# Community facade renovation in Spain: the process and how the cost is split

Renovating the facade of a Spanish apartment block costs €40 to €120 per m² of facade, VAT not included, depending on the damage (paint, render, balcony fronts with rusted reinforcement, external insulation) and the access method (scaffolding, cherry picker, rope access). The process starts with a technical report, goes through the owners' meeting (junta), the town hall licence and the permit to occupy the pavement, and the cost is shared between owners according to each property's participation coefficient unless the community statutes say otherwise.


## Community facade renovation: the short answer

**Renovating the facade of a building costs €40 to €120 per m² of facade, VAT not included, plus access equipment and technician's fees. The process has six steps: technical report, itemised quotes, agreement and derrama at the owners' meeting, licence and pavement occupation permit, works with scaffolding or rope access, and sign-off. The cost is shared, as a general rule, according to each property's participation coefficient.**

These are the 2026 guide prices we work with in Alicante and within 45 km, the same ones you will find on our [facade renovation in Alicante](/en/facade-renovation-alicante/) page. This guide explains what drives the price, how a community organises itself so the process does not drag on for years, what the Spanish Horizontal Property Law and the building inspection say in general terms, how the derrama is calculated, and what is specific to Alicante facades: 1960s to 1980s blocks, salt air and balcony fronts with burst reinforcement.

A few Spanish terms first, because you will meet them in every email from your administrator. The comunidad de propietarios is the community of owners, the body that owns the common parts of the block; the junta is its general meeting; the administrador de fincas is the professional managing agent; the derrama is a special levy raised on top of the ordinary fees to pay for a specific job; and the coeficiente de participación is the percentage share each flat holds in the building, set out in the title deeds.

## Prices by type of intervention

**The facade is charged per m² of facade surface, not per m² of flat, and the price depends above all on how much has to be hacked off and repaired before finishing.**

| Intervention | 2026 guide price (VAT not included) | When it applies |
|---|---|---|
| Cleaning, repair of render cracks and painting | Bottom of the €40 to €120 per m² range | Sound facade with a tired finish |
| Repair of balcony fronts, cornices and parapets with rusted reinforcement | Middle of the range | Spalling concrete, visible rust; the most common case on the coast |
| Replacement of loose cladding (stone, monocouche render, face brick) | Middle to upper range | Falling pieces, hollow areas, risk to the pavement |
| External wall insulation (ETICS, called SATE in Spain) with finish | Upper range | Energy upgrade; usually combined with prior repair |
| Access equipment: scaffolding, platform, rope access | Quoted separately | Depends on height, access and type of work |
| Technician's fees (report, project, supervision) and town hall fees | Depends on technician and municipality | Not our item |

| Work that often goes with it (VAT not included) | Guide price |
|---|---|
| Waterproofing of the roof or terraces | €25 to €60 per m² |
| Painting of internal common areas | €8 to €14 per m² |
| Replacement of windows in common areas | €350 to €900 per unit |

What moves the price within the range: the state of the concrete (how many metres of balcony front have to be hacked off and rebuilt), the type of existing finish and the one chosen, the height and perimeter (a narrow eight-storey facade has more scaffolding per useful m² than a wide four-storey one), the internal light wells (usually in worse condition than the main facade and harder to reach) and the number of elements to be removed and refitted (awnings, air conditioning units, grilles, washing lines).

## Step 1: the technical report and the building inspection

**Before asking for quotes you need to know what is wrong with the facade; if the building is subject to the periodic technical inspection, that report is the starting point.**

In the Valencia region and in the municipalities around Alicante, buildings over a certain age must pass a periodic technical inspection (the building evaluation report, or whatever name each administration uses) in which a technician checks facades, roofs, structure and services and records the defects. If your building is subject to it, the administrator will know; if the report flags facade defects, the community has to correct them, and it is far better to do so with an organised renovation than patch by patch.

If the building is not subject to it or the report is old, ask an architect or technical architect for a report on the state of the facade. It should include: the cause of each defect (not just the symptom), affected areas with photos, priority (risk of pieces falling onto the pavement first), recommended scope and, if the works require it, the project or technical memorandum the town hall will ask for. A report of this kind costs far less than badly sized works and stops every company quoting for a different job.

Which cracks are in the render and which need a structural engineer is explained in our guide on [cracks in the facade: render or structural](/en/guides/cracks-in-the-facade-render-or-structural/).

## Step 2: comparable itemised quotes

**The community should ask several companies for quotes with the same scope; if each quote describes a different job, the meeting cannot compare them and ends up choosing on the bottom line.**

A serious facade quote separates at least these items: access equipment (scaffolding with netting, erection and dismantling, monthly hire, or rope access by the day), protection (canopies over entrances, sheeting), hacking off and preparation (per m² or per linear metre of balcony front), concrete repair with passivation of the reinforcement and repair mortar, crack sealing, render or finish (paint, monocouche, cladding, external insulation), elements to be removed and refitted, waste management and final clean, and timeline and guarantee. Ask for every item to carry a measurement and a unit price: if the technician measured 320 m² of facade and 180 linear metres of balcony front, every company should quote on those measurements. How to spot missing items and "to be confirmed on site" clauses is covered in [how to read and compare a Spanish renovation quote](/en/guides/how-to-read-and-compare-a-spanish-renovation-quote/).

One detail that avoids arguments: agree in the quote how unforeseen work is measured. On 1960s to 1980s concrete facades, hacking off always reveals more rusted reinforcement than was visible; a unit price per linear metre of repaired balcony front lets the figure be adjusted without renegotiating the whole job.

## Step 3: the meeting, the majorities and the derrama

**The facade is a common element; its upkeep is compulsory for the community and its cost is shared according to the participation coefficient, unless the statutes set another rule.**

### What is voted on

The Horizontal Property Law (Ley de Propiedad Horizontal) distinguishes, in general terms, between works needed for the conservation and safety of the building, which the community is obliged to carry out and which are agreed by ordinary majority (no owner can block a necessary repair), and improvement works, which require the majorities in article 17 and, in some cases, allow owners who vote against to be excused from paying if the cost exceeds certain limits. Repairing balcony fronts that are falling off is conservation; adding external insulation or changing the look of the facade is usually treated as an improvement, although the rules give more favourable majorities to works that improve energy efficiency. The administrator and the technician should state in the notice of the meeting which category each item falls into; that is what prevents the resolution being challenged.

If you cannot attend the meeting in person, you can give a proxy (delegación de voto) to another owner or to the administrator. For owners abroad this is the normal way to vote; ask the administrator for the form well before the date.

### How the derrama is calculated

The ordinary split is by participation coefficient: the percentage assigned to each flat or unit in the deed of horizontal division. If the works cost €100,000 and your coefficient is 2.5%, your share is €2,500. The statutes have to be read because they can set another rule (for example excluding commercial units from certain costs, or equal shares), and the schedule has to be decided: single payment, monthly instalments during the works, or finance arranged through the community. The prudent approach is to approve a sum somewhat above the quote to absorb concrete surprises, and refund the surplus.

### The reserve fund and grants

Communities must keep a reserve fund (fondo de reserva) that can be used for conservation works; it often covers the technical report and the start of the works. On public grants for building renovation: programmes exist and change over time, with more support when the works improve energy efficiency. Ask whether your works may qualify for current grants or tax relief; we point you in the right direction, and the application is handled by the community with its administrator and technician. For notices, minutes and deadlines, read [community of owners permission for renovations in Spain](/en/guides/community-of-owners-permission-renovation-spain/).

## Step 4: licence, scaffolding and occupying the pavement

**Renovating a facade without altering its configuration is generally processed as minor works by declaración responsable or licence, with technical documentation when there is structural repair or insulation; scaffolding on the pavement also needs a pavement occupation permit.**

The town halls of Alicante, Elche, Benidorm or San Vicente each have their own procedure, and the fees depend on the budget and on the metres of pavement occupied and for how many days. In listed buildings or old quarters the licence may impose conditions on colours and materials. We prepare the documentation with our collaborating technicians and file the applications as part of the job; the general rules are in our guides on the [minor works licence in Alicante](/en/guides/minor-works-licence-alicante/) and on [when a major works licence is needed](/en/guides/major-works-licence-spain-when-needed/).

On the access method:

- **Tube scaffolding with netting.** Essential when concrete has to be hacked off and repaired, cladding replaced or insulation fitted. It allows the whole facade to be worked at once and protects the pavement. Its cost depends on area, hire period and access; in the narrow streets of the city centre or Carolinas the erection has to be studied.
- **Elevating platform.** For facades accessible from the street and short jobs.
- **Rope access.** Operatives on ropes for cleaning, painting and spot repairs on tall buildings in Playa de San Juan or Benidorm, where full scaffolding does not pay. Not suitable for heavy work.

During the works the community must provide a protected entrance with a canopy, the temporary removal of awnings and air conditioning units (speak to each owner beforehand), and security: a scaffolded facade is a way into the flats, and it is worth agreeing this with the community's insurer.

## Step 5: the works, in the right order

**A facade is renovated from top to bottom and from the inside out: first the substrate is prepared and repaired, then protected, and finally finished.**

1. **Erection of access equipment and protection.** Scaffolding, netting, canopies, sheeting.
2. **Inspection with the scaffolding up.** This is when the real state of cornices, balcony fronts and render is seen; the measurement is adjusted with the supervising technician.
3. **Hacking off and preparation.** Loose concrete is removed down to sound material and the rusted reinforcement exposed. On the coast this is the item that grows most against the forecast.
4. **Structural concrete repair.** Rust removal, passivation of the bars, compatible repair mortar, rebuilding of the geometry. Done with systems designed for the purpose, not ordinary cement.
5. **Crack sealing and joint treatment.** According to type: elastic bridging on live cracks, filling on stable cracks.
6. **Waterproofing of critical points.** Sills, parapet cappings, junctions with the roof. If the roof is also failing, it is coordinated with the roof waterproofing; see our guide on [terrace waterproofing cost](/en/guides/terrace-waterproofing-cost/).
7. **Render and finish.** Facade paint (elastomeric or silicate depending on the substrate), monocouche, cladding or an external insulation system with its finish. Light colours on west-facing elevations help with the heat.
8. **Refitting of elements, cleaning and dismantling.** Awnings, units, grilles; waste removal; scaffolding down.
9. **Sign-off with the supervising technician and written guarantee.**

All the work must meet the requirements of the Spanish Building Code (Código Técnico de la Edificación, CTE) for the building envelope and protection against damp, and the conditions of the licence.

## Facades in Alicante: salt air, 1960s to 1980s concrete and sun

**Alicante facades suffer three things: salt air that rusts the reinforcement in balcony fronts and cornices, 1960s to 1980s concrete with little cover over the steel, and sun that ages paints and renders.**

In Playa de San Juan, Albufereta, Cabo de las Huertas, El Campello, Santa Pola, Guardamar or Torrevieja, balcony fronts with spalling concrete are defect number one in technical inspections. Chloride from the marine environment penetrates the concrete, rusts the reinforcement, the rust takes up more volume than the steel and bursts the cover. The lasting solution is repair with passivation and repair mortar, not filler and paint. In blocks in the city centre, the Ensanche, Carolinas, San Blas or Benalúa the problem is more often tired render, shrinkage cracks and cornices; and in internal light wells, damp and downpipes.

Timing: concrete repair and render work are best done from spring to early autumn, avoiding the torrential rains of September and October and the days of extreme heat that dry mortars too fast. A well-planned facade job is approved in winter and carried out in spring.

## Common mistakes

- **Painting without repairing.** The facade looks good for two years and the concrete spalls again; the scaffolding is paid for twice.
- **Quotes without common measurements.** Each company quotes for a different job and the meeting compares apples with oranges.
- **Approving the derrama to the last cent.** Hacking off reveals more rusted steel; with no margin, the job stops halfway to call another meeting.
- **Not distinguishing conservation from improvement in the notice.** Grounds for challenging the resolution.
- **Choosing rope access for hacking-off work.** It is cheap and does not allow proper repair; the scaffolding ends up being needed anyway.
- **Forgetting the internal light wells.** Usually in worse condition than the main facade and not visible from the street.
- **Repainting with ordinary paint over monocouche or salt-laden substrates.** It peels; the paint has to be chosen for the substrate.
- **Not checking the roof at the same time.** The scaffolding is already up; redoing parapets and roof junctions in a separate job costs another set of scaffolding.

## When to call a professional

**A community can organise the process (report, quotes, meeting) with its administrator; the technical inspection, the project and the supervision belong to a chartered technician, and work at height over a public pavement is always for a company with insurance and certified access equipment.**

The community can do: gather the existing inspection report, photograph the damage, check the statutes on cost sharing, ask for quotes with common measurements, call the meeting with a properly drafted agenda and manage the derrama.

A professional is needed for: diagnosing causes (a crack can be in the render or in the structure), the project or technical memorandum and site supervision the town hall requires, erecting scaffolding with netting and canopies over the pavement, concrete repair with passivation of the reinforcement, external insulation and any work at height. And for the works themselves, a company that quotes item by item with measurements, gives a written guarantee and has a single point of contact the administrator and the president can deal with from start to finish. For owners who are not resident, that single contact also means you can follow the job by email and photos rather than relying on second-hand accounts from the meeting.

If you would like us to do it, we visit the building within 48 to 72 hours in Alicante and the surrounding area, inspect the facade with our collaborating technicians and give the community a fixed itemised quote with measurements, free and without obligation, with licence management and a written guarantee on the work. See our [facade renovation in Alicante](/en/facade-renovation-alicante/) service or book your visit through [contact](/en/contact/).