# How much does a bath to shower conversion cost

Replacing a bath with a walk-in shower tray costs €950 to €2,200, VAT not included, and takes 1 to 2 days. The price includes removing the bath, fitting the tray and drain, the screen and partial retiling of the area. If you want to renew the rest of the bathroom as well, a full bathroom renovation costs €5,500 to €12,000.


## Bath to shower conversion cost: the short answer

**Replacing a bath with a shower tray costs €950 to €2,200, VAT not included, and takes 1 to 2 days. The price includes removing the bath, fitting the tray and the drain, the screen and partial retiling of the area.** It is the most requested bathroom job in Alicante and the one with the best ratio between what it costs and how much it changes daily life, especially for older owners and for holiday lets where guests prefer a walk-in shower.

These are the 2026 guide prices we work with in Alicante and within 45 km, the same ones you will find on our [bath to shower conversion](/en/bath-to-shower-conversion-alicante/) page. In this guide we explain what sits inside that range, why the same job can cost €950 or €2,200, what to decide before hiring and when it makes sense to go for a full bathroom renovation instead.

## What the price includes and what moves it

**A bath to shower conversion has five items: removal, drain and feeds, tray, tiling and screen. The two that move the price most are the tray and the screen.**

| Item | What it covers | What moves the price |
|---|---|---|
| Bath removal | Dismantling bath, taps and panel; taking off the tiles in the recess; removing rubble | Cast iron bath (very heavy), no lift in the building |
| Drain and feeds | New drain in the tray position, trap, check of water feeds | Low-profile tray that needs a raised floor, drain far from the soil stack |
| Shower tray | Resin, ceramic or acrylic tray, levelled and sealed | Standard or made to measure, textured resin, colour |
| Partial retiling | Tiles on the wall and floor that were behind the bath | Finding a matching tile, or retiling the whole shower area with a new one |
| Screen | Fixed, sliding or hinged; toughened glass | Made to measure, anti-limescale treatment, coloured profiles |
| Taps (optional) | Mixer or thermostatic, shower rail | Grade, concealed |

| Option | 2026 guide price (VAT not included) | Timeline |
|---|---|---|
| Bath to shower tray conversion | €950 to €2,200 | 1 to 2 days |
| Full bathroom (if you decide to go further) | €5,500 to €12,000 | 2 to 3 weeks |
| Small guest WC, complete | €3,500 to €6,000 | 1 to 2 weeks |
| Microcement over the tiles in the rest of the bathroom | €70 to €120 per m² | Depends on area |

At the lower end of the range is the simplest case: a standard 70 x 160 bath, a standard-size resin tray, an off-the-shelf sliding screen and retiling of the hidden strip with a similar tile. At the upper end are made-to-measure trays in slate-textured resin, a bespoke fixed glass panel with anti-limescale treatment, new thermostatic taps and full retiling of the shower area with a contrasting tile as a decorative feature.

## Types of shower tray and how much they change the price

**The resin tray is the one we fit most in bath conversions because it is cut to size, is non-slip and sits low; ceramic is cheaper, and a tiled wet-room floor is the dearest and the most versatile.** Here is the summary that matters for the budget.

- **Resin (mineral-filled).** Light, cut on site to fit the exact recess of the bath (which is almost never a round number), non-slip texture and 3 to 4 cm high. Wide choice of colours and finishes. It is the default option.
- **Ceramic (porcelain).** Cheaper and very durable; taller (it often needs a step) and more slippery. It comes in fixed sizes, so sometimes the gap has to be filled with building work.
- **Acrylic.** Light and cheap, but it scratches and can flex if the support is not perfect. Less advisable for a bathroom in daily use.
- **Tiled floor-level shower.** Falls formed on site, waterproofing with a membrane or tanking mortar, and a finish in tiles or microcement. Flush with the floor and no visible joints, but it needs a raised screed, more days and very careful execution. It usually belongs to a full renovation, not a quick bath swap.

The height of the tray dictates the drain. In 1960s to 1980s flats in the city centre, Carolinas or San Blas, the bath waste is usually shallow and, for a low-profile tray, the floor sometimes has to be raised a few centimetres or a low-profile trap used. We check this on the visit, not on the day of the job.

## Screens: the second heaviest item

**An off-the-shelf screen in standard sizes costs far less than a bespoke fixed glass panel, and the difference is more about looks and cleaning than function.**

- **Sliding, two or three panels.** The most common in bath recesses (160 to 170 cm). Good value; the tracks collect limescale with Alicante's hard water, so an anti-limescale treatment and occasional cleaning of the rollers are worth it.
- **Fixed glass panel, or fixed plus hinged.** A single sheet of 6 to 8 mm glass, very easy to clean and visually clean. It is what is asked for most in coastal apartments and in tastefully renovated bathrooms. It leaves part of the recess open, so the tray must have a correct fall.
- **Hinged or folding.** Useful in small bathrooms where a sliding screen does not fit or gets in the way of the door.

Black, gold or bronze profiles and printed glass raise the price. Near the sea (Playa de San Juan, Albufereta, El Campello, Santa Pola), lacquered aluminium profiles resist salt air better than cheap chrome.

## How to work out your budget in five minutes

**Measure the bath recess, look at the state of the tiles and decide on tray and screen; with that you know where in the €950 to €2,200 range you sit.**

1. **Measure the recess.** Length and width of the bath and height of the tiling. Recesses of 160 to 170 x 70 to 80 cm are the usual ones. If you are abroad, your key holder or agent can send three photos and two measurements.
2. **Look at the tiles.** If they are sound and you like them, it is enough to retile the strip hidden by the bath with a similar tile, or with a different one as a contrast. If there are loose or hollow-sounding pieces, consider retiling the whole shower area.
3. **Check the drain and the feeds.** If the bath leaks, if the wall by the soil stack is damp or the pipes are lead, it is time to think about more than the tray.
4. **Choose tray and screen.** Standard resin and an off-the-shelf sliding screen leave you at the lower end; made to measure and fixed glass, at the upper end.
5. **Decide on the taps.** Now is the moment to change them if the current ones are more than ten years old; afterwards, with the screen in place, it is more awkward.
6. **Add VAT.** For private individuals with a property over two years old and materials below 40% of the base, 10% IVA; otherwise 21%. IVA is Spanish VAT and your quote should state which rate applies.

## When it pays to change just the bath and when to renovate the bathroom

**Change just the bath if the bathroom is less than 20 to 25 years old and the tiles, floor and services are sound; renovate the whole bathroom if there is damp, old pipework or loose tiles.**

The bath to shower conversion is a quick and cost-effective job because it makes use of everything that already exists. But if the bathroom is original to a 1960s to 1980s building, with an asbestos-cement soil stack, iron pipes and tiles to the ceiling, you are putting a new tray on a base that is going to fail. In that case a full renovation costs €5,500 to €12,000, VAT not included, and takes 2 to 3 weeks; the breakdown is in the [bathroom renovation cost guide](/en/guides/bathroom-renovation-cost-alicante-2026/).

An intermediate option that works well in Alicante: replace the bath with a tray and screen and apply microcement over the tiles in the rest of the bathroom (€70 to €120 per m², VAT not included). Without taking the walls off, the bathroom changes completely in appearance. See [microcement in Alicante](/en/microcement-alicante/).

## Accessibility: the most frequent reason

**Most of the bath to shower conversions we do in Alicante are for accessibility: climbing into a bath 50 to 60 cm high is the main cause of bathroom falls among older people.** A tray flush with the floor or 3 to 4 cm high, a hinged screen and a seat or grab rail change the independence of whoever uses it.

For these cases we recommend textured non-slip resin, thermostatic taps (they prevent scalding when the water is turned on) and grab rails fixed to solid masonry, not to plasterboard. If the person uses a shower chair, the tray should be as wide as possible and the screen should open outwards or be a fixed panel. Public grants for accessibility adaptations change every year; ask us whether your project qualifies for any current scheme and we will point you in the right direction. Many British and Irish owners who retire to the Costa Blanca make this the first change to the flat, and it is also what long-term tenants ask for most.

## Local specifics in Alicante

**In Alicante the job has two local variants: the older flats in the centre, with shallow wastes and cast iron baths, and the coastal apartments, where salt air dictates the materials.**

In buildings in the city centre, Benalúa, Carolinas, San Blas or El Pla, the baths are usually enamelled cast iron: they weigh well over a hundred kilos and carrying them down a staircase with no lift is an item in itself. The original tiles to the ceiling are rarely found again, so the usual solution is to retile the whole shower area with a new tile that contrasts or blends. And the wastes often run inside shallow floor slabs, which constrains the choice of tray.

In Playa de San Juan, Albufereta, Cabo de las Huertas, El Campello or Gran Alacant, the problem is the marine environment: screen fittings and profiles that pit, taps that lose their chrome. We choose lacquered profiles, glass with anti-limescale treatment and good-quality taps. If the apartment is a holiday let, the work is scheduled between bookings; in 1 to 2 days it is ready, and guests arriving on Friday never know.

On permits: it is minor interior work; in Alicante it is processed through a declaración responsable and we take care of it. For a two-day job most owners simply let the comunidad de propietarios know the date, which we can do on your behalf through the administrador.

## Common mistakes

- **Choosing a low-profile tray without checking the drain depth.** It is discovered when the bath comes out and forces a raised floor or a change of tray on the spot.
- **Buying the screen before the tray is fitted.** The real measurements of the recess are taken with the tray in place; a screen ordered beforehand may not fit.
- **Keeping the old taps to save money.** With the screen fitted, changing them is more awkward and dearer; do it in the same job.
- **A glossy ceramic tray with no non-slip finish.** Pretty and cheap, but in a shower used every day it is slippery; textured resin is better.
- **Not sealing the junction between tray and wall properly.** It is the main cause of leaks into the flat below months later, and the start of a dispute with the neighbour and the community.
- **Forgetting ventilation.** A shower without a bath splashes more and makes more steam; without an extractor, mould appears, especially in internal flats.
- **Doing it without telling the community.** A full day of drilling noise and rubble down the stairs; a note beforehand avoids complaints.
- **Hiring the first person who gives a price over the phone.** Without seeing the drain, the tiles and the access, any price is a guess.

## When to call a professional

**Removing the bath and preparing the recess can be done by a careful handyman; the drain, the sealing and the screen are best left to a professional, because a mistake shows up on the neighbour's ceiling.**

If you have experience, you can dismantle the taps, remove the panel, take the tiles off the recess and get the bath out (with help: a cast iron one is very heavy). You can also tile if you have tiled before. But the new drain with its trap and fall, the levelling and sealing of the tray and the plumb fitting of a toughened glass screen are jobs where a small error turns into a leak, a screen that will not close or a tray that creaks. And if lead pipes, damp in the wall or a damaged waste appear once the bath is out, a plumber is needed before going any further.

If you would like us to do it, we visit within 48 to 72 hours in Alicante and the surrounding area, measure the recess and check the drain, and give you a fixed quote, free and without obligation, with a written guarantee on the work. The job takes 1 to 2 days, and if you are not in Spain your project manager sends you photos before and after. See our [bath to shower conversion in Alicante](/en/bath-to-shower-conversion-alicante/) service or book your visit through [contact](/en/contact/).
