# How much does a bathroom renovation cost in Alicante in 2026

A full bathroom renovation of 4 to 6 m² in Alicante costs €5,500 to €12,000, VAT not included, and a small guest WC costs €3,500 to €6,000. The work takes 2 to 3 weeks. The final figure depends on whether the pipework and wiring are replaced, the grade of tiles and sanitaryware you choose, and whether the flat is in a 1960s to 1980s block in the city or a coastal apartment exposed to salt air.


## Bathroom renovation cost in 2026: the short answer

**A full bathroom renovation of 4 to 6 m² costs €5,500 to €12,000, VAT not included, and a small guest WC costs €3,500 to €6,000. The work takes 2 to 3 weeks.** If all you want is to replace the bath with a walk-in shower, the price drops to €950 to €2,200 and the job is done in 1 to 2 days.

These are the guide prices we work with in Alicante and within 45 km of the city, and they are the same ones you will find on our [renovation prices page](/en/renovation-prices-alicante/). Within that range, three decisions decide whether you land near the bottom or the top: whether you renew the pipework and wiring, what grade of materials you pick, and whether you change the layout. This guide breaks down each item so you know what you are paying for and can estimate your own budget before asking anyone for a quote, whether you live in the flat or manage it from the UK or Ireland.

A note on the Spanish terms you will meet: IVA is Spanish VAT; a declaración responsable is the signed declaration filed with the town hall (Ayuntamiento) for most interior works; the comunidad de propietarios is the community of owners that manages the block, similar to a residents' management company. We explain each where it matters.

## Bathroom renovation prices item by item

**A serious bathroom quote has 10 to 14 line items; if the one you have been given has three lines, information is missing.** This table shows what each item covers and what usually moves its price. The total ranges are our 2026 guide prices; the share of each item within the total is indicative and changes with every bathroom.

| Item | What it covers | What moves the price |
|---|---|---|
| Strip-out and waste removal | Removing wall and floor tiles, sanitaryware and bath, taking rubble to the skip | Thickness of the old tiling, no lift in the building, distance to the skip |
| Plumbing | New hot and cold feeds, waste pipes, isolation valves | Change of layout, lead or iron pipes, old soil stack |
| Electrics | Light points, protected sockets, extractor fan, earth connection | No earth in the flat, old consumer unit, lighting in the shower or mirror |
| Building work | Screeds, shower falls, partition walls, rendering | Tiled wet-room floor, shower niche, lowered ceiling |
| Tiling | Laying wall and floor tiles, grouting | Large format, rectified tiles, herringbone layouts |
| Sanitaryware and taps | Toilet, basin, taps, shower tray or bath | Grade of the pieces, wall-hung toilet with concealed cistern |
| Shower screen | Fixed, sliding or hinged, toughened glass | Standard or made to measure, anti-limescale treatment |
| Vanity unit and mirror | Unit with basin, mirror with or without lighting | Made to measure unit, stone worktop |
| Painting and ceiling | Moisture-resistant plasterboard ceiling, anti-mould paint | Ceiling area, recessed lighting |
| Management and cleaning | Declaración responsable, skip, final clean | Town hall fees, floor level and access |

| Type of job | 2026 guide price (VAT not included) | Timeline |
|---|---|---|
| Full bathroom 4 to 6 m² | €5,500 to €12,000 | 2 to 3 weeks |
| Small guest WC | €3,500 to €6,000 | 1 to 2 weeks |
| Bath to shower conversion | €950 to €2,200 | 1 to 2 days |
| Microcement over existing tiles | €70 to €120 per m² | Depends on area |
| Painting walls and ceilings | €8 to €14 per m² | 1 to 2 days |

Plumbing, electrics and building work are the items you can trim least: they are the base everything else sits on, and if they are done badly the walls have to come off again. Where there is real room to move is in the finishes: tiles, sanitaryware, taps, shower screen and vanity unit.

## What makes a bathroom cost €5,500 or €12,000

**The gap between the bottom and the top of the range is not labour, which is similar in both cases, but scope and materials.** These are the factors that weigh most, in order.

### 1. Keeping or changing the layout

Leaving the toilet, basin and shower where they are is the cheapest option, because the feeds and wastes already reach their positions. Moving the toilet means relocating the 110 mm soil connection and sometimes raising the floor to create a fall; moving the shower means new feeds and a new drain. In 1960s to 1980s flats in the city centre, Carolinas or Benalúa, the soil stack usually sits in one corner of the bathroom and the original layout was designed around it. Changing it is possible, but it costs.

### 2. State of the pipework and wiring

If the pipes are lead, galvanised iron or leaking copper, they have to be replaced: there is no sense in tiling over an installation that is going to fail. The same goes for wiring with no earth or no RCD (what Spanish electricians call the diferencial). In a 1970s bathroom we assume everything gets renewed; in a 1990s apartment in Playa de San Juan part of it can sometimes be kept. We check this on the technical visit so it does not surface as an "unforeseen extra" halfway through, which is the one thing an owner abroad cannot easily deal with.

### 3. Grade of materials

A mid-format ceramic tile and basic-range sanitaryware give you a correct, durable bathroom at the lower end of the range. Large-format rectified porcelain, a wall-hung toilet with concealed cistern, thermostatic taps and a made-to-measure screen put the bathroom at the upper end. Neither option is better in the abstract: it depends on how much the bathroom will be used, whether it is your main home or a holiday let, and whether appearance or low maintenance matters more to you. For a rental property, hard-wearing mid-range usually makes more sense than top-range.

### 4. Shower tray, bath or tiled wet-room floor

A resin or ceramic tray is the quickest and cheapest option. A tiled floor-level shower, finished in tiles or microcement, needs the floor built up, falls formed and perfect waterproofing; it looks very good, but it adds building work and risk if badly executed. We cover the choice in the [bath to shower conversion cost guide](/en/guides/bath-to-shower-conversion-cost/).

### 5. Old building or coastal apartment

In older buildings there are surprises: a load-bearing wall where you expected a partition, asbestos-cement soil stacks, shallow floor slabs with no room to bury wastes. In apartments near the sea, in Albufereta, Cabo de las Huertas or Santa Pola, salt air attacks metal fittings and hinges, so it pays to choose materials that resist it. None of this prevents the renovation, but it affects the budget and should be seen before the quote is signed.

## How to work out your bathroom budget step by step

**You can make a reasonable estimate in half an hour with a tape measure and these six questions.** It is no substitute for a fixed quote, but it tells you which band you are in and helps you spot incomplete quotes.

1. **Measure and define the scope.** Note the floor area and the wall area (height times length of each wall, minus the door). Decide whether you want new finishes, a complete renovation, or just a bath to shower swap. A 4 m² bathroom with a 2.5 m ceiling has about 20 m² of wall: that is the figure that drives the tiling.
2. **Check the services.** Look at what the visible pipes are made of (under the basin, behind the toilet), whether there are damp stains on the ceiling or on the wall by the soil stack, and whether the sockets are earthed. If the building is pre-1980s and nobody has renovated the bathroom, count on new services. If you are abroad, ask your key holder for photos of these three spots.
3. **Choose your grade.** Visit a showroom or browse catalogues and settle on a level: basic, mid or high. It is the decision that moves the total most, so make it before asking for quotes, not after.
4. **Add up the items.** Go through the table above and check your quote covers all ten. The ones that usually go missing are waste removal, the declaración responsable, the ceiling and the painting.
5. **Add VAT and a contingency.** If you are a private individual and the property is more than two years old, the work is usually charged at 10% IVA when materials are no more than 40% of the taxable base; every other case is 21%. Keep a small reserve for what appears once the tiles come off.
6. **Compare fixed, itemised quotes.** Ask for two or three and compare scope against scope. A fixed quote is the single most useful tool for an owner who is not on site.

## Where to save and where not to on a bathroom renovation

**Save on what is easy to change later, not on what ends up behind the tiles.** That is the rule we apply when a client asks us to bring a quote down without losing quality.

Where you can save:

- **Keep the layout.** If the bathroom works, do not move the toilet.
- **Tile to half height** outside the shower area and paint the rest with anti-mould paint. Fewer square metres of tile and fewer hours of laying.
- **Mid-format tiles** instead of large format: faster to lay and less wastage.
- **Standard shower tray** (70 x 120, 80 x 120) rather than made to measure.
- **Standard-size shower screen** and an off-the-shelf vanity unit instead of bespoke.
- **Microcement over the tiles** when the services are sound and you only want a new look: €70 to €120 per m², VAT not included, with no rubble. See our [microcement in Alicante](/en/microcement-alicante/) page.

Where it does not pay to save:

- **Plumbing and electrics.** These are the items you cannot see and the most expensive to redo.
- **Waterproofing of the shower area.** A properly applied membrane or tanking slurry is what keeps the stain off your downstairs neighbour's ceiling, and keeps you out of a dispute with the comunidad.
- **Taps.** The difference between budget and mid-range taps shows within two years with Alicante's hard water.
- **Labour.** A tiler who lays large format level with aligned joints does not charge the same as one who does not, and you see it on every wall.

## Renovating a bathroom in Alicante: local specifics

**In Alicante a bathroom budget has three local variables: the age of the building, how close it is to the sea, and the dealings with the community of owners and the town hall.**

In the 1960s to 1980s flats of the city centre, the Ensanche, San Blas, Carolinas or Benalúa, bathrooms are usually small, with a bath, an asbestos-cement soil stack and tiles to the ceiling. The usual renovation is complete: services renewed, bath replaced by a shower, and space gained with a wall-hung toilet or a slim vanity unit. In these buildings it is wise to inform the comunidad de propietarios before starting, especially if the shared soil stack is involved. In practice this means a note to the administrador (the block's managing agent) with the dates and a copy of the declaración responsable; we prepare it for you.

In the apartments of Playa de San Juan, Albufereta, El Campello or Gran Alacant the problem is usually salt air and condensation: rusted fittings, pitted screen profiles, mould on the ceiling. We pick taps and accessories with finishes that resist the marine environment, extractor fans with a timer, and anti-mould paint for ceilings. In the villas of Mutxamel, Busot or Sant Joan the issue is water: irregular pressure, water heaters far from the bathroom and sometimes polybutylene pipework worth checking.

On permits: an interior bathroom renovation that does not touch the structure or the facade is processed in Alicante through a declaración responsable or a licencia de obra menor. We handle this within the quote. The same logic applies in Elche, Benidorm, Torrevieja and the other town halls in our area; only the forms differ.

## Timeline: how long it takes and what delays it

**A full bathroom renovation takes 2 to 3 weeks; a guest WC a little less; a bath to shower swap 1 to 2 days.** The usual order is strip-out (1 to 2 days), plumbing and electrics (2 to 3 days), building work and screeds (2 to 3 days), tiling (3 to 5 days), ceiling and painting (1 to 2 days) and fitting of sanitaryware, screen and vanity unit (1 to 2 days), with drying time between stages.

What stretches a bathroom job is almost never the work itself but the logistics: a tile delivered late, a made-to-measure screen ordered once the tiling is already done, or a change of mind on the vanity unit. That is why we have all materials confirmed and ordered before we start. For owners abroad we agree the full specification by email or video call first, then send photos at the end of each stage, so you can see the strip-out, the new pipework before it is covered, the tiling and the finished room without flying over.

## Common mistakes

- **Comparing quotes by the total alone.** A €6,000 quote with no ceiling, no painting and no waste removal ends up costing more than a €7,000 one that includes everything. Compare item by item.
- **Choosing materials after signing.** The quote is priced on one grade and the client picks another in the showroom; "extras" appear. Decide the grade first.
- **Tiling over old services.** It saves a few hundred euros today and forces you to rip out a new bathroom when the iron pipe fails.
- **Moving the toilet for no reason.** It is the most expensive plumbing item and often does not improve the bathroom.
- **Forgetting ventilation.** A bathroom without a window needs an extractor; without one, mould appears the first winter, especially in internal flats and near the sea.
- **Ordering the screen last.** Made-to-measure screens take time to make; if ordered after tiling, the bathroom sits unusable for weeks.
- **Not planning the tray level.** A low-profile tray needs the drain at the right height; it is decided before the screed goes in, not after.
- **Starting without telling the community or filing the declaración responsable.** A neighbour's complaint can stop the job and an inspection can fine it. For an owner abroad this is the hardest problem to fix at a distance.

## When to call a professional

**You can do the tile removal, the painting and the fitting of accessories yourself; anything involving water, electricity and the waterproofing of the shower is best left to a professional.** And some things are not only dangerous but cannot legally be done without a qualified installer.

If you have the hands and the time, you can take tiles off (goggles, gloves and great care with the pipes running inside the wall), paint ceilings, assemble an off-the-shelf vanity unit or fit accessories. You can also take charge of ordering and receiving materials, which is a big part of the coordination.

You need a professional for the plumbing (especially wastes and connections to the soil stack), for the electrics (bathroom circuits have specific protection requirements under the Spanish low-voltage regulations, the REBT) and for the waterproofing of the shower, because a failure shows up on the neighbour's ceiling months later. Large-format tiling also shows very clearly when done by someone without experience. The declaración responsable can be filed by the owner, but it is simpler for the renovation company to handle it together with the work, and essential if you are not in Spain.

If you would like us to do it, we visit within 48 to 72 hours in Alicante and the surrounding area, measure the bathroom, check the services and give you a fixed itemised quote, free and without obligation, with a written guarantee on the work and a single English-speaking project manager from start to finish. See our [bathroom renovation in Alicante](/en/bathroom-renovation-alicante/) service or book your visit through [contact](/en/contact/).