish horizontal property law and a municipal procedure. They also usually involve working at height. It is neither DIY nor only your business; see [community of owners permission for renovations in Spain](/en/guides/community-of-owners-permission-renovation-spain/).

### Buried plumbing and tiling

You can change a tap. You should not move a water feed or a waste inside a wall that is then tiled. A faulty joint is not noticed on the day of the work; it is noticed months later on the downstairs neighbour's ceiling. And tiling, although it needs no certificate, is the item where a home-made job shows most and costs most to redo: shower falls, waterproofing under the tray, flatness and joints. That is why it appears as "not recommended" in the table.

## How much you really save

**By doing the painting, the clearance and the furniture assembly yourself you save the labour on those items, which in a full renovation is a small part of the total; the saving is real, but it does not change the order of magnitude of the budget.** What can change it, for the worse, is a mistake on an item you should not have touched.

To put it in context: a full flat renovation costs €450 to €900 per m², VAT not included, depending on specification, and a complete bathroom €5,500 to €12,000, VAT not included. Most of that goes on services, building work, tiling, joinery and materials, which are precisely the items you will not be doing yourself. The guide to [renovation cost per m² in Alicante](/en/guides/renovation-cost-per-m2-alicante/) has the breakdown.

There are three ways the saving disappears:

- **Delaying the trades.** If the painter, who is you, does not finish on time, the carpenter cannot fit and the kitchen does not go in. Every day of delay has a cost. If you are flying in for a week to do it, the risk is obvious.
- **Redoing.** A badly levelled laminate floor or a wall painted before the electrician came through is redone with material and time.
- **Losing the guarantee.** The company guarantees what it carries out. If your item affects theirs (for example, a shower seal done by you on a tray the company fitted), the line of responsibility blurs.

The right way to do it is to agree it beforehand. In our fixed itemised quote we put in writing what is excluded, when you come in and what our written guarantee covers. No surprises. The guide to [how to read and compare a Spanish renovation quote](/en/guides/how-to-read-and-compare-a-spanish-renovation-quote/) shows how to identify those items.

## Common mistakes

- **Starting to demolish "to get ahead".** Without knowing what is behind the wall or having filed the municipal paperwork. It is the mistake with the most consequences: structure, neighbours' services, works stopped.
- **Doing the electrics "temporarily" yourself.** There is no such thing as temporary in a consumer unit. Either the registered installer does it or there is no boletín and no connection.
- **Painting too early.** The most harmless but most frequent mistake: you paint, then come the chases, the plasterboard and the joinery, and you repaint.
- **Tiling a bathroom without waterproofing or falls.** It looks good for three months. Then, damp.
- **Buying materials without asking.** The owner buys a shower tray or a floor that does not fit the measurements or the installation, and the company cannot guarantee a material it did not supply. This happens a lot with items ordered online from the UK.
- **Not agreeing in writing who does what.** "I'll paint it myself" said in passing ends in arguments over who fills the chases and who cleans.
- **Working at height or in dust without protection.** A leaning ladder, no mask when sanding gotelé, no goggles when chiselling. Domestic accidents on building sites are very common.
- **Forgetting the municipal procedure because "I'm doing it myself".** The permit depends on the work, not on who carries it out.

## When to call a professional

**Call a company or a registered installer for anything that needs a certificate (electrics, gas, air conditioning), touches the structure or common elements, or is hidden behind a finish (buried plumbing, waterproofing, tiling). Keep the painting, strip-out, furniture assembly and cleaning for yourself, and agree the split in writing.** It is the combination that saves without risking.

In practice, the scheme that works best on our jobs is this:

1. **You clear and dismantle** before we come in, following the instructions from the technical visit.
2. **We do the demolition, building work, services, tiling, joinery and plasterboard**, with a single project manager from start to finish and the certificates for each installation.
3. **You paint and assemble furniture** once the work is handed over, or we leave it included if you would rather not complicate things.
4. **Everything is in writing** in the fixed itemised quote: included, excluded and guarantee.

For owners who live abroad, the honest version of this is usually steps 2 and 4 only, with photo and video updates as each stage finishes, and the clearance and assembly included in the quote; it costs a little more and removes the risk of a half-finished job waiting for your next flight.

If you are planning a [full home renovation in Alicante](/en/full-home-renovation-alicante/) and want to take on part of the work, tell us on the free technical visit: we will tell you honestly what is worth doing yourself and what is not, and give you a fixed itemised quote with your part excluded, without obligation. You can book it through the [contact](/en/contact/) page.
